Coating line equipment
CASE STUDY · 2026

Case Study: Spray Coating Line, Kenya

  • ClientKenyan manufacturer
  • IndustryGeneral Industry
  • Year2026
  • LocationKenya
  • ScaleSpray coating line with accessories, about 3.5 t
East AfricaSpray CoatingExport
Request Similar Solution Back to Cases

Summary

A spray coating production line with accessories, about 3.5 tonnes, supplied to a manufacturer in Kenya and shipped from China in February 2026. The line was delivered complete with its accessories and spare parts in one shipment so the client could install and start it without sourcing parts separately, and it supports the client's local production in East Africa.

Project Background

MUSI supplied a spray coating production line with accessories to a manufacturer in Kenya, shipped from China in February 2026.

The Challenge

Manufacturers in East Africa building up local production need coating equipment that is robust, easy to maintain and supported from a distance, with spare parts on hand.

MUSI's Solution

MUSI supplied a complete spray coating line with its accessories in one shipment, so the client could install and start the line without sourcing parts separately.

Overhead conveyor beside a spray booth wall
Overhead conveyor beside a spray booth wall

Equipment Scope

  • Spray coating equipment
  • Conveying
  • Drying / curing
  • Accessories and spare parts

Results

The line was shipped to Kenya in February 2026, supporting the client’s local production.

Selection logic: why this configuration

A complete line in one shipment with spare parts was chosen because a plant in East Africa cannot wait for follow-up consignments; everything needed to install and run the line, including wear items, travelled together. The equipment was specified for robustness and remote support rather than for maximum automation.

Scope of supply and key components

ItemSpecificationNotes
Spray coating equipment
Conveying
Drying / curing
Accessories and spare partsShipped with the line

Key components

Key components are available from international brands, configurable per customer specification, so that spare parts can be sourced locally over the life of the line. Brand names below are the usual options for this type of equipment; the brands actually fitted are fixed in the contract specification.

ComponentBrands available on request
Automatic liquid guns, pumps and 2K proportionersInternational tier-one spray gun, pump and 2K proportioner brands
Automatic powder guns and powder feedInternational tier-one powder spray gun brands
PLC and HMISiemens SIMATIC S7-1500, Mitsubishi Electric MELSEC iQ-R, Schneider Electric Modicon, OMRON NX, Rockwell Automation Allen-Bradley
Variable-frequency drivesABB ACS580, Siemens SINAMICS G120, Danfoss VLT, Schneider Electric Altivar, Yaskawa, Mitsubishi Electric
Conveyor gear motorsSEW-EURODRIVE, NORD DRIVESYSTEMS, Bonfiglioli, Siemens, Sumitomo Drive Technologies
Booth ceiling and intake filter mediaFreudenberg Viledon, AAF SureStop, Camfil, MANN+HUMMEL
Compressed air for powder feed and instrumentsAtlas Copco GA, Ingersoll Rand RS, KAESER ASD, Sullair

Not included in the scope of supply

  • Civil works, foundations and pits
  • Building services up to the battery limit: power supply, gas, compressed air, water and drainage
  • Local permits, emission approvals and third-party inspections
  • Paint or powder supply, unless stated in the contract
  • Installation labour and site utilities at the plant in Kenya

Services included with every line: engineering design, manufacturing, shipping documentation, installation supervision, commissioning, operator training, warranty and spare parts.

Typical programme

The durations below are typical for equipment of this class and are given for planning; they are not the recorded schedule of this project. A complete line usually runs 90–180 days from contract to acceptance, a single unit 30–60 days.

StageTypical durationWhat happens
Site survey and workpiece review5–10 daysRemote review of drawings and photos, or an engineer visit
Layout and detail design15–30 daysLayout drawing, utilities list and specification sign-off
Manufacturing45–90 daysBooths, ovens, conveyor, pretreatment and controls built and pre-assembled at the works
Shipping20–45 daysSea freight; equipment shipped in sections for on-site assembly
Installation15–40 daysMUSI supervision with the client's installation crew or MUSI crew
Commissioning, training and acceptance7–15 daysTrial runs on the client's parts, operator training, acceptance record

Applicability and limits

The line is sized for the client's parts and volume; details of the workpieces are not published at the client's request. Shipment date is from the shipping records.

Results shown in this case study reflect the stated operating conditions and should not be interpreted as guaranteed performance under different feed, production, environmental, or site conditions.

After-sales and spare parts

Warranty on a MUSI coating line runs from acceptance: 12 months on the complete line excluding consumables, 36 months on critical components such as motors, drives and the PLC, and 60 months on structural parts such as steel structure, ducting and oven bodies. Failures within warranty, excluding misuse, are repaired free of charge.

Support starts remotely: the service line is staffed around the clock, a preliminary diagnosis with recommendations is given within 2 hours, and where a site visit is needed an engineer reaches any major city within 72 hours. A spare-parts inventory is held at the Changzhou headquarters with same-day shipping, and customers can keep a dedicated parts stock at MUSI for emergencies. Details are on the after-sales service page.

FAQ

How is a coating line supported in East Africa? Remotely first: diagnosis within 2 hours by phone or WhatsApp, spare parts shipped from Changzhou, and an engineer visit where needed.

Why ship spare parts with the line? So wear items are on site from day one and the line is not stopped waiting for a consignment.

What was delivered? A spray coating line with accessories and spare parts, about 3.5 tonnes, in February 2026.

Can the line be expanded later? Yes; conveying, booths and drying can be extended once the client's volume grows.

What information is needed for a similar line? Workpiece photos and dimensions, required output, number of colours and available floor space; see the next-step section below.

Next step: a configuration proposal for a similar line

If your parts, volumes or plant conditions are close to this project, MUSI can return a line configuration and layout proposal. To prepare it we need four things:

  • Photos and dimensions of the workpieces, with weight and material
  • Required output (pieces per hour or per day, and shifts)
  • Number of colours and how often colour changes are needed
  • Available floor space and ceiling height, with the utilities on site

Message us on WhatsApp with these details, or use the quotation form.

Published 2026-09-26 · Updated 2026-09-30 · Last technical review: 2026-09-30

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com

Get a Similar Solution

If your industry and requirements match this case, contact MUSI to schedule a free consultation. We'll design an optimal solution based on your specific workpieces, capacity, and facility.

Provided by Lin Cong, Technical Director, MUSI Technology