Energy-storage box in a coating line
CASE STUDY · 2026

Case Study: Energy-Storage Box Painting Line, Jiangyin

Energy StorageBox PaintingSpray Line
Request Similar Solution Back to Cases

Summary

An energy-storage box painting line for the new-energy business of an industrial group founded in 1993, based in Jiangyin, Jiangsu, which builds grid-side, commercial and industrial, and residential storage systems with its own PCS, EMS and BMS and is expanding into Europe. The line comprises surface preparation, container-scale paint booths for primer and topcoat, drying and forced cooling, a transfer system between stations and exhaust with VOC treatment. The reference configuration on this page is a current 20-ft box line design. The line is in production in 2026.

Project Background

The client, based in Jiangyin, Jiangsu, is the new-energy business of an industrial group founded in 1993. It builds energy-storage systems for grid-side, commercial and industrial, and residential use, together with its own PCS, EMS and BMS, and is expanding into Europe. MUSI supplied its energy-storage box painting line.

The Challenge

An energy-storage box stands outdoors for the whole service life of the batteries inside it. The paint has to protect the steel against sun, rain and corrosion for years, every seam and door frame has to be covered, and output has to keep up with fast-growing storage demand.

MUSI's Solution

MUSI supplied a painting line sized for energy-storage boxes: surface preparation, container-scale paint booths for primer and topcoat, drying and forced cooling, and exhaust treatment, with boxes moved between stations so each one follows the same sequence and receives the same film build.

Energy-storage container pretreatment
Energy-storage container pretreatment

Equipment Scope

  • Surface preparation
  • Container-scale paint booths for primer and topcoat
  • Drying and forced cooling
  • Transfer system between stations
  • Exhaust and VOC treatment

Reference Configuration: 20-ft Energy-Storage Box Line

The figures below come from a current 20-ft energy-storage box line design. They show how a line of this type is typically configured; each plant’s line is sized to its own product mix and output.

Workpiece20-ft box, 6,058 × 2,438 × 2,591 mm, up to 2,500 kg
ConveyorBox-pulling chain (32A roller chain), approx. 280 m
Surface preparationAutomatic shot blasting room (10 × 6.6 × 5 m) with servo reciprocators on both sides and top; cleaning room with automatic blow-off; abrasive recovery and cartridge dust collector
Liquid paint boothsPrimer, intermediate and topcoat booths, 10 × 6.6 × 5.2 m, reciprocators on both sides, top and bottom; interior-cavity primer applied by robot
RobotsYaskawa 7-axis explosion-proof, 15 kg payload, 2,700 mm reach, on travel rails
Paint supplyHigh-pressure airless automatic guns from international tier-one spray gun brands; 2K automatic mixing for primer, intermediate and topcoat
Powder boothAutomatic, 9.8 × 4.9 × 4.2 m; cyclone and cartridge recovery; explosion isolation valves and flameless venting
OvensPaint drying 80–120 °C; powder curing 200–220 °C; direct natural-gas heating (280,000 and 440,000 kcal/h burners); forced cooling after each oven
Quality checkRain test chamber, 10 × 6 × 5 m
VOC treatment160,000 m³/h dry filtration + activated carbon adsorption + catalytic combustion
OutputReference layout: 20 boxes per 12 hours. MUSI’s fastest energy-storage box lines release one finished box per minute.

Results

The line paints energy-storage boxes for the client’s storage systems. At their fastest, MUSI’s energy-storage box lines release one finished box per minute.

Selection logic: why this configuration

Container-scale booths were specified although the client is a systems integrator rather than a container maker, because its grid-side products are 20-ft boxes and the finish is judged by utility customers against container standards. A transfer system between stations was chosen so the line runs its current volume with the option to add stations as the European business grows.

Scope of supply and key components

ItemSpecificationNotes
Surface preparation
Paint boothsContainer-scale, primer and topcoat
DryingDrying and forced cooling
Transfer systemBetween stations
Exhaust and VOC treatment

Key components

Key components are available from international brands, configurable per customer specification, so that spare parts can be sourced locally over the life of the line. Brand names below are the usual options for this type of equipment; the brands actually fitted are fixed in the contract specification.

ComponentBrands available on request
Automatic liquid guns, pumps and 2K proportionersInternational tier-one spray gun, pump and 2K proportioner brands
Painting robotsABB IRB 5500, FANUC P-350iA, Yaskawa MOTOMAN MPX series, KUKA, Kawasaki
Oven and dryer gas burnersRiello RS series, Weishaupt monarch WM-G, Baltur TBG, Honeywell Maxon OVENPAK, Eclipse
PLC and HMISiemens SIMATIC S7-1500, Mitsubishi Electric MELSEC iQ-R, Schneider Electric Modicon, OMRON NX, Rockwell Automation Allen-Bradley
Variable-frequency drivesABB ACS580, Siemens SINAMICS G120, Danfoss VLT, Schneider Electric Altivar, Yaskawa, Mitsubishi Electric
Booth ceiling and intake filter mediaFreudenberg Viledon, AAF SureStop, Camfil, MANN+HUMMEL
RTO ceramic media and burnersLantec MLM, Honeywell Maxon line burners, Riello RS, Eclipse
Sensors and temperature controllersSICK, Pepperl+Fuchs, OMRON E5CC, Honeywell UDC, Yokogawa UT, ifm, KEYENCE

Not included in the scope of supply

  • Civil works, foundations and pits
  • Building services up to the battery limit: power supply, gas, compressed air, water and drainage
  • Local permits, emission approvals and third-party inspections
  • Paint or powder supply, unless stated in the contract

Services included with every line: engineering design, manufacturing, shipping documentation, installation supervision, commissioning, operator training, warranty and spare parts.

Typical programme

The durations below are typical for equipment of this class and are given for planning; they are not the recorded schedule of this project. A complete line usually runs 90–180 days from contract to acceptance, a single unit 30–60 days.

StageTypical durationWhat happens
Site survey and workpiece review5–10 daysRemote review of drawings and photos, or an engineer visit
Layout and detail design15–30 daysLayout drawing, utilities list and specification sign-off
Manufacturing45–90 daysBooths, ovens, conveyor, pretreatment and controls built and pre-assembled at the works
Shipping20–45 daysSea freight; equipment shipped in sections for on-site assembly
Installation15–40 daysMUSI supervision with the client's installation crew or MUSI crew
Commissioning, training and acceptance7–15 daysTrial runs on the client's parts, operator training, acceptance record

Applicability and limits

The reference configuration is a design for 20-ft boxes and its output is a design value; this line is sized to the client's box programme. Boxes for Europe may need coating systems and VOC limits set by the destination market, covered in the Europe guide linked below.

Results shown in this case study reflect the stated operating conditions and should not be interpreted as guaranteed performance under different feed, production, environmental, or site conditions.

After-sales and spare parts

Warranty on a MUSI coating line runs from acceptance: 12 months on the complete line excluding consumables, 36 months on critical components such as motors, drives and the PLC, and 60 months on structural parts such as steel structure, ducting and oven bodies. Failures within warranty, excluding misuse, are repaired free of charge.

Support starts remotely: the service line is staffed around the clock, a preliminary diagnosis with recommendations is given within 2 hours, and where a site visit is needed an engineer reaches any major city within 72 hours. A spare-parts inventory is held at the Changzhou headquarters with same-day shipping, and customers can keep a dedicated parts stock at MUSI for emergencies. Details are on the after-sales service page.

FAQ

What finish do grid-side energy-storage boxes need? A container-grade exterior system for years outdoors, full coverage of seams and doors, and a sealing check; the reference configuration shows the typical stations.

Can a systems integrator run its own box painting line? Yes; this client paints its own boxes so that enclosure quality and lead time are under its control rather than a container supplier's.

What VOC requirements apply for boxes going to Europe? The destination market sets the paint system and emission rules; the Europe guide linked below explains what changes in the paint shop.

How are boxes moved between stations? By a transfer system, so each box follows the same primer, topcoat, drying and cooling sequence.

Is the line running? Yes, painting energy-storage boxes for the client's storage systems.

Next step: a configuration proposal for a similar line

If your parts, volumes or plant conditions are close to this project, MUSI can return a line configuration and layout proposal. To prepare it we need four things:

  • Photos and dimensions of the workpieces, with weight and material
  • Required output (pieces per hour or per day, and shifts)
  • Number of colours and how often colour changes are needed
  • Available floor space and ceiling height, with the utilities on site

Message us on WhatsApp with these details, or use the quotation form.

Published 2026-09-26 · Updated 2026-09-30 · Last technical review: 2026-09-30

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com

Get a Similar Solution

If your industry and requirements match this case, contact MUSI to schedule a free consultation. We'll design an optimal solution based on your specific workpieces, capacity, and facility.

Provided by Lin Cong, Technical Director, MUSI Technology