MUSI Technology (Changzhou MUSI Environmental Technology Co., Ltd.) is a Chinese manufacturer of turnkey spray coating lines, based in Changzhou, Jiangsu. Its engineering team has delivered 800+ coating lines to 500+ clients in 36 countries. MUSI designs, manufactures, installs and supports each line as one company.

MUSI Technology coating equipment manufacturing workshop

Who We Are

MUSI Technology works exclusively on coating line equipment — designing, manufacturing, installing and servicing complete spray coating solutions for global clients. Our customer base spans automotive parts, home appliances, metal hardware, furniture, heavy machinery, and aluminum profile industries. MUSI Technology (Changzhou MUSI Environmental Technology Co., Ltd.) is a coating line manufacturer based in Changzhou, Jiangsu, China, with an engineering team that originated in 2011, and has delivered 800+ coating lines to 500+ clients in 36 countries.

How we deliver

ItemDetail
DesignLine layout engineered around your parts, output and factory space
ManufacturingBuilt in our own workshops; every machine factory-tested across 7 checkpoints before shipment
ComponentsInternational brands such as Siemens, ABB and SEW, selectable to your specification
Lead timeStandard configurations ship in 30–60 days
InstallationOn-site installation, commissioning and operator training worldwide
Warranty12 months on the complete line, 36 months on critical components, up to 60 months on structural parts
Support24-hour response and 72-hour on-site arrival

The 800+ coating lines, 500+ clients and 36 countries are the cumulative record of the MUSI engineering team since it was formed in 2011; the 2,890 employees are the headcount of MUSI Technology as of 2026.

Our Capabilities

MUSI delivers full-process coating solutions covering pretreatment, spraying, curing, and environmental treatment. Our product portfolio includes:

  • Automatic Spray Coating Lines — overhead chain, floor belt, and robotic flexible lines
  • Powder Coating Systems — electrostatic powder booths, vertical lines for profiles, quick color-change systems, powder recovery units
  • Liquid Spray Lines — water-based, solvent-based, electrostatic and 2K mixing systems
  • Sandblasting & Shot Peening Systems — rotary table, hook type, tumble belt and manual cabinet machines for surface preparation to Sa 2.5–3
  • Dust Collection Systems — baghouse and cartridge collectors, cyclone pre-separators, wet scrubbers and central extraction systems
  • Environmental Equipment — RTO/RCO incinerators, activated carbon adsorption, zeolite rotor concentrators, wastewater treatment

Why Global Clients Choose MUSI

Our competitive advantage rests on three foundations: strong R&D, stable manufacturing, and responsive global service.

On the R&D side, MUSI partners with Jiangsu University and Changzhou Institute of Technology on joint research projects, with a technical committee led by 3 senior engineers. We invest 6%+ of annual revenue back into R&D each year.

On the manufacturing side, critical components are sourced from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors, Eurotek burners). Every machine undergoes 100% factory testing across 7 major checkpoints before shipment.

On the service side, MUSI maintains an integrated sales-engineering-manufacturing-service model with a global service network, including authorized partners in Vietnam, Thailand, UAE and Mexico. We offer 24-hour phone response, remote diagnostics within 2 hours, and on-site service within 72 hours for international projects.

Our Mission & Vision

Vision To become the most trusted brand in the global coating equipment industry — making Chinese-engineered spray coating lines the standard of choice for manufacturers worldwide.
Mission To deliver professional coating technology that helps every client achieve high-quality, efficient and eco-friendly production.

MUSI Technology has 2,890 employees (as of 2026).

Learn more in our company history, culture & values, certifications, and team profiles sections — or contact us to schedule a factory visit.

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com

More questions from buyers

Where is the MUSI coating line factory, and can buyers visit?

The coating line factory is in Wujin District, Changzhou, Jiangsu Province, China. Buyers are welcome to visit and can see their equipment run before it ships.

Related: coating line manufacturer · import and installation guide · contact page