EN
PRODUCTS

Products: Spray Coating Lines & Surface Finishing Equipment

Complete spray coating lines & environmental treatment equipment

PRODUCT CATEGORIES

Our Product Lines

Coverage from pretreatment, spraying, and curing to environmental treatment — 30+ standard models meeting diverse industry and capacity needs. All equipment is designed and built by MUSI Technology in Changzhou, China, and shipped as complete lines or single machines to 36 countries, with 800+ coating lines delivered to date.

Every configuration is supplied as a complete surface treatment line: pretreatment, dry-off, spraying, curing, conveying and air or water treatment engineered as one system rather than assembled from separate machines.

Automatic Spray Coating Lines

Automatic Spray Coating Lines

Overhead chain, floor belt, and robotic flexible spray coating lines for high-volume automotive parts, appliance, and hardware production. Capacity ranges from 8,000 to 30,000 pieces per shift.

5 models View Category
Powder Coating Systems

Powder Coating Systems

Powder coating has become the leading method for hardware, appliance, and aluminum profile industries — eco-friendly (virtually zero VOCs), excellent durability, superior mechanical properties. MUSI offers the full range from manual to fully automatic, single-color to multi-color quick-change systems.

5 models View Category
Liquid Spray Lines

Liquid Spray Lines

Liquid coatings (water-based, solvent-based, 2K paints) still dominate in automotive, furniture, and appliance exterior finishes. MUSI provides differentiated solutions tailored to each paint type's characteristics.

5 models View Category
Sandblasting & Shot Peening Systems

Sandblasting & Shot Peening Systems

High-efficiency surface preparation systems including wheel blast cabinets, hook-type shot blast machines, tumble belt blasters, and manual sandblasting cabinets. Removes oxide, rust, and contaminants for superior coating adhesion.

5 models View Category
Dust Collection Systems

Dust Collection Systems

Advanced dust and fume extraction with multi-stage filtration — pulse-jet baghouses, cartridge collectors, cyclones, wet scrubbers, and central extraction systems for safe, compliant workshops.

5 models View Category
VOCs & Environmental Equipment

VOCs & Environmental Equipment

With increasingly strict global air emission standards, VOCs treatment is now mandatory for coating facilities. MUSI provides complete environmental solutions covering exhaust collection, concentration, incineration, and compliant emission.

5 models View Category
TURNKEY LINES BY APPLICATION

Complete Lines Built for One Product Family

Where the finished part carries the specification — corrosion class, film tolerance, changeover time — the line is engineered around that product family rather than assembled from catalogue categories.

PROCESS FLOW

Typical Coating Process

MUSI provides complete line design — covering every step from workpiece loading to finished part packaging.

1

Pretreatment

Degreasing, derusting, phosphating, water rinse, drying

2

Spray Application

IR pre-heat → powder/liquid/UV spray

3

Curing

High-temp curing oven / UV curing

4

Cooling & Unload

Forced air cooling → automatic unloading

5

VOCs Treatment

Exhaust treatment → compliant discharge

SELECTION GUIDE

Equipment Selection Guide

Different paint types, workpieces, and capacity needs require different equipment configurations. Wrong choices lead to wasted investment or production bottlenecks.

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com

More questions from buyers

What is a surface treatment line?

A surface treatment line combines the preparation and finishing stages a workpiece needs. For coating projects the stages may include cleaning, derusting, pretreatment, drying, powder or liquid application, curing and exhaust treatment.

Related: powder coating line · spray coating line guide · coating line cost guide

Which surface treatment lines does MUSI supply?

MUSI supplies the equipment for every stage of a surface treatment line:

StageEquipment
Surface preparationShot blasting machines, sandblasting rooms, shot peening machines
PretreatmentSpray pretreatment washers
CoatingPowder coating systems, liquid paint spray lines, automatic coating lines
CuringCuring ovens
EnvironmentalDust collection systems, VOC treatment equipment

Related: powder coating systems · liquid paint spray lines · shot blasting and sandblasting equipment · regenerative thermal oxidizer (RTO) · cartridge dust collector · contact page

Can one supplier deliver blasting, coating and VOC treatment together?

Yes. As a supplier of custom industrial surface treatment machinery, MUSI delivers blasting, pretreatment, coating, curing and VOC treatment as one engineered line, so the interfaces between stages are designed together.

Related: coating line cost guide · import and installation guide · contact page

Typical Scenario Recommended Solution
Hardware mass coating (≥5,000 pcs/shift) Overhead chain auto powder line + RTO treatment
Furniture panel water-based coating Floor belt water-based line + activated carbon + wastewater
Auto bumpers / complex plastic parts Robotic flexible line + 2K mixing spray
Aluminum profile outdoor weathering Vertical powder system + bridge gas oven
Surface preparation before coating (rust/oxide removal) Sandblasting + powder coating
High-volume low-concentration VOCs Zeolite rotor concentrator + RTO combined

Get Custom Selection Advice

Need a custom coating line for your factory?

Tell us about your workpieces and capacity requirements. Our engineers reply within 24 hours; a tailored configuration and quotation follow once your part data is complete.

Request a Quote

Six equipment families, and what each one is rated for

MUSI supplies the whole finishing shop rather than single machines. Coating lines run 0.5–5 m/min and scale from 5,000 to 50,000 pieces per shift over 60–200 m of installed length. Powder booths change colour in 5–15 minutes against 30–60 minutes for a standard booth. Electrostatic liquid spray reaches at least 80% transfer efficiency. Blast machines reach cleaning grade Sa 2.5–3 to ISO 8501. Dust collectors cover 3,000–200,000 m³/h, and RTO units destroy at least 98% of VOCs with heat recovery of at least 95%.

TypeTypical usePublished figures
Automatic coating linesOverhead chain, floor belt, reciprocator, robotic, modularConveyor 0.5–5 m/min; 5,000–50,000 pieces per shift; line length 60–200 m; film uniformity to ±3 µm on robotic lines
Powder coatingBooths, recovery, curing ovens, vertical linesGuns 60–100 kV, 2–16 configurable; colour change 5–15 min; cyclone plus cartridge dual-stage recovery
Liquid sprayWater-based, solvent, airless, electrostatic, 2KTransfer efficiency ≥80% electrostatic, ≥70% water-based, ≥65% airless; airless to 350 bar; 2K mixing 1:1 to 100:1
Sandblasting & shot peeningRotary table, hook, tumble belt, roller conveyor, cabinetCleaning grade Sa 2.5–3 (ISO 8501); 50–300 m²/h; hook load 500–3,000 kg; abrasive recovery ≥98%
Dust collectionPulse-jet bag filters, cartridge collectors, cyclonesAir volume 3,000–200,000 m³/h; filter area 100–3,000 m²; PTFE and nanofiber media
VOC & environmentalRTO, activated carbon, catalytic oxidation, scrubbersRTO destroys ≥98% of VOCs at 760–820 °C with ≥95% heat recovery; carbon adsorption ≥90%

Figures are the published specification ranges for each type. Final values are fixed during layout design against your part mix and takt time.

Technical guides