Professional Site Installation Team
Equipment manufacturing is only half of project success. Professional on-site installation is equally critical. MUSI maintains 5 specialized installation teams, each with 6-8 engineers — 35+ installation specialists capable of supporting 8-10 concurrent projects worldwide.
Team members average 8+ years of field experience, covering electrical, mechanical, automation, HVAC, and environmental disciplines — fully capable of independently completing all installation and commissioning work for coating lines.
Standard Installation Process
Unboxing & Inspection
Equipment counting + visual check
Positioning
Main equipment placed + leveled
Utilities
Electrical / water / air / gas hookup
Single-Unit Test
Each device function verified
Line Production
Full-line trial run + acceptance
Typical Installation Timeline
| Line Size | Typical Duration | Engineers Deployed |
|---|---|---|
| Small (<50 m) | 10-15 days | 3-4 engineers |
| Medium (50-100 m) | 15-25 days | 5-6 engineers |
| Large (100-200 m) | 25-40 days | 6-8 engineers |
| Extra-Large (>200 m) | 40-60 days | 8-12 engineers |
| Workshop EPC project | 60-120 days | 15-30 engineers |
Customer Preparation
To ensure smooth installation, customers should complete the following before MUSI engineers arrive:
- Site readiness: foundation poured, area cleared, dust/rain protection in place
- Utilities ready: electrical, water, compressed air, gas connections available
- Lifting equipment: forklift, overhead crane, mobile crane per MUSI's specifications
- Local labor: customer arranges 3-5 local workers (electrician, welder, general) to assist MUSI engineers
- Accommodation: hotel arrangement for MUSI team (MUSI covers all related costs)
- Project liaison: customer designates 1-2 dedicated coordinators
Acceptance Criteria
MUSI and customer jointly establish detailed acceptance criteria across three levels:
- Equipment acceptance — each unit's appearance, function, and parameters meet contract specs
- Line acceptance — 72 hours of continuous operation without faults; key process parameters stable
- Capacity acceptance — under customer's actual workpiece, 8 hours of continuous production meeting cycle and quality targets
Once all three pass, customer signs off and warranty period begins.
Site Safety
MUSI maintains a complete construction safety system (ISO 45001 certified):
- Pre-installation safety briefing for all personnel
- All workers hold relevant certifications (electrical, welding, height work)
- Complete PPE provided (helmet, harness, gloves, goggles)
- Site safety officer with daily safety patrols
- many years with no major site safety incidents