Industry Overview
Premium coating solutions for refrigerators, washing machines, air conditioners, and kitchen appliances — meeting strict appearance and durability standards.
Typical Workpieces
MUSI has served the Home Appliances industry with workpieces including:
- Refrigerator panels
- Washing machine shells
- AC panels
- Kitchen appliance doors
- Microwave cavities
- Water heater shells
- Range hood housings
- Rice cooker shells
Industry Coating Challenges
Each industry faces unique coating challenges. MUSI's solutions are designed to address these pain points directly:
High Visual Standards
Appliance exteriors are highly visible — strict requirements on color, smoothness, anti-fingerprint, etc.
Salt Spray Tests
Kitchen and laundry appliances used in humid environments must pass 480-1,000 hour salt spray tests.
Large & Complex Shapes
Refrigerator side panels and washing machine shells are large with deep-drawn and recessed structures.
Tight Supply Chain
Appliance OEMs enforce strict QC — suppliers must hold IATF/ISO and other certifications.
MUSI's Targeted Solutions
To address these challenges, MUSI provides industry-specific coating solutions:
1. Floor Belt Conveyor Spray Lines
Optimal for high-quality coating of large flat parts — belt widths up to 2,500 mm, load capacity up to 500 kg per station.
2. Electrostatic Powder Coating
Coating hardness 2H-3H with excellent mechanical properties — passes 1,000+ hours of salt spray.
3. Auto Inspection & Unload
Inline color and film thickness measurement; automatic rejection of non-conforming parts.
4. Standardized QC Documentation
Complete SOPs from pretreatment to finished part inspection — supports your appliance OEM audits.
Recommended Equipment
Typical projects in this industry use the following MUSI products in combination — exact selection depends on workpiece specifics:

Floor Belt Conveyor Spray Line

Electrostatic Powder Booth

Electrostatic Liquid Spray

Regenerative Thermal Oxidizer (RTO)
Which home appliance projects has MUSI delivered?
MUSI Technology, a coating line manufacturer in Changzhou, China, builds powder and liquid coating lines for appliance sheet-metal parts, with pretreatment and exhaust treatment in the same scope.
| Project | Line | Published figures |
|---|---|---|
| Mexico, range hood housings and sterilizer doors (2024) | Floor-belt powder coating line, 6-stage pretreatment, 8 guns; installed on site by MUSI engineers | Parts up to 1,500 × 800 × 600 mm and 30 kg; 80 parts per hour |
| Indonesia, kitchen appliances | Exhaust treatment, not a coating line: zeolite rotor + three-chamber RTO for the exhaust of five spray lines | 30,000 m³/h |
Featured Case Studies
Selected projects MUSI has delivered for clients in this industry. More projects in our Case Studies section:

Premium Powder Coating System for Appliance OEM
View Details
Kitchen Appliance Eco-Coating Upgrade
View Details
Sheet Metal Cabinet Drying Oven
View Details
Power Tool Housing Coating Solution
View DetailsProject References
| Case study | Location | Year |
|---|---|---|
| Premium Powder Coating System for Appliance OEM | Mexico | 2024 |
| Kitchen Appliance Eco-Coating Upgrade | Indonesia | 2024 |
| Sheet Metal Cabinet Drying Oven | Germany | 2023 |
| Power Tool Housing Coating Solution | South Africa | 2024 |
| Electrical Products Spray Coating Line, Bangladesh | Bangladesh | 2026 |
Schedule a Consultation
The optimal solution depends on your specific workpieces, capacity, facility, and budget. MUSI provides a free consultation service including:
- 1-on-1 process consultation with our engineers
- Preliminary CAD line layout
- Equipment list and preliminary quotation
- Reference cases from similar industries
- Welcome to visit MUSI's factory in Changzhou