EN
PROJECT CASES

Case Studies

Real projects, real results, around the globe

PROJECT CASES

Selected Global Projects

MUSI has delivered 800+ coating lines worldwide across 36 countries. Below are 48 representative projects covering diverse industries and applications.

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com

More questions from buyers

Can a coating line be customised to my parts?

Yes. Every MUSI coating line is designed around the parts, output and factory layout of each customer. The 48 case studies on this page show custom coating lines delivered to different industries.

Related: coating line manufacturer · coating line cost guide · contact page

Which countries has MUSI delivered coating equipment to?

MUSI Technology, a coating line manufacturer in Changzhou, China, supplies complete coating lines, spray booths and VOC treatment to plants outside China. Its published case studies cover projects in 23 countries: Vietnam, Indonesia, Thailand, Malaysia, the Philippines, India, Bangladesh, Pakistan, Saudi Arabia, the United Arab Emirates, Turkey, Egypt, South Africa, Kenya, Russia, Kazakhstan, Poland, Germany, Mexico, Brazil, Argentina, Chile and Australia.

Each export coating line is quoted with engineering design, shipping documents, installation supervision, commissioning and operator training. The lines in Vietnam and Mexico marked below were installed on site by MUSI engineers.

RegionCountryPublished projects
Southeast AsiaVietnamautomotive parts powder coating line (installed on site by MUSI engineers); truck parts coating line (installed on site by MUSI engineers); telescopic spray booth for structural steel
Southeast AsiaIndonesiaalloy wheel spray painting line; aluminium profile powder coating line; plastic parts spray painting line; kitchen appliance coating upgrade; RTO VOC treatment system; telescopic spray booth with RCO
Southeast AsiaThailandEV battery pack housing coating line; two telescopic spray booths sharing one RCO
Southeast AsiaMalaysiafurniture VOC treatment project; telescopic spray booth for process skids
Southeast AsiaPhilippinestelescopic spray booth for shipyard hull blocks
South AsiaIndiahardware robotic coating line; 1,320 mm panel spray coating line; 20 m telescopic spray booth for bridge girders
South AsiaBangladeshelectrical products spray coating line
South AsiaPakistanmetal tube automatic coating line
Middle EastSaudi Arabiaoutdoor fitness equipment coating upgrade; telescopic spray booth for tanks and pipe spools
Middle EastUnited Arab Emiratesvertical powder coating line for aluminium profiles
Middle EastTurkeywheel hub powder coating line
AfricaEgyptlighting hardware powder coating line
AfricaSouth Africapower tool housing coating line; robotic electrostatic spray line for cooler boxes
AfricaKenyacomplete spray coating line
Europe and Central AsiaRussiaconstruction equipment coating workshop
Europe and Central AsiaKazakhstanframe and cargo body coating line; telescopic spray booth with RCO for mining equipment
Europe and Central AsiaPolandoffice furniture water-based coating line
Europe and Central AsiaGermanysheet metal cabinet drying oven
AmericasMexicoappliance powder coating line (installed on site by MUSI engineers); vehicle body painting line (installed on site by MUSI engineers); telescopic spray booth for crane girders
AmericasBrazilautomotive interior UV curing line
AmericasArgentinaautomotive bumper robotic coating line
AmericasChilecomplete coating workshop, EPC project
OceaniaAustraliadoor and window profile coating line; telescopic spray booth for trailer chassis

What a factory prepares before installation is listed on the installation and commissioning page.

Automotive Parts Coating Line for Tier-1 Supplier
2024 Vietnam

Automotive Parts Coating Line for Tier-1 Supplier

Overhead ChainFully AutomaticPowder Coating
Premium Powder Coating System for Appliance OEM
2024 Mexico

Premium Powder Coating System for Appliance OEM

Floor BeltPowder CoatingSalt Spray Tested
Hardware Robotic Flexible Coating Line
2024 India

Hardware Robotic Flexible Coating Line

RoboticFlexible ProductionMulti-Variety
Vertical Powder Coating for Aluminum Profiles
2023 United Arab Emirates

Vertical Powder Coating for Aluminum Profiles

Vertical BoothOutdoor WeatherableArchitectural
Construction Equipment Coating Workshop
2023 Russia

Construction Equipment Coating Workshop

Heavy PartsHeavy-Duty Anti-CorrosionSalt Spray 2000h
EV Battery Pack Housing Coating Line
2024 Thailand

EV Battery Pack Housing Coating Line

EVRoboticBattery Housing
Office Furniture Water-Based Coating Line
2023 Poland

Office Furniture Water-Based Coating Line

Water-BasedVOCs ReductionEU Market
Automotive Interior UV Curing Line
2024 Brazil

Automotive Interior UV Curing Line

UV CuringAuto InteriorHigh Efficiency
Outdoor Fitness Equipment Coating Upgrade
2023 Saudi Arabia

Outdoor Fitness Equipment Coating Upgrade

Outdoor WeatherablePowder CoatingRetrofit
Lighting Hardware Powder Coating Line
2023 Egypt

Lighting Hardware Powder Coating Line

LightingPowder CoatingSME-Sized
Kitchen Appliance Eco-Coating Upgrade
2024 Indonesia

Kitchen Appliance Eco-Coating Upgrade

Eco-UpgradeRTOKitchen Appliance
Automotive Bumper Robotic Coating
2024 Argentina

Automotive Bumper Robotic Coating

AutoRoboticBumpers
Sheet Metal Cabinet Drying Oven
2023 Germany

Sheet Metal Cabinet Drying Oven

Drying OvenSheet MetalElectrical Cabinet
Door & Window Profile Continuous Coating
2023 Australia

Door & Window Profile Continuous Coating

Door & WindowAluminum ProfilesHigh Efficiency
Automotive Wheel Hub Powder Coating Line
2024 Turkey

Automotive Wheel Hub Powder Coating Line

AutoWheel HubsPowder Coating
Power Tool Housing Coating Solution
2024 South Africa

Power Tool Housing Coating Solution

Power ToolsPlastic PartsHigh-Speed
Furniture Industry VOCs Treatment Project
2024 Malaysia

Furniture Industry VOCs Treatment Project

VOCs TreatmentEco-UpgradeActivated Carbon
Complete Coating Workshop EPC Project
2023 Chile

Complete Coating Workshop EPC Project

Workshop RetrofitComplete LineEPC
Metal Tube Automatic Coating Line
2023 Pakistan

Metal Tube Automatic Coating Line

TubingContinuous CoatingPowder
RTO VOCs Treatment System Delivery
2024 Indonesia

RTO VOCs Treatment System Delivery

RTOAutoVOCs Treatment
Overhead conveyor carrying machinery parts through a coating line
2026 China

Forklift Frame & Mast Coating Line, Hefei

ForkliftsStructural PartsCoating Line
Coating line for small stamped metal parts
2026 China

Seat Recliner & Slide Rail Coating Line, Jiangsu

Seat ComponentsSmall PartsHigh Volume
Coating line for metal and electromechanical parts
2026 China

Automotive Parts Coating Line, Chuzhou

Automotive PartsMetal PartsCoating Line
Workpieces on a chain conveyor in a coating line
2026 China

Automotive Parts Coating Line, Zhejiang

Automotive PartsConveyor LineCoating Line
Yellow overhead conveyor tracks on rows of white support columns across a coating workshop
2026 China

Machinery & Agricultural Parts Coating Line, Jiangsu

Construction MachineryAgricultural EquipmentCoating Line
Floor chain conveyor track in a coating line
2026 China

Hydraulic Cylinder Coating Line, Shandong

Hydraulic CylindersLong WorkpiecesCoating Line
Steel access platform and ladders on a coating line
2026 China

Tower Crane Mast Section Coating Line, Zhangjiagang

Tower CranesLarge Welded StructuresCoating Line
Spray coating line for sheet-metal parts
2026 China

Operator Cab Coating Line, Guangxi

Operator CabsSheet MetalCoating Line
Container spray booth with grating floor and pit
2026 China

Container Spray Painting Line, Tianjin

Container PlantContainer PaintingLiquid Spray
Entrance of a container spray booth in a large production hall
2026 China

Container & Energy-Storage Box Painting Line, Taicang

Container PlantContainer PaintingEnergy Storage
Inside a container spray booth
2026 China

Container Spray Painting Line, Qingdao

Container PlantContainer PaintingRail Transfer
Container shot blasting room with abrasive hopper
2026 China

Container Shot Blasting Line, Yangzhou

Container PlantShot BlastingAbrasive Recovery
Energy-storage box on a coating line
2026 China

Energy-Storage Box Painting Line, Zhangjiagang

Energy StorageBox PaintingRain Test
Floor rail conveyor crossing and transfer area in a spray painting line
2026 Indonesia

Alloy Wheel Spray Painting Line, Indonesia

Alloy WheelsFloor Rail ConveyorWater-Curtain Booths
Powder booth with automatic reciprocator and cyclone recovery
2026 Indonesia

Aluminium Profile Powder Coating Line, Indonesia

Aluminium ProfilesElectrostatic PowderComplete Line
Interior of an energy storage cabinet showing coated multi-tier steel battery racks
2026 China

Energy-Storage Cabinet Spray Coating Line, Jiangsu

Energy StorageOutdoor CabinetsSpray Coating
Spray painting line with booth and conveyor
2026 Mexico

Vehicle Body Painting Line, Mexico

Vehicle AssemblyBody PaintingMexico
Overhead conveyor on a steel structure platform
2026 Kazakhstan

Frame & Cargo Body Coating Line, Kazakhstan

Vehicle AssemblyFrames & ChassisKazakhstan
Overhead conveyor entering a spray booth
2026 Vietnam

Truck Parts Coating Line, Vietnam

Vehicle AssemblyTruck PartsVietnam
Paint booths on an energy-storage container coating line
2026 China

Energy-Storage Enclosure Painting Line for a Global Battery Maker

Battery MakerEnergy StorageEnclosure Painting
Energy-storage box in a coating line
2026 China

Energy-Storage Box Painting Line, Jiangyin

Energy StorageBox PaintingSpray Line
Semi-finished box on a container coating line
2026 China

Energy-Storage Box Painting Line, East China

Energy StorageBox PaintingSpray Line
Paint booth with high-speed roller door and transfer cart
2026 China

Energy-Storage Cabinet & Container Painting Line, Jiangyin

Energy StorageBox PaintingSpray Line
Booth corridor on a container coating line
2026 China

Energy-Storage Box Painting Line, Jiangsu

Energy StorageBox PaintingSpray Line
Stainless steel powder booth and powder gun unit
2026 Bangladesh

Electrical Products Spray Coating Line, Bangladesh

Electrical ProductsAutomatic SprayingExport
Box-type spray booth
2026 Indonesia

Plastic Parts Spray Painting Line, Indonesia

Plastic PartsSpray PaintingExport
Automatic spray painting line
2026 India

1,320 mm Panel Spray Coating Line, India

PanelsFurnitureExport
Coating line equipment
2026 Kenya

Spray Coating Line, Kenya

East AfricaSpray CoatingExport
Telescopic mobile spray booth fully extended over long steel beams inside a fabrication workshop, with lighting rows and white fabric walls
2025Vietnam

Telescopic Spray Booth for a Structural Steel Fabricator, Vietnam

Structural SteelTelescopic BoothDry Filter
Telescopic spray booth with orange folding frames retracted beside a pressure vessel workshop, exhaust duct on the roof
2025Indonesia

Oil-Film Telescopic Spray Booth with RCO for a Pressure Vessel Builder, Indonesia

Pressure VesselsTelescopic BoothOil-Film + RCO
Interior of a telescopic spray booth with dry paint-mist filter wall, ceiling lighting and yellow rail-mounted columns
2024Thailand

Two Telescopic Spray Booths Sharing One RCO at an Attachment Plant, Thailand

Construction MachineryTelescopic BoothShared RCO
Long telescopic spray booth with blue flame-retardant PVC fabric and orange folding frames in a heavy fabrication hall with overhead cranes
2024Malaysia

Oil-Film Telescopic Spray Booth for a Process Skid Fabricator, Malaysia

Process SkidsTelescopic BoothOil-Film
Telescopic spray booth on ground rails outside a workshop under a gantry crane, with steel structures laid out for painting
2024India

20 m Telescopic Spray Booth for a Bridge Girder Fabricator, India

Bridge GirdersTelescopic BoothDry Filter
Interior of a large telescopic spray booth with corrugated dry filter wall, rows of ceiling lights and an operator preparing steel profiles
2023Philippines

Telescopic Spray Booth for Hull Block Painting at a Shipyard, Philippines

ShipbuildingTelescopic BoothDry Filter
Telescopic spray booth with orange folding frames retracted in a machinery workshop, operators working beside the rail
2023Kazakhstan

Oil-Film Telescopic Spray Booth with RCO for a Mining Equipment Rebuild Shop, Kazakhstan

Mining EquipmentTelescopic BoothOil-Film + RCO
Operators spray-painting steel panels in front of a corrugated dry filter wall inside a spray booth
2025Mexico

Telescopic Spray Booth for Crane Girder Painting, Mexico

Crane ManufacturingTelescopic BoothDry Filter
Front view of a telescopic spray booth showing the dry paint-mist filter cabinet, folded fabric roof and orange folding frames
2024Saudi Arabia

Oil-Film Telescopic Spray Booth for a Tank and Pipe Spool Fabricator, Saudi Arabia

Storage TanksTelescopic BoothOil-Film
Telescopic spray booth interior with vertical dry paint-mist filter wall, folded fabric side walls and floor rails
2025Australia

Telescopic Spray Booth for Trailer Chassis Painting, Australia

TrailersTelescopic BoothDry Filter
Proposal illustration of a robotic electrostatic spray line painting blue ABS cooler boxes
2026South Africa

Robotic Electrostatic Spray Line for ABS Cooler Boxes, South Africa

Cooler BoxesRobotic PaintingABS Plastic

Need a custom coating line for your factory?

Tell us about your workpieces and capacity requirements. Our engineers reply within 24 hours; a tailored configuration and quotation follow once your part data is complete.

Request a Quote