Industry Overview

Professional coating solutions for construction equipment, agricultural machinery, machine tools, and heavy equipment — workpieces up to 12 m long, 6 m wide.

Heavy Machinery Coating

Typical Workpieces

MUSI has served the Heavy Machinery industry with workpieces including:

  • Excavator chassis
  • Loader booms
  • Tractor housings
  • Machine tool beds
  • Pressure vessels
  • Steel structures
  • Mining equipment
  • Port machinery

Industry Coating Challenges

Each industry faces unique coating challenges. MUSI's solutions are designed to address these pain points directly:

Oversized & Heavy

Heavy equipment can weigh several tons and span over 10 meters — beyond standard line capacity.

Heavy Oil & Rust

Raw steel structures often have cutting oil, anti-rust oil, and oxide layers — strict pretreatment is essential.

Outdoor Durability

Outdoor-use equipment must resist UV, salt spray, acid rain — coating life targets 10+ years.

Small Batches, Many Variants

Typically single-piece or small-batch custom production — difficult to use flow lines, mostly spray booth + drying booth.

MUSI's Targeted Solutions

To address these challenges, MUSI provides industry-specific coating solutions:

1. Large Auto Spray Booths

Standard spray booth 12×6×5 m, with drive-through doors for forklift access. Air supply 60,000-100,000 m³/h with three-stage filtration.

2. Heavy-Duty Pretreatment

High-pressure spray degreasing + shot blast derusting + multi-stage phosphate or silane treatment for excellent coating adhesion.

3. Heavy-Duty Anti-Corrosion Coating

Three-layer system: epoxy primer + epoxy intermediate + polyurethane topcoat — passes 2,000+ hour salt spray, 15+ year outdoor life.

4. Multi-Fuel Curing Ovens

Natural gas, diesel, or electric heating options — adapts to local energy availability.

Recommended Equipment

Typical projects in this industry use the following MUSI products in combination — exact selection depends on workpiece specifics:

Which heavy machinery coating lines has MUSI delivered?

MUSI Technology, a coating line manufacturer in Changzhou, China, builds coating lines and coating workshops for heavy machinery parts, with pretreatment, spray booths, curing and conveyors sized for the largest and heaviest part. Delivered projects include:

ProjectPartsPublished scope
Russia, 2023Excavator booms and loader chassis12 × 6 × 5 m spray booth and matching drying booth; parts up to 10 × 4 × 4 m and 8 tonnes
Chile, 2023Mining equipmentTurnkey 6,000 m² coating workshop delivered as EPC contractor in six months
KazakhstanVehicle frames, chassis parts and cargo bodiesOverhead conveyor coating line on a steel-structure platform
Jiangsu, ChinaConstruction machinery and agricultural equipment partsPretreatment for heavy steel, spray booths, curing oven sized for thick plate
Hefei, ChinaForklift frames, masts, counterweights and overhead guardsHeavy-duty conveyor coating line
Zhangjiagang, ChinaTower crane mast sections and construction hoistsSpray booths with two-level steel platforms
Guangxi, ChinaOperator cabs for loaders, graders, excavators, forklifts and tractorsCoating line with pretreatment, spray booths and curing sized to the cab
Shandong, ChinaHydraulic cylinder barrels and assembliesCoating line for long, heavy cylinder barrels

For export projects MUSI quotes the line with on-site installation, commissioning and operator training.

Featured Case Studies

Selected projects MUSI has delivered for clients in this industry. More projects in our Case Studies section:

Project References

Schedule a Consultation

The optimal solution depends on your specific workpieces, capacity, facility, and budget. MUSI provides a free consultation service including:

  • 1-on-1 process consultation with our engineers
  • Preliminary CAD line layout
  • Equipment list and preliminary quotation
  • Reference cases from similar industries
  • Welcome to visit MUSI's factory in Changzhou

Schedule Consultation