MUSI Technology Company Overview
MUSI Technology (Changzhou MUSI Environmental Technology Co., Ltd.) is a manufacturer of turnkey spray coating lines based in Changzhou, Jiangsu, China. The company has a single focus: complete coating lines — pretreatment, booths, ovens, conveying and exhaust treatment — designed, built, installed and commissioned for manufacturers at home and abroad.
What the company delivers
- Delivered — 800+ coating lines to 500+ clients across 36 countries.
- Scope — design, manufacturing, installation, commissioning and after-sales support from one company.
- Components — international brands such as Siemens, ABB and SEW, selectable to your specification.
- Lead time — standard configurations ship in 30–60 days.
- Warranty — 12 months on the complete line, 36 months on critical components, up to 60 months on structural parts.
The 800+ coating lines, 500+ clients and 36 countries are the cumulative record of the MUSI engineering team since it was formed in 2011; the 2,890 employees are the headcount of MUSI Technology as of 2026.
What to send for a quotation
Looking for a spray booth or coating line supplier? Send your part size, output and coating type and we reply with a matching configuration and budget range.
What to send for a quotation: part drawings or photos, the largest part size and weight, the material, the required output per shift and cycle time, the coating type (powder, liquid, UV or 2K) and the number of colours, and the available floor space, ceiling height, power or gas supply and local emission requirements.
Tell us about your workpieces and capacity requirements. Our engineers reply within 24 hours; a tailored configuration and quotation follow once your part data is complete.
This page is a short company overview and supplier-assessment guide. Full company profile: About MUSI Technology
How to assess a coating line supplier
The best way to judge any line supplier is by lines already running. Ask to see a line coating parts like yours, ask exactly which conveyor, guns and controls it uses, and ask who will be on site during commissioning. The case studies are the place to start, and the company page sets out the capability in more detail.
QQuestions buyers ask before ordering
quotation · price · lead time · installation · warranty
What information do you need to prepare a quotation?
Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.
How much does this equipment cost?
Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.
What is the lead time?
Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.
Do you install and train operators overseas?
Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.
What warranty and after-sales support are included?
12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.
Can the environmental equipment be supplied with the line?
Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.