Enclosed automatic gantry plating line with hoist, tank row and operator platform
ELECTROPLATING LINE

Electroplating Line

Rack plating lines, barrel plating lines and aluminium anodizing lines from MUSI Technology, Changzhou, China, with tanks, transport, rectifiers and controls engineered as one line. Each line is supplied with the matching wastewater treatment and acid-fume scrubbing, so the process and its discharge are designed together. MUSI Technology ซึ่งตั้งอยู่ที่เมืองฉางโจว ประเทศจีน ออกแบบและผลิตอุปกรณ์นี้เองภายในบริษัท และได้ส่งมอบสายการพ่นสีแล้ว 800+ สายไปยัง 36 ประเทศ พร้อมการติดตั้งหน้างานและการฝึกอบรมผู้ปฏิบัติงาน

Rack lines with gantry hoists for parts that must be held on fixtures.

Barrel lines for fasteners and other small parts that can tumble in bulk.

Anodizing lines for aluminium profiles and components.

Wastewater treatment and fume scrubbers matched to the bath chemistry and the local discharge limits.

Installation and operator training on site by MUSI engineers.

ขอใบเสนอราคา โทรหาเรา

คำตอบแบบรวบรัด: An electroplating line is a row of process tanks in which parts are cleaned, activated, coated with metal from an electrolyte under direct current, rinsed, passivated and dried. There are three main types: a rack line carries parts on fixtures with gantry hoists, a barrel line tumbles small parts in rotating perforated barrels, and an anodizing line grows an oxide layer on aluminium. The choice is decided by part size and shape, the specified coating and thickness, the output per hour and the local discharge limits.

Which electroplating line type fits your parts?

MUSI Technology supplies all three line types.

จุดเปรียบเทียบRack plating line (gantry / hoist)Barrel plating lineAnodizing line
ชิ้นงานทั่วไปBrackets, housings, tubes, die castingsFasteners, washers, clips, small stampingsAluminium profiles, sheet parts, housings
Part sizeMedium to large, or small parts that must not touchSmall parts that can tumble in bulkFrom small components to long profiles
วิธีการขึ้นชิ้นงานHung or clamped on racks carried on flight barsPoured into perforated rotating barrelsClamped on aluminium or titanium racks
Typical coatingsZinc, zinc-nickel, copper, nickel, chromium, tinZinc, zinc-nickel, copper, nickel, tinSulphuric acid anodizing (clear or coloured), hard anodizing, chromic acid anodizing
Main limitationRacking labour and fixture cost; rack contact marksNot for parts that nest, tangle, scratch or are heavyAluminium only; contact points stay uncoated

What stations does an electroplating line include?

The stations run in the order below; the last column shows where an anodizing line differs. Figures are typical values from US EPA AP-42.

สถานีสายการผลิตวัตถุประสงค์On an anodizing line
1. การโหลดParts are racked or filled into barrelsSame, on racks
2. Soak and electrolytic degreaseRemoves oil and shop soil with alkaline cleanerMild alkaline or acid cleaner
3. RinseStops cleaner being carried into the acid stageSame
4. Pickle / activateRemoves oxide and scale; acid dips typically hold 10 to 30 percent hydrochloric or sulphuric acidAlkaline etch, rinse, then desmut in acid
5. PlatingDeposits the metal under controlled current, time and temperatureAnodizing tank: the aluminium part is the anode
6. Drag-out and cascade rinsesRecover bath solution and save water by counter-current rinsingSame
7. Passivation / sealingConversion coating on zinc, with an optional sealerOptional colouring, then sealing; hot-water sealing typically at 88 to 99 °C for at least 15 minutes
8. Drying and unloadingHot-air dryer; centrifugal dryer for barrel loadsHot-air drying

A baking oven is added where the specification requires embrittlement-relief heat treatment of high-strength steel; ISO 2081 includes it in the coating designation.

What equipment is in the scope of supply?

Sizes, quantities and materials are fixed in the written specification for each project. Electrical components from international brands can be specified by the customer and are confirmed in the approved configuration.

อุปกรณ์Generic description
Process tanks and liningsPolypropylene, PVC, or steel with rubber or plastic lining, chosen by bath chemistry and temperature
Gantry hoists and flight barsMove racks or barrels between tanks to a programmed sequence
Plating barrels and drivesPerforated rotating barrels with internal contacts, sized to the part
Rectifiers and busbarsDirect current supply for each plating or anodizing tank
การทำความร้อนและความเย็นHeat exchangers or immersion heaters; chillers for baths that generate heat
Filtration and agitationFilter pumps, air or eductor agitation, cathode movement
Fume extraction hoodsLip or enclosure hoods and ducting on tanks that emit mist
PLC, HMI and recipe controlHoist travel, immersion time, current and temperature per recipe, with logging
Chemical dosingMetering pumps driven by pH, conductivity or ampere-hours
การบำบัดน้ำเสียSegregated collection, reaction tanks, clarifier, sludge dewatering
Fume scrubbersMist eliminators and packed-bed scrubbers in PVC or fibreglass

What typical process parameters does a line run at?

These are typical published ranges, not design values for a MUSI line. Final values are set per project from the part, the specified coating and the data sheet of the bath chemistry.

กระบวนการTypical operating rangeThickness class or noteแหล่งข้อมูล
Zinc, acid chloride bathRack 1.1 to 4.3 A/dm² at 3 to 9 V; barrel 0.3 to 1.1 A/dm² at 4 to 12 VASTM B633 service conditions SC 1 to SC 4: minimum 5, 8, 12 and 25 µmTrade handbook; ASTM B633
Zinc, alkaline non-cyanide bathRack 1.1 to 4.3 A/dm² at 3 to 9 V; barrel 0.5 to 1.1 A/dm² at 6 to 15 VISO 2081 designates the minimum local zinc thickness in µmTrade handbook; ISO 2081
Nickel5.4 to 6.0 A/dm²Cathode efficiency 93 to 97 percentEPA AP-42, 12.20
Copper, acid sulphate bath2.2 to 10.8 A/dm²Undercoat and decorative workEPA AP-42, 12.20
Tin, stannous sulphate bath0.1 to 2.7 A/dm²Cathode efficiency above 95 percentEPA AP-42, 12.20
Sulphuric acid anodizing15 percent sulphuric acid at 20 °C, about 1.3 A/dm²ISO 7599 classes AA 5 to AA 25: minimum average 5 to 25 µmAluminum Anodizers Council; ISO 7599
Hard anodizingSulphuric acid 15 to 20 percent by weight (165 to 220 g/L), chilled bath25 to 250 µm; the layer is normally not sealedAluminum Anodizers Council; EU reference document

How are wastewater and acid fumes handled?

Rinse water is drained separately by chemistry, because hexavalent chromium is not removed by hydroxide precipitation and cyanide interferes with it. Each stream is pre-treated, then joins the common metals stage. Control values are from US EPA documents; the limits are the US pretreatment standards for existing sources in 40 CFR 433.15, shown as an example. Your local permit sets the design values.

Vertical polypropylene wet scrubber tower with three inspection ports, recirculation pump and sump tank

Waste streamTreatment principleTypical control valueExample limit, mg/L (daily maximum / monthly average)
Hexavalent chromiumReduce to trivalent chromium with sulphur dioxide or bisulphite, then precipitate as hydroxideReduction at pH below 2.5; a typical system holds pH 1.8 to 2.0 and ORP 250 to 300 mVTotal chromium 2.77 / 1.71
CyanideTwo-stage alkaline chlorination to carbon dioxide and nitrogenStage 1: pH 9.5 to 10, ORP 350 to 400 mV; stage 2: pH 8.0, ORP 600 mVTotal cyanide 1.20 / 0.65
Acid and alkali rinses with zinc or copperNeutralise, precipitate metal hydroxides, settle and filterpH 8.5 to 9.5 (US EPA) or pH 9 to 11 (EU reference document); the optimum differs for each metalZinc 2.61 / 1.48; copper 3.38 / 2.07
Nickel and complexed metalsSegregate complexed streams; high-pH or sulphide precipitation, then settlingNickel: upper part of the hydroxide pH window; complexed streams: about pH 12 in high-pH precipitationNickel 3.98 / 2.38
Acid and chromic mistHooded extraction to a mist eliminator or packed-bed scrubberScrubbing water returned to wastewater treatmentSet by the local air permit

The equipment is described on the electroplating wastewater treatment system และ acid fume scrubber pages; the environmental equipment overview lists the other units. The electroplating wastewater guide covers each stream.

What does an electroplating line cost?

Indicative 2026 equipment budgets are USD 50,000–150,000 for a barrel plating line, USD 200,000–500,000 for a rack plating line with a gantry hoist and USD 250,000–600,000 for an aluminium anodising line. Wastewater treatment, fume scrubbing, freight and installation are quoted separately; the final price follows the agreed scope.

ประเภทสายการผลิตTypical scopeIndicative budget (USD, 2026)
Barrel plating line6 to 12 stations, manual or semi-automatic hoist on rail, 2 to 6 barrels50,000–150,000
Rack plating line12 to 20 stations, programmable gantry hoist, rectifier per plating tank200,000–500,000
Aluminium anodizing line12 to 20 stations, gantry hoist, high-current rectifier, chiller250,000–600,000
Wastewater treatment and acid-fume scrubberSized to rinse flow, pollutants and exhaust volumeQuoted separately

The ranges are equipment prices ex works China. Freight, installation and commissioning are quoted separately. The factors behind the figure are explained in the electroplating line cost guide.

ต้องส่งข้อมูลอะไรบ้างเพื่อขอใบเสนอราคา?

MUSI engineers reply within 24 hours. The configuration and quotation follow once the inputs below are complete.

ข้อมูลนำเข้าสิ่งที่ข้อมูลนี้กำหนด
Part drawings, maximum size and weight, photosTank dimensions, rack or barrel design, hoist capacity
Base metal and its conditionCleaning, pickling and activation sequence
Coating, thickness and standard (for example ISO 2081, ASTM B633, ISO 7599)Bath type, immersion time, rectifier size
Output per hour or per shift, and shifts per dayNumber of tanks and hoists, cycle time
Building length, width, clear height and floor loadingรูปแบบสายการผลิต
Utilities: power supply, water quality, steam or gasHeating method, water treatment, transformer load
Local wastewater and air discharge limitsWastewater and scrubber design

The warranty is 12 months as standard and up to 60 months by contract. การติดตั้ง and operator training overseas are carried out by MUSI engineers, and the delivery date is confirmed in the contract. For painted finishes see the เครื่องล้างก่อนการบำบัด และ aluminium profile page. Send part data through the หน้าติดต่อ.

คำถามที่พบบ่อย

How much does an electroplating line cost?

Indicative 2026 budgets are USD 50,000–150,000 for a barrel plating line, USD 200,000–500,000 for a rack plating line with a gantry hoist and USD 250,000–600,000 for an aluminium anodizing line, ex works China. Wastewater treatment, fume scrubbing, freight and installation are quoted separately.

Is electroplating the same as e-coat?

No. Electroplating deposits a metal layer such as zinc, nickel or chromium from a metal-salt bath, and anodizing grows an oxide layer on aluminium. E-coat deposits a paint film from a water-borne bath and cures it in an oven. For a paint primer, see the electrophoretic (e-coat) coating line.

Should I choose a rack line or a barrel line?

Choose by the part. Parts that can tumble without damage, such as fasteners and small stampings, go in barrels: loading is fast and needs no fixtures. Parts that are large, heavy or easily marked go on racks. The rack versus barrel guide goes through the decision.

Does a zinc plating line have to use hexavalent chromium passivation?

No. Trade literature reports that trivalent passivates are now used far more than hexavalent ones on zinc, in clear, iridescent, yellow and black finishes. Such a line has no hexavalent chromium stream from passivation to treat.

Why does chromium plating need stronger fume control than zinc or nickel plating?

Because of its low cathode efficiency. Per US EPA AP-42, only about 10 to 20 percent of the current in a hexavalent chromium bath deposits metal; the rest evolves hydrogen, and the bursting bubbles carry chromic acid mist off the bath. Chromium tanks are therefore hooded and exhausted through mist eliminators or packed-bed scrubbers, often with a fume suppressant in the bath.

How is the rectifier sized?

From the plated area in one load multiplied by the current density of the bath, plus a margin. As an arithmetic example with assumed inputs, a load with 240 dm² of surface plated at 2.5 A/dm² draws 600 A.

อ่านเพิ่มเติม

About the figures on this page. All process figures are typical values from public sources, not guarantees or design data for a MUSI line. Current densities, voltages and cathode efficiencies are from US EPA AP-42 Section 12.20 and a trade handbook article on zinc electroplating, converted to A/dm². Thickness classes are from ASTM B633, ISO 2081:2018 and ISO 7599:2018; anodizing conditions are from Aluminum Anodizers Council publications and the hard anodizing thickness range from the EU reference document for the surface treatment of metals and plastics (2006). Wastewater control values are from the US EPA Development Document for the Metal Finishing Point Source Category (1983) and the EPA pretreatment guidance manual (1984), with the pH 9 to 11 window from the EU reference document; example limits are from 40 CFR Part 433. Final values are set per project from the part, the specified coating and the local discharge limits.