Vertical polypropylene wet scrubber tower with three inspection ports, recirculation pump and sump tank
ACID FUME SCRUBBER

Acid Fume Scrubber

Acid fume scrubbers from MUSI Technology, Changzhou, China, for electroplating, anodizing and pickling lines. Tank hoods, ductwork, packed tower, recirculation, mist eliminator, fan and stack are engineered as one system and matched to the bath chemistry of the line they serve. MUSI Technology ซึ่งตั้งอยู่ที่เมืองฉางโจว ประเทศจีน ออกแบบและผลิตอุปกรณ์นี้เองภายในบริษัท และได้ส่งมอบสายการพ่นสีแล้ว 800+ สายไปยัง 36 ประเทศ พร้อมการติดตั้งหน้างานและการฝึกอบรมผู้ปฏิบัติงาน

Rim and lip extraction hoods sized to the tank surface and the bath hazard.

Counter-current packed towers in polypropylene, PVC or fibreglass-reinforced plastic.

Water or caustic soda scrubbing with automatic pH dosing and level control.

Mist eliminators for chromic acid and sulphuric acid mist.

Scrubber blowdown routed to the wastewater treatment plant of the line.

ขอใบเสนอราคา โทรหาเรา

คำตอบแบบรวบรัด: An acid fume scrubber captures acid gas and mist from plating, anodizing and pickling tanks and washes it out of the exhaust air. Rim hoods draw the fumes into plastic ductwork; a fan pulls the air up through a packed tower against a downward flow of water or dilute caustic soda; a mist eliminator removes the remaining droplets. US EPA fact sheets give 95 to 99 percent as the removal efficiency vendors estimate for inorganic gases in packed-bed scrubbers. The spent liquor is bled to the wastewater treatment plant.

What is an acid fume scrubber and which tanks need one?

An acid fume scrubber is a wet scrubber, usually a vertical packed tower, that absorbs soluble acid gases and collects acid mist from process tank exhaust. Tanks that give off acid gas, acid mist or toxic vapour are extracted to one; in China, GB 21900-2008 requires local collection and central treatment of such fumes. Per US EPA AP-42, gassing at the electrodes carries fine mist off the bath, rising with bath strength, temperature and current density.

Tank or processWhat it emitsTypical treatment
Hydrochloric acid pickling and activationHydrogen chloride gas and mistPacked-bed scrubber with water or dilute caustic soda
Sulphuric acid pickling, sulphuric acid anodizing, acid copperSulphuric acid mist from gassing and air agitationMist eliminator and packed-bed scrubber
Nitric acid pickling, bright dipping, strippingNitrogen oxides (NOx): NO2 and NOPacked-bed scrubber; alkaline or reducing stage where NO must also be removed
Hydrofluoric acid and fluoride pickles (stainless steel, titanium, aluminium)Hydrogen fluorideAlkaline packed-bed scrubber
Hexavalent chromium plating and chromic acid anodizingChromic acid mist, caused by the low cathode efficiency of the bathMist eliminator and packed-bed scrubber, often with a fume suppressant in the bath
Cyanide plating and hot alkaline cleaningAlkaline mist; hydrogen cyanide from cyanide bathsSeparate duct and alkaline scrubber; kept away from acid exhaust

How does a packed-bed acid fume scrubber work?

It works by counter-current absorption: the exhaust gas rises through a bed of plastic packing while the scrubbing liquid trickles down over it as a thin film. The packing provides a large wetted surface, so the soluble acid passes from the gas into the liquid. In caustic scrubbing, the acid reacts with sodium hydroxide to form a neutral salt. Chromic acid droplets are humidified, grow in mass and impinge on the wet packing (US EPA AP-42).

A chevron-blade or mesh-pad mist eliminator above the sprays catches entrained droplets. A sump below the packing holds the liquor, which a pump returns to the nozzles; fresh water or reagent replaces the liquor bled off.

Vertical polypropylene wet scrubber tower with three inspection ports, recirculation pump and sump tank

What components does an acid fume scrubber include?

It includes extraction hoods, ductwork, the packed tower with its packing and distributor, a recirculation pump, a mist eliminator, the fan, the stack, and pH dosing and level control, running from the tank rim to the stack. Sizes and materials are fixed in the written specification for each project.

ส่วนประกอบหน้าที่ของสถานีTypical material
Rim / lip extraction hoodsSlot hoods along one or both long sides of the tank draw fumes sideways off the bath surfacePolypropylene or PVC
Ductwork and dampersCarry the exhaust to the scrubber; balancing dampers set the flow at each hoodPolypropylene, PVC or fibreglass-reinforced plastic (FRP)
Packed towerVertical shell with gas inlet, packing support, packed bed and liquid distributorPolypropylene, PVC or FRP
PackingRandom plastic packing (rings, saddles, polyhedral spheres) or structured packing for a large wetted surfacePolypropylene or PVC
Spray nozzles or distributorWet the packing evenly from abovePolypropylene or PVC
Recirculation pumpReturns liquor from the sump to the distributorPlastic-lined or solid plastic centrifugal pump
เครื่องกำจัดละอองChevron blades or mesh pad above the spray zonePolypropylene or PVC
พัดลมระบายอากาศOvercomes the pressure drop of hoods, ducts, packing and stackFRP or plastic-lined centrifugal fan
ปล่องระบายDischarges the cleaned air at the permitted height, with a sampling portFRP or polypropylene
pH / ORP dosingMeters caustic soda or a reducing agent to hold the set point of the liquorDosing pump, probe and controller
Level control and make-upKeeps the sump level; adds fresh water as liquor is bled offLevel switch or transmitter, solenoid valve

Plastics are used because gas and liquor are both corrosive. US EPA AP-42 states that chromic acid control devices are typically made of PVC or fibreglass, and the EPA cost manual notes that metal packings cannot be used for acid gas. The limit of plastics is temperature: EPA lists FRP as temperature-sensitive, so hot tank exhaust is checked against the material rating.

How much air must be extracted from each tank?

The extraction rate is set per square metre of tank surface, from the hazard class of the bath and the hood layout. The California open-surface tank regulation (Title 8, Section 5154) classifies each tank by the exposure limit or flashpoint of what it emits (A to D) and its rate of evolution (1 to 4, from liquid temperature, distance below the boiling point and evaporation rate), then gives a minimum control velocity and airflow per unit of tank surface.

Lateral (rim) exhaustMinimum control velocityHood on one side or two sides, tank against a wall or baffleHood on one side or two sides, free-standing tank
Class A-1 and A-2 (highest hazard)150 fpm (0.76 m/s)150 to 300 cfm/ft² (about 2,740 to 5,490 m³/h per m²)225 to 375 cfm/ft² (about 4,110 to 6,860 m³/h per m²)
Class A-3, B-1, B-2 and C-1100 ฟุต/นาที (0.51 ม./วินาที)100 to 200 cfm/ft² (about 1,830 to 3,660 m³/h per m²)150 to 250 cfm/ft² (about 2,740 to 4,570 m³/h per m²)
Class B-3, C-2 and D-175 fpm (0.38 m/s)75 to 150 cfm/ft² (about 1,370 to 2,740 m³/h per m²)110 to 190 cfm/ft² (about 2,010 to 3,470 m³/h per m²)
Class A-4, C-3 and D-250 fpm (0.25 ม./วินาที)50 to 100 cfm/ft² (about 910 to 1,830 m³/h per m²)75 to 125 cfm/ft² (about 1,370 to 2,290 m³/h per m²)

Within each range, the shape of the tank decides which figure applies.

Tank shapeWidth-to-length ratioFigure within the range
Long, narrow tankBelow 0.1Lower figure
Square tank, or wider than long1.0 to 2.0Higher figure

The arithmetic example below uses assumed inputs.

ขั้นตอนกระบวนการInput / calculationผลลัพธ์
1Tank (assumed): 2.0 m × 0.8 m1.6 m², ratio 0.4
2Against a wall at 100 fpm150 cfm/ft²
3150 cfm/ft² expressed per m² of tank surfaceAbout 2,740 m³/h per m²
4Airflow for the tank: 1.6 m² × about 2,740 m³/h per m²About 4,390 m³/h

Lids reduce the volume further: the EU reference document for surface treatment reports the cuts below, which shrink the scrubber and fan.

Lid typeCut in extracted volume
Lids moving with the flight bar60 to 75 percent
Automatic hinged lidsUp to 90 percent

How is the scrubber tower sized?

The tower diameter follows from the total airflow and the allowable gas velocity; the packed height follows from the removal efficiency the permit requires. The values below are typical published design rules, confirmed per project from the gas composition, the packing data and the required outlet concentration.

Design parameterTypical published valueแหล่งอ้างอิง
Extraction rateSum of hood airflows from the tank table aboveCalifornia Title 8, Section 5154
Gas velocity in the tower60 to 70 percent of the flooding velocity of the chosen packingUS EPA Air Pollution Control Cost Manual; Texas TCEQ guidance (no more than 70 percent)
Liquid-to-gas ratio1.2 to 1.5 times the minimum ratio from the equilibrium line; a minimum liquid rate is also needed to wet the packingUS EPA Air Pollution Control Cost Manual
Contact time / packed heightCalculated from the transfer units needed for the required efficiency; liquid redistributors every 8 to 20 ft (2.4 to 6.1 m) of random packing in tall bedsUS EPA Air Pollution Control Cost Manual
Pressure drop across the packing0.5 to 1.0 in. water column per foot of packing (about 410 to 820 Pa per metre)US EPA Air Pollution Control Cost Manual
Inlet gas temperature for absorption4 to 38 °C; lower temperature favours absorptionUS EPA fact sheet EPA-452/F-03-015
Dust loading at the inletBelow 0.45 g/m³ to avoid clogging the bedUS EPA fact sheet EPA-452/F-03-015

Which scrubbing liquor suits each contaminant?

Water absorbs the very soluble acids; caustic soda is used where a lower outlet value or a less soluble gas has to be reached. US EPA names caustic soda (NaOH) as the most common scrubbing liquid for acid gas, with sodium carbonate and slaked lime also in use.

สารปนเปื้อนScrubbing liquorWhat the published data show
Hydrogen chlorideWater, or dilute NaOH for low outlet valuesEU reference document: 30 to 10 mg/m³ generally reached with a water scrubber; below 10 mg/m³ only with much higher water use
Sulphuric acid mistWater or dilute NaOH, with an efficient mist eliminatorUS EPA AP-42: mist eliminators remove droplets mainly by inertial impaction on blades or a mesh pad
Hydrogen fluorideDilute NaOHEU reference document: an alkaline scrubber is usually necessary to reach 3 mg/m³ HF (German limit)
Nitrogen oxidesWater or alkali first stage; a reduction stage where NO must also be removedEU reference document: most NO2 is absorbed, leaving mainly NO, which is harder to remove; one aluminium brightening plant reports 60 to 70 mg/m³ NOx after scrubbing
Chromic acid mistWater, recirculatedUS EPA AP-42: chromic acid is highly soluble in water; chevron-blade and mesh-pad mist eliminators are washed down periodically
Cyanide and alkaline mistAlkaline liquor in a separate scrubberEU reference document: the lower end of the hydrogen cyanide range is achievable with alkali scrubbers

The liquor from a chromium scrubber or mist eliminator is kept with the other chromium effluents, where hexavalent chromium is reduced before precipitation; the EU reference document describes treating this wash liquor with the other chromium effluents. Acid and caustic liquor is bled to the neutralisation stage. The electroplating wastewater treatment system takes these streams, so scrubber and treatment plant are designed together with the electroplating line they serve.

What emission limits does the scrubber have to meet?

The local air permit sets the design outlet values. Three published references are shown as examples.

PollutantChina GB 21900-2008, Table 5 (mg/m³)EU reference document, Table 3.28: ranges reported by installations (mg/Nm³)
Hydrogen chloride30<0.3 to 30
Chromic acid mist / chromium0.05Cr(VI) <0.01 to 0.2; total Cr <0.1 to 0.2
Sulphuric acid mist30Not listed
Nitrogen oxides200<5 to 500
Hydrogen cyanide0.50.1 to 3.0
Fluoride / hydrogen fluoride7<0.1 to 2

GB 21900-2008 sets the dates from which the Table 5 limits apply, requires local collection and central treatment of process fumes and sets a minimum stack height.

GB 21900-2008 requirementค่า
Table 5 limits, new plantsFrom 1 August 2008
Table 5 limits, existing plantsFrom 1 July 2010
Stack heightAt least 15 m
Stack height where the exhaust contains hydrogen cyanide25 m
Height above buildings within 200 mAt least 5 m

In the United States, the chromium electroplating standard 40 CFR Part 63, Subpart N limits total chromium in the exhaust.

Tank (40 CFR 63.342)Total chromium limit, mg/dscm
Hard chromium plating, existing tank at a large facility0.011
Hard chromium plating, existing tank at a small facility0.015
Hard chromium plating, new or reconstructed tank0.006
Decorative chromium (chromic acid bath) and chromium anodizing, existing tank0.007
Decorative chromium (chromic acid bath) and chromium anodizing, new or reconstructed tank0.006

As an alternative, a tank using a fume suppressant with a wetting agent may comply by keeping the bath surface tension at or below the limits below.

สภาวะการทำงานขีดจำกัด
Surface tension, measured by stalagmometerAt or below 40 dynes/cm
Surface tension, measured by tensiometerAt or below 33 dynes/cm
PFOS-based fume suppressantsMay not be added after 21 September 2015

How is a scrubber operated and monitored?

It is run at the airflow, pressure drop and liquor strength set in the performance test, with daily readings and quarterly inspections.

สิ่งที่ต้องตรวจสอบทำไมจึงสำคัญPublished reference
Pressure drop across the packed bedA rise points to flooding, plugging or damaged packing40 CFR 63.343: packed-bed systems kept within ±1 inch water column of the tested value, recorded daily
Velocity pressure at the scrubber inletShows that hoods still draw the design airflow40 CFR 63.343: within ±10 percent of the tested value
Liquor pH or titrationA small fall in pH means a large loss of caustic strengthTexas TCEQ absorber guidance
Liquor circulation rateRemoval efficiency falls as the circulation rate dropsTexas TCEQ absorber guidance; a stand-by pump can be specified
Visual inspection of drainage, packing and mist eliminatorFinds chromic acid build-up, chemical attack and mist breakthrough40 CFR 63, Subpart N work practice table: quarterly

What does an acid fume scrubber cost?

Acid fume scrubbers are quoted per project. The figure follows from the total airflow, the number of hoods and duct length, the contaminants and outlet limits, the material and the stack. Lids or enclosures that cut the airflow also cut the size of tower and fan. MUSI Technology supplies acid fume scrubbers matched to plating, anodizing and pickling lines, supplied with the line.

ต้องส่งข้อมูลอะไรบ้างเพื่อขอใบเสนอราคา?

Send the tank list, bath chemistry, temperatures, layout, air permit limits and site conditions listed below. MUSI engineers reply within 24 hours; the configuration and quotation follow once the inputs are complete.

ข้อมูลนำเข้าสิ่งที่ข้อมูลนี้กำหนด
Tank list: process, length, width, liquid level and position against wallsHood type and extraction rate per tank
Bath chemistry and concentration (for example HCl, H2SO4, HNO3, HF, chromic acid, cyanide)Number of scrubbers, liquor and stages
Bath temperatures, agitation method, and any lids or enclosuresHazard class, airflow and material temperature check
Layout drawing with tank row, scrubber location and duct routeDuct sizes, fan pressure, footprint
Local air permit limits and required stack heightOutlet design values and stack
Site limits: power supply, water, outdoor temperature range, available heightFan motor, make-up water, freeze protection, tower height
Wastewater plant on site, or to be suppliedBlowdown routing and treatment

For a full plating plant, see equipment for electroplating plants. Other air and water treatment equipment is listed under environmental equipment; for paint overspray, which is a different duty, see the paint-booth wet scrubber. Send the tank list through the หน้าติดต่อ.

คำถามที่พบบ่อย

Can one scrubber serve every tank on a plating line?

Not always. Acid exhaust can share one scrubber, but cyanide and alkaline exhaust is kept on its own duct and scrubber so that acid never meets cyanide. Chromium tanks often have their own mist eliminator or scrubber so that the chromium-bearing liquor can be treated with the other chromium effluents.

Should the scrubber use water or caustic soda?

Water is enough for very soluble acids such as hydrogen chloride and chromic acid when the outlet limit allows it. Dilute caustic soda is used for lower outlet values and for hydrogen fluoride.

Does a fume suppressant replace the scrubber?

Sometimes, for chromium tanks only. Subpart N lets a chromium tank comply through the bath surface tension limit, and US EPA AP-42 notes that fume suppressants alone are effective, but many plants use them together with an add-on control device. Acid gases from pickling still need a scrubber.

Where does the scrubber liquor go?

It is bled to the wastewater treatment plant. Acid and caustic liquor goes to neutralisation; liquor from chromium scrubbers joins the chromium stream for reduction before precipitation; cyanide-bearing liquor goes to the cyanide treatment stage.

How much does an acid fume scrubber cost?

It is quoted per project, from the airflow, hoods, contaminants, outlet limits, materials and stack. MUSI engineers reply within 24 hours; the quotation follows once the tank list and permit limits are complete.

อ่านเพิ่มเติม

About the figures on this page. All figures are typical published values, not guarantees or design data for a MUSI scrubber. Emission mechanisms, control devices and materials for chromic acid mist are from US EPA AP-42 Section 12.20. Removal efficiency, temperature and dust-loading ranges are from US EPA fact sheet EPA-452/F-03-015; flooding fraction, liquid-to-gas factor, pressure drop and redistribution from the US EPA Air Pollution Control Cost Manual, Section 5, Chapter 1 (7th edition), with the 70 percent flooding rule also in Texas TCEQ absorber guidance (1995). Extraction velocities and airflows are from California Code of Regulations Title 8, Section 5154, converted to SI units (1 cfm/ft² is about 18.3 m³/h per m²). Scrubbing performance, emission ranges and lid savings are from the EU reference document on best available techniques for the surface treatment of metals and plastics (2006). Emission limits are from China GB 21900-2008 and US 40 CFR Part 63 Subpart N. Final values are set per project from the tank list, the bath chemistry and the local air permit.