Row of stainless steel paint circulation tanks along the wall of a paint mixing room, each with its own colour station
PAINT MIXING ROOM

Paint Mixing Room (Paint Kitchen)

Explosion-protected room where liquid paint is stored, mixed, filtered and pumped to the spray booths — ventilation, temperature control, paint circulation and 2K dosing in one enclosure. MUSI Technology, based in Changzhou, China, designs and manufactures this equipment in-house and has delivered 800+ coating lines to 36 countries, with on-site installation and operator training included.

Built for plants that spray solvent-borne or water-borne paint every shift and need mixing, thinning and solvent handling out of the booth and under controlled conditions.

Request Quote Call Us

Technical Specifications

Values below are typical ranges for this equipment type. The figures for your line are fixed in the written specification after we review your parts, output and site.

Room sizeTypical 3 x 3 x 3 m to 6 x 5 x 3.5 m internal, sized to daily paint volume
Construction50-100 mm rock-wool sandwich panels, sealed floor with spill containment, explosion relief panel where required
VentilationTypical 10-20 air changes per hour, explosion-protected exhaust fan, low-level extraction
TemperatureTypical 20-25 C with heating or air conditioning to keep viscosity stable
ElectricalExplosion-protected lighting, sockets, control box and motors (Ex zone per project)
Paint supplyPressure tanks 20-200 L, diaphragm or piston pumps, agitators, in-line filters
CirculationRing main with back-pressure regulator to the booths, optional central paint supply for several booths
2K handlingProportioning pump or electronic 2K dosing unit with pot-life monitoring
Solvent handlingSolvent day tank, waste solvent container, gun-wash station, static grounding points
Fire protectionFire-rated panels, extinguishing connection and gas detection interlocked with ventilation

Line Configuration

  • Insulated panel room with sealed floor, doors and viewing window
  • Explosion-protected ventilation with low-level extraction and interlock to the paint pumps
  • Paint storage racks, pressure tanks, agitators and filtration
  • Pumps and ring main delivering paint to the spray booths at constant pressure
  • 2K proportioning or dosing unit with flush-out and pot-life control
  • Solvent day tank, waste solvent handling and gun cleaning station

Paint Mixing Room in Practice

Photos from a paint mixing room and colour lab supplied for a multi-colour liquid spray line: one colour station per tank, wall-mounted regulators and gauges, a test spray booth for sample panels, and a colour matching lab with tinting-base dispenser.

Application References

Automotive parts and machinery plants, container and steel structure painting lines, furniture and appliance factories, and any liquid spray line where paint is mixed daily and several booths draw from one supply.

Engineering Commitment

Every line is engineered against a written performance specification. Line speed, cure profile, film build and emission level are stated in the contract and demonstrated on your own part at the factory trial run before shipment. One engineering team owns the whole chain — pretreatment, application, curing, conveying and emission control — so the trade-offs between them are settled on the drawing board, not on your factory floor.

Service & Delivery

Standard configurations ship in 30-60 days with a 12-month full-machine and 36-month critical-component warranty. On-site installation, commissioning and operator training are available worldwide, and process tuning and spare parts support continue for the working life of the line. Structural parts are covered for up to 60 months.

Frequently Asked Questions

Why not mix paint inside the booth?

Mixing in the booth exposes wet parts to dust and solvent vapour, and puts open paint containers in the spray zone. A separate ventilated room keeps mixing, thinning and solvent storage under controlled temperature and away from the workpieces.

Does the room need explosion-protected equipment for water-borne paint?

Most water-borne systems still contain co-solvents, and thinners and cleaning solvents are usually stored in the same room, so the electrical zone is set from the actual products used. We confirm the zone with your paint supplier before selecting equipment.

Can one mixing room feed several booths?

Yes. A ring main with a back-pressure regulator keeps supply pressure constant at each booth, and a central paint supply with agitated tanks handles several colours in parallel.

Further Reading

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our liquid spray line cost guide; a configured quotation is prepared from your part data. Published indicative ranges: compact manual liquid spray booths from around USD 15,000–40,000, semi-automatic lines with conveyor and flash-off/curing ovens roughly USD 80,000–400,000, and fully automatic multi-colour electrostatic lines from USD 400,000 to several million dollars.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com