EN
NEWS CENTER

News & Insights

Stay informed with the latest from MUSI and the coating industry

Common Powder Coating Defects and Solutions
Tech Insights 2026-05-02

Common Powder Coating Defects and Solutions

MUSI's engineering team summarizes systematic analyses and solutions for the most common powder coating defects: pinholes, orange peel, sagging, miss-spots, and color variation.

Read more
Global VOCs Regulations Tighten — Impact on Coating Industry
Industry News 2026-05-02

Global VOCs Regulations Tighten — Impact on Coating Industry

Recent VOCs regulations in major manufacturing markets are raising the bar for coating facilities globally. We analyze the trends and what manufacturers should prepare for.

Read more
New Generation Energy-Saving Powder Coating Line Released
Company News 2026-05-02

New Generation Energy-Saving Powder Coating Line Released

After a year of intensive R&D, our 3rd-generation powder coating system reduces energy consumption by 23% compared to the previous model — saving customers $20,000-$40,000 USD annually.

Read more
Powder Coating in the EV Industry: Growth and Outlook
Industry News 2026-05-02

Powder Coating in the EV Industry: Growth and Outlook

As the global EV industry grows rapidly, powder coating is gaining significant share in EV component coating with its eco-friendly, cost-effective, and high-performance advantages.

Read more
How to Choose the Right Coating Line for Your Factory
Tech Insights 2026-05-02

How to Choose the Right Coating Line for Your Factory

Building a new coating line is a major decision. We provide a systematic selection guide covering workpiece analysis, capacity planning, facility conditions, and budget assessment.

Read more
Water-Based Paint Adoption: Status and Challenges
Industry News 2026-05-02

Water-Based Paint Adoption: Status and Challenges

Water-based paint replacing solvent-based is the inevitable green direction for coatings — but real-world adoption faces multiple challenges. We summarize the situation systematically.

Read more
Daily Maintenance Guide for Coating Lines
Tech Insights 2026-05-02

Daily Maintenance Guide for Coating Lines

A coating line's stable operation depends 70% on daily maintenance. We provide a systematic maintenance checklist from daily checks to annual overhauls.

Read more
Robotic Spray Painting in the Automotive Industry: A Practical Guide
Industry News 2026-05-02

Robotic Spray Painting in the Automotive Industry: A Practical Guide

As automotive manufacturers raise the bar on coating precision and consistency, industrial robots are becoming the standard. We share insights from 50+ deployment projects.

Read more
5 Practical Tips for Coating Line Energy Savings
Tech Insights 2026-05-02

5 Practical Tips for Coating Line Energy Savings

Coating lines are major energy consumers. Smart energy retrofits can dramatically reduce operating costs without affecting production.

Read more
Powder vs Liquid Coating: A Selection Guide
Industry News 2026-05-02

Powder vs Liquid Coating: A Selection Guide

Powder coating and liquid coating each have their place — we compare them across process, performance, cost, and environmental dimensions to help you choose.

Read more
Sandblasting & Shot Peening Systems Technology in Industrial Coating Applications
Tech Insights 2026-05-02

Sandblasting & Shot Peening Systems Technology in Industrial Coating Applications

sandblasting technology, with its rapid curing, energy efficiency, and eco-friendly characteristics, is finding ever wider applications in industrial coating.

Read more

Need a custom coating line for your factory?

Tell us about your workpieces and capacity requirements. Our engineers reply within 24 hours; a tailored configuration and quotation follow once your part data is complete.

Request a Quote

Technical guides