ROLLER CONVEYOR BLAST LINE
Roller Conveyor Shot Blast Line
Inline pass-through blast machine with roller conveyor — purpose-built for continuous descaling of steel plates, beams and structural sections.
Continuous production for steel plates, H-beams and structural shapes with high uptime.
Technical Specifications
The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.
| Conveyor width | 600-3,000 mm |
|---|---|
| Conveyor speed | 0.5-5 m/min variable |
| Number of blast wheels | 4-16 wheels |
| Workpiece thickness | 5-300 mm |
| Cleaning grade | Sa 2.5-3 (ISO 8501) |
| Throughput | 50-300 m²/h |
| Abrasive type | Steel shot S330-S660 / steel grit GL/GP |
Product Features
- Application-Specific Design — optimized for pass-through line for steel plates, structural beams, pipes and welded assemblies, avoiding mismatched capacity or wrong sizing.
- Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment.
- Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
- Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
- Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.
Application References
This product has performed excellently in MUSI's customer installations. Selected references include:
- Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
- UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
- Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate
More references in our Case Studies section.
Service & Warranty
- Solution Design — free CAD line layout, process flow, and equipment list
- Warranty — 12 months full machine, 36 months on critical components
- Installation & Commissioning — engineers travel to your site for installation through production launch
- Operator Training — 3-5 days of free training for operators and maintenance technicians
- Response Time — 24-hour phone response, 72-hour on-site arrival (international)
Frequently Asked Questions
QWhat is the standard delivery lead time?
Standard models ship within 45 days from contract signing and down payment. Custom projects 60-75 days. Specifics confirmed in contract.
QHow do I choose between gas and electric heating?
Where natural gas is reliably available at competitive cost, gas heating typically reduces operating costs by 35%-50% compared to electric heating for continuous operation. Electric heating's advantages: zero local emissions, easy maintenance, lower upfront cost. The choice depends on your local energy prices and emission requirements.
QCan I visit MUSI's factory to see this equipment?
Absolutely. International visitors are warmly welcome at our Changzhou factory. We can show in-process equipment and videos of running customer installations. Book at least 1 day in advance — we provide pickup and engineer-led tours.