Electroplating wastewater treatment plant with reaction tanks, mixers, chemical dosing tanks and control panel
ELECTROPLATING WASTEWATER TREATMENT

Electroplating Wastewater Treatment System

Wastewater treatment systems from MUSI Technology, Changzhou, China, for electroplating, anodizing and pretreatment lines. Collection, reaction, settling, sludge dewatering, polishing and rinse-water recycling are engineered as one system and matched to the baths on the line and to the local discharge limits. MUSI Technology, con sede en Changzhou, China, diseña y fabrica este equipo internamente y ha entregado 800+ líneas de recubrimiento en 36 países, con instalación en sitio y formación de operadores incluidas.

Segregated collection for chromium, cyanide, nickel and complexed, and acid-alkali rinse water.

Reaction tanks with mixers, pH and ORP control and metering pumps.

Inclined-plate settler, sludge thickener and filter press.

Sand and carbon filters, ion exchange or reverse osmosis for polishing and water reuse.

Supplied together with the plating line and the acid-fume scrubber.

Solicitar cotización Llámenos

Respuesta rápida: An electroplating wastewater treatment system is a set of tanks, reactors and separators that takes the rinse water and spent solutions from a plating, anodizing or pretreatment line and brings them within the discharge permit. It collects each stream separately, pre-treats chromium and cyanide in their own reaction tanks, precipitates the metals at a controlled pH, settles and dewaters the sludge in a clarifier and filter press, and can polish part of the water for reuse on the line. It is sized from the rinse-water flow, the pollutant load and the limits that apply at the plant.

What does an electroplating wastewater treatment system include?

It includes collection and equalization, chemical reaction, solids separation, sludge dewatering, polishing and control. MUSI Technology supplies the units below in the combination a line needs; quantities and sizes are fixed in the written specification for each project.

UnitFunción de la estaciónTypical construction
Collection and equalization tanksReceive each rinse stream through its own pipe and even out flow and concentration before treatmentPolypropylene (PP) or fibreglass-reinforced plastic (FRP) tanks with level switches and transfer pumps
Concentrate holding tanksStore spent baths and regenerant for slow, metered feed into the matching streamPP or FRP tanks in a bunded area
Chromium reduction reactorsReduce hexavalent chromium to trivalent chromium in acidPP, FRP or rubber-lined steel, with mixer, pH and ORP probes
Cyanide oxidation reactorsTwo-stage alkaline chlorination, one tank per stageFRP or PP, with mixer, pH and ORP probes and ventilation
Neutralization, precipitation and flocculation tanksAdjust pH so metals form hydroxides, then add flocculant to grow settleable flocsPP, FRP or lined steel, with mixers
Inclined-plate (lamella) settler or clarifierSeparates the flocs from the water; inclined plates enlarge the settling area within a small footprintPP or lined steel, with sludge hopper
Sludge thickenerConcentrates the settled sludge before dewateringConical-bottom PP or steel tank
Filter pressDewaters the sludge into a cake for disposalPlate-and-frame or membrane press with feed pump
Sand and activated carbon filtersRemove fine particles and organic residues after the settlerPressure vessels, FRP or lined steel
Ion exchange or reverse osmosis unitSelective metal polishing before discharge, or purification of rinse water for reuseResin columns or membrane skid with cartridge prefilter
Chemical dosing stationsAcid, alkali, reducing agent, oxidant, coagulant and flocculantDay tanks with metering pumps, controlled by pH and ORP
Control panelPLC and touch screen, interlocks, level and dosing control, logging of pH, ORP and flowPanel with instrument transmitters and alarms

Materials are chosen by stream chemistry and temperature. In the cost model of the US EPA development document for the metal finishing category, the chromium reduction tank is a rubber-lined tank, the cyanide reaction tanks are fibreglass, and the settling tank is steel or concrete.

Which wastewater streams must be kept separate?

Chromium, cyanide, nickel and complexed metals, and general acid-alkali rinse water are collected in separate pipes, because each needs its own first treatment step and mixing them makes treatment fail or become dangerous. The chemistry of each step is explained in the guide to electroplating wastewater treatment; the table shows what it means for the equipment.

StreamTypical origin on the lineEquipment for this streamWhere it goes next
ChromiumChromium plating, chromate passivation, chromic acid etching and anodizingEqualization tank, two reduction reactors in series, acid and reducing-agent dosingNeutralization and precipitation
CyanideCyanide zinc, copper and silver bathsEqualization tank, first- and second-stage oxidation reactors, alkali and oxidant dosingNeutralization and precipitation
Nickel and complexed metalsNickel plating, electroless nickel and copper, cleaners with strong complexing agentsSeparate reaction and settling line, or selective ion exchangeOwn sludge, or the common outlet after treatment
Acid-alkali rinse waterDegreasing, pickling, acid zinc, acid copper, anodizing rinsesEqualization tank, then neutralizationPrecipitation, settling and filtration
Concentrated baths and regenerantDumped baths, ion exchange eluate, scrubber blowdownHolding tank with metered feedThe matching stream above

Separation also matters for compliance in China. GB 21900-2008 sets total chromium, hexavalent chromium, nickel, cadmium, silver, lead and mercury at the outlet of the workshop or production facility, and copper, zinc, cyanide and the other parameters at the plant's final outlet. A chromium or nickel stream therefore has to meet its limit before it is mixed with other water.

How is the treatment system sized?

The system is sized from the rinse-water flow of each stream, the pollutant concentration in it and the time each reaction needs. The values below are the design assumptions published by the US EPA for metal finishing plants; final values are set per project from the bath list and the local permit.

UnitDesign basisPublished typical valueFuente de referencia
Chromium stream equalizationRetention time2 hoursUS EPA development document (1983), page VII-115
Chromium reduction, continuousRetention time; pH and ORP set points45 minutes in each of two tanks in series; pH 1.8 to 2.0 and ORP 250 to 300 mV with sulphur dioxideUS EPA development document, pages VII-115 to VII-116
Cyanide oxidation, continuousRetention time per stage; pH and ORP set pointsStage 1: 0.5 hours, pH 9.5 to 10, ORP 350 to 400 mV; stage 2: 1 hour, pH 8.0, ORP 600 mVUS EPA development document, pages VII-126 and VIII-17
Cyanide oxidation, batchRetention timeTwo tanks, each sized for 4 hoursUS EPA development document, page VIII-16
Flocculation (mix) tankRetention time and spare capacity45 minutes, plus 20 percent excess capacityUS EPA development document, pages VIII-4 and VIII-24
ClarifierSurface loading and retention time33.3 gal per hour per sq ft (about 1.36 m³/m² per hour), 4 hours retentionUS EPA development document, pages VIII-4, VIII-24 and VIII-25
Batch precipitation and settlingRetention timeTwo tanks, each sized for 8 hoursUS EPA development document, page VIII-25
Precipitation pHControl set pointpH 8.5 to 9.5 for mixed metal finishing waste (US EPA); pH 9 to 11, with a different optimum for each metal (EU reference document)US EPA development document, page VII-56; EU STM reference document, Section 4.16.7.1

Batch treatment suits small flows and changing bath lists; continuous treatment with automatic pH and ORP control suits steady production. A worked example with assumed flows shows how the published values become tank sizes.

Item (assumed inputs)CálculoResultado
Chromium rinse flow 1.5 m³/h: equalization tank1.5 m³/h x 2 h3.0 m³ working volume
Chromium reduction: two tanks in series1.5 m³/h x 0.75 hAbout 1.13 m³ each
Combined flow to precipitation 6 m³/h: flocculation tank6 m³/h x 0.75 h x 1.25.4 m³
Clarifier surface6 m³/h ÷ 1.36 m/h x 1.2About 5.3 m²
Check against GB 21900-2008 Table 2 reference water volume for single-layer plating (200 L/m²)6,000 L/h ÷ 200 L/m²30 m² of plated area per hour

The last line works in reverse for a plant in China: if the line plates less area than this per hour while discharging the same flow, measured concentrations are converted to the reference water volume before compliance is judged. Reducing rinse flow at the line is therefore part of the treatment design.

How much rinse water can be recycled?

Most of the rinse water can be returned to the line when counter-flow rinsing is combined with ion exchange or reverse osmosis, but organics, cyanide complexes and high dissolved solids limit what each technique can take. The EU reference document gives 3 to 20 litres per m² per rinse stage as the reference value for water discharged from a line that uses the best available techniques, and states that values towards the lower end can be reached by new and existing plants.

TechniqueEquiposPublished operating note
Counter-flow rinsing with drag-out recoveryMulti-stage rinse tanks on the line; first rinse returned to the bathReturning the first rinse to the process solution is listed as best available technique
Ion exchange recirculation of rinse waterPrefilter, cation and anion columns, regeneration stationA filter is placed before the exchanger; not usable with strong oxidants, high organic loads or metal cyanide complexes; may become impractical above 500 ppm dissolved solids. In a recirculated final rinse, make-up water is about 5 percent of the flow
Reverse osmosisCartridge prefilter, high-pressure membrane skidSeparates reusable permeate from a concentrate that returns to treatment
Sand and activated carbon polishingFine filter of about 5 µm, carbon bedRemoves residual particles and organics after precipitation, before selective resin polishing or reuse

The water quantities saved by each additional rinse stage are tabulated in the wastewater guide. On the electroplating line, MUSI lays out the rinse tanks and their drains so each one feeds the correct collection pipe.

How is the sludge handled?

Settled hydroxide sludge is thickened, dewatered in a filter press and sent to licensed disposal or metal recovery, because it is normally classed as hazardous waste. The table shows the steps and the published figures for each.

Paso del procesoEquiposPublished figure or note
ThickeningGravity thickener; clear water returns to the settlerDoubling the solids content in the thickener substantially reduces the cost of the dewatering equipment and of hauling (US EPA)
DewateringFilter pressAbove 15 bar, metal hydroxide sludge gives a cake of 15 to 35 percent solids; sludge from anodizing rarely exceeds 25 percent solids (EU reference document)
Cake handlingCake hopper or bagsBatch pressure-filter cake usually contains 60 to 80 percent water and looks dry and friable (EU reference document)
DisposalLicensed contractorThe sludge is usually considered hazardous waste (EU reference document)

Segregated nickel or copper sludge can be kept apart for metal recovery. A filter press is also used for sludge from paint lines; see the sistema de tratamiento de aguas residuales de pintura.

Which discharge limits does the system have to meet?

The limits in the plant's own permit decide the design. The table compares published limits from China and the United States for the main plating parameters; national and local rules can be stricter.

Parameter (mg/L)China GB 21900-2008 Table 2 (new plants; existing plants from 1 July 2010)China GB 21900-2008 Table 3 (special limits)US 40 CFR 433.15, daily maximum / monthly averageUS 40 CFR 413.14(c), daily maximum / 4-day average
Total chromium1.00.52.77 / 1.717.0 / 4.0
Hexavalent chromium0.20.1No figura por separadoNo figura por separado
Nickel0.50.13.98 / 2.384.1 / 2.6
Copper0.50.33.38 / 2.074.5 / 2.7
Zinc1.51.02.61 / 1.484.2 / 2.6
Cadmium0.050.010.69 / 0.261.2 / 0.7
Total cyanide0.30.21.20 / 0.651.9 / 1.0
pH6 to 96 to 9Not listedNot listed
Reference water volume, single-layer / multilayer plating (L/m²)200 / 500100 / 250No se utilizaNo se utiliza

The US figures are pretreatment standards for existing plants discharging to a public sewer; the table shows where each standard applies.

NormaWhere it applies
40 CFR 433.15Metal finishing plants other than job shops and independent printed circuit board manufacturers
40 CFR 413.14(c)Common-metals standard for existing electroplating plants under Part 413, which covers job shops and independent printed circuit board manufacturers, discharging 38,000 litres or more per day
GB 21900-2008 Table 3In areas and from dates set by the national environmental authority or the provincial government
EU reference documentReports achievable ranges instead of legal limits; they are quoted in the wastewater guide

How does the system connect to the plating line and the fume scrubber?

The treatment plant is designed from the same tank list as the line, so the drains, rinse stages and treatment streams match one to one. Scrubber water from the acid-fume scrubber is returned to the matching stream, chromium to chromium and cyanide to cyanide. Line types and coatings for each part family are compared on the electroplating and anodizing plants page, and other air and water treatment equipment is listed under environmental equipment.

¿Qué debe enviar para solicitar una cotización?

Send the bath list, rinse arrangement, plated area, bath dumps, discharge permit, reuse target, space and sludge route listed below. MUSI engineers reply within 24 hours; the configuration and quotation follow once the inputs are complete, and the system is quoted per project.

DatoQué determina
List of baths and chemistries on the line, with volumesWhich streams are segregated and which reactors are needed
Rinse arrangement: number of stages and flow per rinseFlow per stream, tank volumes, recycling potential
Plated area per hour or per shift, and shifts per dayDaily flow and load; check against reference water volumes
Frequency and volume of bath dumpsSize of concentrate holding tanks
Discharge permit or applicable standard, and discharge point (sewer or surface water)Treatment depth, polishing stage, monitoring
Water reuse targetIon exchange or reverse osmosis capacity
Available floor area and height, indoor or outdoorSettler type, layout
Sludge disposal routeThickener and filter press size, cake dryness

Send the data through the página de contacto.

Preguntas frecuentes

What equipment is in an electroplating wastewater treatment system?

Segregated collection and equalization tanks, chromium reduction and cyanide oxidation reactors, neutralization and flocculation tanks with mixers, pH and ORP controlled dosing, an inclined-plate settler or clarifier, a sludge thickener and filter press, sand and carbon filters, optional ion exchange or reverse osmosis, and a PLC control panel.

Can one tank treat all plating wastewater together?

No. Chromium must be reduced in acid and cyanide oxidised in alkali before the metals are precipitated, and cyanide meeting acid can release toxic gas. In China, GB 21900-2008 also sets chromium and nickel limits at the workshop outlet, before streams are mixed.

How long does each reaction take?

Published US EPA design values are 45 minutes in each of two chromium reduction tanks, 0.5 hours for the first cyanide stage and 1 hour for the second, 45 minutes for flocculation and 4 hours in a conventional clarifier. Final retention times are set per project.

How dry is the filter press cake?

According to the EU reference document, a filter press working above 15 bar gives a metal hydroxide cake of 15 to 35 percent solids; sludge from anodizing rarely exceeds 25 percent solids.

Can treated water be reused on the line?

Yes, after polishing. Ion exchange can return rinse water of near-demineralised quality if strong oxidants, high organic loads and metal cyanide complexes are kept out; it becomes impractical above about 500 ppm dissolved solids. Reverse osmosis is the alternative for higher salt loads.

Does MUSI supply the system with the plating line?

Yes. MUSI supplies electroplating wastewater treatment systems with plating, anodizing and pickling lines, matched to the baths on the line. The bath list, rinse flows and discharge limits are the starting point.

Lecturas adicionales

About the figures on this page. All figures are published reference values, not guarantees or design data for a MUSI system. Retention times, surface loading, pH and ORP set points, tank materials in the cost model and the note on sludge thickening are from the US EPA development document for the metal finishing category (1983); the clarifier loading is converted from 33.3 gal per hour per sq ft. The precipitation pH window, rinse-water reference value, ion exchange limits, 5 µm fine filtration, filter press cake solids and sludge water content are from the European Commission reference document on best available techniques for the surface treatment of metals and plastics (2006). Limits are quoted from China GB 21900-2008, Tables 2 and 3, and from 40 CFR 433.15 and 413.14 as published in the electronic Code of Federal Regulations. The sizing example uses assumed flows to show the calculation. Final values are set per project from the bath list, the rinse flows and the local discharge limits.