Case Study: Door & Window Profile Continuous Coating

Door & WindowAluminum ProfilesHigh Efficiency
Request Similar Solution Back to Cases

Summary

A vertical powder coating line for a door and window profile manufacturer in Australia supplying high-end residential developments, coating 1,000,000 m of aluminium profile a year with 8–12 standard colours. Eight independent powder hoppers give a 12-minute colour change, an inline X-Rite colour meter samples every 30 m, profiles from 1.5 to 6.5 m run at 1.5–3 m/min, and film build is 60–100 μm. Capacity is 80% above the old line and the colour-consistency pass rate is 99.8%, as reported after commissioning in 2023.

Project Background

The client is a leading door & window profile manufacturer in Australia, supplying multiple high-end residential developments. Their line capacity bottleneck caused long order lead times — capacity expansion was urgent.

The Challenge

Door & window profile coating demands extreme color stability and gloss consistency (zero color variation across an order). With 8-12 mainstream colors common, fast color change is essential.

MUSI's Solution

MUSI designed a vertical powder coating line + 8 independent powder hoppers — color change in just 12 minutes. Inline color difference meter samples every 30 m, ensuring color consistency.

Equipment Configuration

Line typeVertical powder coating continuous line
Profile length1.5-6.5 m
Hoppers8 independent + main hopper
Color change time12 minutes
Conveyor speed1.5-3 m/min
Annual capacity1,000,000 m profile
Color difference detectionX-Rite color meter, inline
Film thickness60-100 μm

Profile work of this kind is normally built around a vertical powder coating line; vertical vs horizontal aluminium profile coating lines explains when a horizontal layout is the better answer.

Implementation

90-day delivery. The client's existing line was connected to the new line within 12 hours of stoppage — no impact on continuous production.

Results

New line capacity 80% higher than old. Color consistency pass rate 99.8%. The client won strategic supplier status with multiple top-tier developers.

Client Feedback

"Premium door & window market demands extreme color stability. MUSI's color management system gave us zero customer complaints."
— Project Manager, Client Side

Selection logic: why this configuration

A vertical line was chosen over horizontal because profiles up to 6.5 m coat evenly all round when hung upright and the plant had the height. Eight dedicated hoppers were specified because the client's colour palette is fixed at 8–12 colours and a hopper per colour turns a change into a booth clean rather than a powder swap. An inline colour meter was added, rather than lab checks, because a batch for one building must not drift.

Scope of supply and key components

ItemSpecificationNotes
Vertical powder lineProfiles 1.5–6.5 m, 1.5–3 m/min
Powder supply8 independent hoppers + main hopper12 min colour change
Colour controlInline colour meter, sample every 30 m
Booth and recoveryQuick-clean booth, cyclone recoveryFilm 60–100 μm
Pretreatment and ovenSpray pretreatment, gas curing oven

Key components

Key components are available from international brands, configurable per customer specification, so that spare parts can be sourced locally over the life of the line. Brand names below are the usual options for this type of equipment; the brands actually fitted are fixed in the contract specification.

ComponentBrands available on request
Automatic powder guns and powder feedInternational tier-one powder spray gun brands
Oven and dryer gas burnersRiello RS series, Weishaupt monarch WM-G, Baltur TBG, Honeywell Maxon OVENPAK, Eclipse
PLC and HMISiemens SIMATIC S7-1500, Mitsubishi Electric MELSEC iQ-R, Schneider Electric Modicon, OMRON NX, Rockwell Automation Allen-Bradley
Variable-frequency drivesABB ACS580, Siemens SINAMICS G120, Danfoss VLT, Schneider Electric Altivar, Yaskawa, Mitsubishi Electric
Conveyor gear motorsSEW-EURODRIVE, NORD DRIVESYSTEMS, Bonfiglioli, Siemens, Sumitomo Drive Technologies
Pretreatment pumps and chemistryGrundfos CR, KSB Etanorm, Xylem; Henkel BONDERITE, Chemetall Gardobond, PPG Zircobond, Nippon Paint
Dust collector filter cartridgesDonaldson Ultra-Web, Parker BHA, Camfil, MANN+HUMMEL
Sensors and temperature controllersSICK, Pepperl+Fuchs, OMRON E5CC, Honeywell UDC, Yokogawa UT, ifm, KEYENCE

Not included in the scope of supply

  • Civil works, foundations and pits
  • Building services up to the battery limit: power supply, gas, compressed air, water and drainage
  • Local permits, emission approvals and third-party inspections
  • Paint or powder supply, unless stated in the contract

Services included with every line: engineering design, manufacturing, shipping documentation, installation supervision, commissioning, operator training, warranty and spare parts.

Typical programme

The durations below are typical for equipment of this class and are given for planning; they are not the recorded schedule of this project. A complete line usually runs 90–180 days from contract to acceptance, a single unit 30–60 days.

StageTypical durationWhat happens
Site survey and workpiece review5–10 daysRemote review of drawings and photos, or an engineer visit
Layout and detail design15–30 daysLayout drawing, utilities list and specification sign-off
Manufacturing45–90 daysBooths, ovens, conveyor, pretreatment and controls built and pre-assembled at the works
Shipping20–45 daysSea freight; equipment shipped in sections for on-site assembly
Installation15–40 daysMUSI supervision with the client's installation crew or MUSI crew
Commissioning, training and acceptance7–15 daysTrial runs on the client's parts, operator training, acceptance record

Results: before and after

Figures are those published on this page; measurement party, sample size, test date and method are not on record here and are left blank rather than estimated.

MetricBeforeAfterChangeMeasured bySingle / averageSamplesTest dateMethod / instrument
Line capacityold line+80%+80%
Colour-consistency pass rate—99.8%—
Colour change—12 min—

Applicability and limits

The 12-minute colour change assumes one hopper per colour and a quick-clean booth; a palette larger than the hopper count adds powder-swap time. Inline colour measurement flags drift but does not replace matching to the customer's reference panel, and the capacity figure is for architectural extrusions rather than heavy industrial sections.

Results shown in this case study reflect the stated operating conditions and should not be interpreted as guaranteed performance under different feed, production, environmental, or site conditions.

After-sales and spare parts

Warranty on a MUSI coating line runs from acceptance: 12 months on the complete line excluding consumables, 36 months on critical components such as motors, drives and the PLC, and 60 months on structural parts such as steel structure, ducting and oven bodies. Failures within warranty, excluding misuse, are repaired free of charge.

Support starts remotely: the service line is staffed around the clock, a preliminary diagnosis with recommendations is given within 2 hours, and where a site visit is needed an engineer reaches any major city within 72 hours. A spare-parts inventory is held at the Changzhou headquarters with same-day shipping, and customers can keep a dedicated parts stock at MUSI for emergencies. Details are on the after-sales service page.

FAQ

How is colour consistency held across a whole building order? An inline colour meter samples the coated profile every 30 m and flags drift against the reference, so the line is corrected before a batch is affected; the pass rate is 99.8%.

How long does a colour change take? Twelve minutes with eight dedicated hoppers and a quick-clean booth; the change is a booth clean, not a powder swap.

What is the film thickness for architectural profiles? Sixty to one hundred microns on this line, set to the client's architectural specification.

Why a vertical line for window profiles? Profiles up to 6.5 m hang upright with only one hook point, coat evenly on all faces and take half the floor area of a horizontal line.

How was the old line connected? The changeover to the new line took about 12 hours of stoppage, with the new line built beside the old one first.

Next step: a configuration proposal for a similar line

If your parts, volumes or plant conditions are close to this project, MUSI can return a line configuration and layout proposal. To prepare it we need four things:

  • Photos and dimensions of the workpieces, with weight and material
  • Required output (pieces per hour or per day, and shifts)
  • Number of colours and how often colour changes are needed
  • Available floor space and ceiling height, with the utilities on site

Message us on WhatsApp with these details, or use the quotation form.

Provided by Lin Cong, Technical Director, MUSI Technology · Published 2026-05-02 · Updated 2026-09-30 · Last technical review: 2026-09-30

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.