From pre-sales consulting to equipment retirement — MUSI services cover the entire lifecycle of your coating line
12-month full-machine warranty, 36-month critical-component warranty. 24-hour phone response, 72-hour on-site arrival. Lifetime free technical consultation. Structural parts are covered for up to 60 months.
Learn more30+ engineering team provides full-spectrum technical support: process optimization, parameter tuning, fault diagnosis, line upgrades.
Learn moreExperienced engineers travel to your site for installation and commissioning — ensuring successful first-time production launch.
Learn more3-5 days of complimentary training for your operators and maintenance technicians — ensuring your team is fully equipped to run the line.
Learn moreCommon questions on equipment selection, operation, maintenance, and environmental compliance — answers from our experts.
View FAQProduct brochures, technical specifications, operating manuals, and case study collections for your reference.
Browse downloadsFor many years, MUSI has built our service reputation around one principle — accountability to our customers
Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.
Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.
Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.
Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.
12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.
Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.