Floor Belt Conveyor Spray Line
FLOOR BELT SPRAY LINE

Floor Belt Conveyor Spray Line

Workpieces placed flat on a powered belt conveyor — high load capacity, ideal for furniture panels, large castings, and flat metal sheets. MUSI Technology, based in Changzhou, China, designs and manufactures this equipment in-house and has delivered 800+ coating lines to 36 countries, with on-site installation and operator training included.

Workpiece weight ≤500 kg, max size 4000×2000 mm, belt width 1200-2500 mm

Request Quote Call Us

Conveyor painting system for flat parts

A floor belt conveyor coating line carries flat parts, panels and sheets through spray booths and drying ovens on a belt instead of hangers. It is the conveyor painting system for parts that cannot be hung: panels, boards, castings laid flat, small hardware in trays. For hanging parts see the overhead chain conveyor spray line.

Indicative price range (ex-works)

Indicative ex-works budget from our published complete coating line cost guide: a standard automatic coating line of this class is roughly USD 200,000-600,000, and high-throughput multi-line plants run USD 600,000-2,000,000. Conveyor and oven length, pretreatment stages and automation level move the figure, so every line is quoted per project once we have your part sizes and output target.

Technical Specifications

The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.

IndustriesFurniture, flat sheet metal, large machinery parts
Belt width1200 / 1800 / 2500 mm options
Load capacity≤500 kg per station
Belt speed0.3 - 4 m/min
Belt materialGalvanized steel / stainless steel
Heating temp.60-220 °C
Total length80-200 m

Product Features

  • Application-Specific Design — optimized for workpieces up to 500 kg and 4000×2000 mm, on belts 1200-2500 mm wide, avoiding mismatched capacity or wrong sizing.
  • Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment. Brands are selected to the customer's specification and confirmed in the approved configuration.
  • Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
  • Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
  • Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.

Application References

This product has performed excellently in MUSI's customer installations. Selected references include:

  • Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
  • UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
  • Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate

More references in our Case Studies section.

Service & Warranty

  • Solution Design — free CAD line layout, process flow, and equipment list
  • Warranty — 12 months full machine, 36 months on critical components (structural parts up to 60 months)
  • Installation & Commissioning — engineers travel to your site for installation through production launch
  • Operator Training — 3-5 days of free training for operators and maintenance technicians
  • Response Time — 24-hour phone response, 72-hour on-site arrival (international)

Frequently Asked Questions

QWhat is the standard delivery lead time?
Standard configurations ship in 30-60 days from contract signing and down payment. The delivery date for custom projects is confirmed in the contract.
QHow do I choose between gas and electric heating?
Where natural gas is reliably available at competitive cost, gas heating typically reduces operating costs by 35%-50% compared to electric heating for continuous operation. Electric heating's advantages: zero local emissions, easy maintenance, lower upfront cost. The choice depends on your local energy prices and emission requirements.
QCan I visit MUSI's factory to see this equipment?
Absolutely. International visitors are warmly welcome at our Changzhou factory. We can show in-process equipment and videos of running customer installations. Book at least 1 day in advance — we provide pickup and engineer-led tours.
Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com