Regenerative Thermal Oxidizer (RTO)
3-chamber or 2-chamber RTO with ceramic regenerative heat exchanger recovering high-temperature exhaust heat. VOCs destruction efficiency ≥98% — the best solution for high-flow, low-concentration exhaust.
For airflow 5,000-100,000 m³/h, concentration ≤2,000 mg/m³
Technical Specifications
The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.
| Air flow | 5,000 - 100,000 m³/h |
|---|---|
| VOCs DRE | ≥98% |
| Heat recovery | ≥95% (3-chamber) / 90% (2-chamber) |
| Combustion temp. | 760-820 °C |
| Inlet concentration | ≤2,000 mg/m³ |
| Self-sustained | ≥250 mg/m³ (no auxiliary fuel) |
| Type | 2-chamber / 3-chamber / rotary |
Product Features
- Application-Specific Design — optimized for For airflow 5, avoiding mismatched capacity or wrong sizing.
- Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment.
- Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
- Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
- Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.
Application References
This product has performed excellently in MUSI's customer installations. Selected references include:
- Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
- UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
- Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate
More references in our Case Studies section.
Service & Warranty
- Solution Design — free CAD line layout, process flow, and equipment list
- Warranty — 12 months full machine, 36 months on critical components
- Installation & Commissioning — engineers travel to your site for installation through production launch
- Operator Training — 3-5 days of free training for operators and maintenance technicians
- Response Time — 24-hour phone response, 72-hour on-site arrival (international)