Electrostatic Powder Booth
ELECTROSTATIC POWDER BOOTH

Electrostatic Powder Booth

High-voltage electrostatic spray guns (matching international tier-one brand quality levels) deliver excellent powder adhesion, dense uniform film, and form the standard configuration for powder coating. MUSI Technology, based in Changzhou, China, designs and manufactures this equipment in-house and has delivered 800+ coating lines to 36 countries, with on-site installation and operator training included.

Suitable for flat panels, profiles, hardware — covers most powder coating applications

Request Quote Call Us

Electrostatic Powder Booth Overview

An electrostatic powder booth sprays powder with high-voltage electrostatic guns at 60-100 kV and recovers overspray through a cyclone and cartridge dual-stage system.

Built for general-purpose, medium-volume powder coating with 2-16 guns, ≥95% powder recovery and epoxy, polyester, hybrid or fluorocarbon powders.

Technical Specifications

The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.

Spray gun typeHigh-voltage electrostatic gun, 60-100 kV
Number of guns2-16 configurable
Booth sizeCustomizable (standard 2×2×2.5 m)
Recovery methodCyclone + cartridge dual-stage
Recovery rate≥95%
Color change timeStandard 30-60 minutes
Powder typesEpoxy, polyester, hybrid, fluorocarbon

Product Features

  • Application-Specific Design — optimized for general-purpose powder coating for medium-volume production with multiple gun configurations, avoiding mismatched capacity or wrong sizing.
  • Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment. Brands are selected to the customer's specification and confirmed in the approved configuration.
  • Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
  • Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.

Application References

This product has performed excellently in MUSI's customer installations. Selected references include:

  • Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
  • UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
  • Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate

More references in our Case Studies section.

Service & Warranty

  • Solution Design — free CAD line layout, process flow, and equipment list
  • Warranty — 12 months full machine, 36 months on critical components (structural parts up to 60 months)
  • Installation & Commissioning — engineers travel to your site for installation through production launch
  • Operator Training — 3-5 days of free training for operators and maintenance technicians
  • Response Time — 24-hour phone response, 72-hour on-site arrival (international)

Frequently Asked Questions

QWhat is the standard delivery lead time?
Standard configurations ship in 30-60 days from contract signing and down payment. The delivery date for custom projects is confirmed in the contract.
QCan I visit MUSI's factory to see this equipment?
Absolutely. International visitors are warmly welcome at our Changzhou factory. We can show in-process equipment and videos of running customer installations. Book at least 1 day in advance — we provide pickup and engineer-led tours.
Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our powder coating line guide (indicative ex-works budgets from USD 75,000 to 2,000,000); a configured quotation is prepared from your part data.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com

More questions from buyers

What is a powder coat booth?

A powder coat booth, also called a powder coating spray booth, is the enclosure where electrostatic guns apply the powder and the overspray is collected for reuse. This booth uses 60-100 kV guns, 2-16 guns as required, and cyclone plus cartridge recovery of 95% or more.

Is MUSI a powder coating booth manufacturer?

Yes. MUSI is a powder coating booth manufacturer and builds the booth on its own or as part of a complete powder coating line, with the recovery system, curing oven and conveyor. Standard booth size is 2 x 2 x 2.5 m and larger booths are built to the part.

Related: powder coating line