Download Center

MUSI provides product brochures, technical specifications, application cases, and operation manuals for your reference. All documents are kept current and updated periodically.

Note: Product brochures, technical data sheets and application case studies are open to download. Operation manuals and other customer-specific documents require a customer code. To request access, or for documents not listed, contact us.

Product Brochures

MUSI Company Brochure (English)
PDF · 105 KB
Download
MUSI Company Brochure (Spanish)
PDF · 102 KB
Download
Automatic Spray Lines Brochure
PDF · 84 KB
Download
Powder Coating Equipment Brochure
PDF · 93 KB
Download
Liquid Spray Equipment Brochure
PDF · 94 KB
Download
Sandblasting & Shot Peening Systems Equipment Brochure
PDF · 88 KB
Download
Dust Collection Systems Brochure
PDF · 86 KB
Download
VOCs Treatment Brochure
PDF · 85 KB
Download

Technical Specifications

Overhead Chain Auto Spray Line — TDS
PDF · 76 KB
Download
Robotic Flexible Coating Line — TDS
PDF · 79 KB
Download
Vertical Powder Coating System — TDS
PDF · 76 KB
Download
RTO Regenerative Thermal Oxidizer — TDS
PDF · 77 KB
Download
Zeolite Rotor Concentrator — TDS
PDF · 76 KB
Download
Water-Based Paint Spray Line — TDS
PDF · 76 KB
Download

Application Case Studies

Automotive Parts Coating Cases
PDF · 134 KB
Download
Home Appliance Coating Cases
PDF · 86 KB
Download
Metal Hardware Coating Cases
PDF · 95 KB
Download
Furniture Coating Cases
PDF · 85 KB
Download
Heavy Machinery Coating Cases
PDF · 108 KB
Download
Aluminum Profile Coating Cases
PDF · 86 KB
Download

Operation Manuals (Customers Only)

MUSI PLC Control System Manual
PDF · 5.3 MB
Download
HMI Touchscreen User Guide
PDF · 4.2 MB
Download
Dust Collection Systems Daily Maintenance
PDF · 2.8 MB
Download
RTO Equipment O&M Manual
PDF · 3.6 MB
Download
Environmental CEMS Setup Guide
PDF · 2.4 MB
Download

Industry White Papers

2024 Global Coating Equipment Industry Report
PDF · 71 KB
Download
VOCs Treatment Technology & Solution Guide
PDF · 86 KB
Download
Powder Coating Energy Retrofit Guide
PDF · 85 KB
Download
Coating Line Construction Guide
PDF · 114 KB
Download

Download Notes

  • All documents are PDF format — requires Adobe Reader or compatible
  • Files are large — Wi-Fi recommended
  • If a download link fails, contact your sales representative for resending
  • All documents are MUSI's intellectual property — for reference only, not for commercial redistribution
  • For latest quotations or customized documents, please contact us
?

Document questions

Which shipping and customs documents does the supplier provide?

The commercial invoice and packing list are issued for each shipment under the trade terms in the contract; any other document your importer or customs broker needs at destination should be confirmed with them before shipment. Keep equipment names and quantities consistent across the contract, invoice and packing list, ideally with one equipment numbering. See the import and installation guide.

Which technical documents should we review before comparing proposals?

The process flow, layout, scope of supply by system, key parameters and their basis (oven length and temperature, booth airflow, conveyor speed), utility consumption, interfaces, controls and the acceptance method. The brochures and technical data sheets on this page give standard specifications; project documents are prepared for your parts and become more detailed after the contract.

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com