Liquid Spray Lines Overview

Liquid spray lines are one of MUSI's traditional strengths. We have deep expertise in water-based paint coating, 2K mixing systems, and electrostatic liquid spraying — offering everything from single-color manual to multi-color automatic configurations. MUSI Technology manufactures liquid spray lines and booths in Changzhou, China, for water-based, solvent-based, airless and electrostatic paints, and has delivered 800+ coating lines to 36 countries with on-site installation and training.

Liquid coatings (water-based, solvent-based, 2K paints) still dominate in automotive, furniture, and appliance exterior finishes. MUSI provides differentiated solutions tailored to each paint type's characteristics.

Industries: Automotive Parts, Furniture, Home Appliances

Models in This Category

Water-Based Paint Spray Line

Water-Based Paint Spray Line

Engineered for water-based paint's slow evaporation and strict temperature/humidity requirements — including climate-controlled paint mixing rooms, flash-off zones, and dust collection systems.

WATER-BASED PAINT LINE Details
Solvent-Based Liquid Spray Line

Solvent-Based Liquid Spray Line

Mature solvent-based paint coating solution — equipped with explosion-proof electrical, forced extraction, and waste gas treatment for safety and compliance.

SOLVENT-BASED SPRAY LINE Details
Airless High-Pressure Spray

Airless High-Pressure Spray

High-pressure pumps (piston or diaphragm) pressurize paint to 200-300 bar for atomization through the nozzle — high efficiency, thick film build.

AIRLESS SPRAY SYSTEM Details
Electrostatic Liquid Spray

Electrostatic Liquid Spray

Electrostatic charging of paint particles directs them onto the workpiece — improves transfer efficiency by 30%-50% compared to conventional air spray.

ELECTROSTATIC LIQUID SPRA Details
2K Mixing Spray Machine

2K Mixing Spray Machine

Precise ratio mixing system for two-component paints (polyurethane, epoxy) — mixed and sprayed immediately to avoid premature curing waste.

2K MIXING SPRAY MACHINE Details
Telescopic mobile spray booth fully extended over long steel beams

Telescopic Mobile Spray Booth

Rail-mounted retractable paint booth that extends over large steel structures and retracts to free the floor for crane loading; dry-filter or oil-film mist capture with carbon, UV or RCO exhaust treatment.

TELESCOPIC SPRAY BOOTH Details
Stainless steel paint mist treatment unit with ductwork

Oil-Film Paint Mist Purifier

Stainless-steel oil-film paint mist treatment unit that captures overspray on a circulating oil film instead of disposable filters or water — low consumable use, suitable for high-volume spraying.

OIL-FILM MIST PURIFIER Details
Dry paint mist filter cabinet with labyrinth paper filters

Dry Paint Mist Filter Cabinet

Dry-type paint mist filter cabinet with labyrinth paper and fibre filter stages for spray booths — no water, no sludge, quick filter change and stable negative pressure across the booth.

DRY FILTER CABINET Details
Stainless steel paint pressure tank with agitator in a paint mixing room

Paint Mixing Room

Explosion-proof paint mixing room with pressure tanks, pneumatic agitators, in-line filters and ventilation that feeds the spray line with consistent, ready-mixed paint.

PAINT MIXING ROOM Details
Compact box-type spray booth with white insulated panels on a steel base frame in a coating workshop

Industrial Paint Spray Booth

Crossdraft, semi-downdraft, downdraft and open-face paint booths with dry filter or water-wash overspray capture.

LIQUID PAINT SPRAY BOOTH Details

Selection Considerations

Different models target different applications and capacities. Before purchasing, please consider:

  • Workpiece characteristics — size, weight, geometry (flat / 3D), material (metal / plastic / wood)
  • Coating type — powder / liquid / UV / 2K, etc.
  • Capacity needs — shift output, cycle time, multi-color requirements
  • Facility conditions — available area, ceiling height, electrical/gas supply, emission requirements
  • Budget — balance of upfront investment and long-term running cost

MUSI engineers can run process simulations and ROI calculations based on your specifics. Contact us for a free proposal.