Shipping Container Coating Line Overview

Production-rate marine coating for dry boxes and refrigerated cabinets — three-coat C5 systems applied in cell layout with forced curing, at one to four boxes per day. MUSI Technology builds shipping container coating lines in Changzhou, China, as complete turnkey lines with line-wide MES monitoring of temperature, humidity, pressure and flow at each station.

Built for 20 ft and 40 ft dry containers, refrigerated cabinets and insulated panel assemblies in continuous production.

Container manufacturers, reefer cabinet builders and modular enclosure fabricators supplying marine and coastal service, where a full repaint in service is contractually excluded.

Industry: Shipping Containers & Refrigerated Cabinets

Line Configuration

  • Blast room or roller conveyor blast line with media recovery
  • Primer booth with stripe-coat access platforms at roof height
  • Intermediate and topcoat booths, or a combined spray-and-bake cell
  • Forced-cure zone at 60-80 C to compress between-coat waiting
  • Rails and transfer cars sized to a loaded 40 ft box
  • Solvent exhaust treatment sized to three-coat load

MUSI engineers can run process simulations and ROI calculations based on your specifics. Contact us for a free proposal.