Electrostatic Liquid Spray
Electrostatic charging of paint particles directs them onto the workpiece — improves transfer efficiency by 30%-50% compared to conventional air spray.
Best for automotive parts, metal furniture, wheel rims
Technical Specifications
The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.
| Voltage | 60-90 kV adjustable |
|---|---|
| Spray gun type | Bell / disc / HVLP electrostatic |
| Transfer efficiency | ≥80% |
| Booth airflow | Cross-draft / down-draft |
| Number of guns | 2-8 configurable |
| Paint flow rate | 100-500 ml/min per gun |
| Paint resistivity range | 0.1-50 MΩ·cm |
Product Features
- Application-Specific Design — optimized for high-transfer-efficiency electrostatic finishing for automotive and metal parts, avoiding mismatched capacity or wrong sizing.
- Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment.
- Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
- Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
- Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.
Application References
This product has performed excellently in MUSI's customer installations. Selected references include:
- Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
- UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
- Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate
More references in our Case Studies section.
Service & Warranty
- Solution Design — free CAD line layout, process flow, and equipment list
- Warranty — 12 months full machine, 36 months on critical components
- Installation & Commissioning — engineers travel to your site for installation through production launch
- Operator Training — 3-5 days of free training for operators and maintenance technicians
- Response Time — 24-hour phone response, 72-hour on-site arrival (international)