Download Center

MUSI provides product brochures, technical specifications, application cases, and operation manuals for your reference. All documents are kept current and updated periodically.

Note: "Operation Manuals" are restricted to MUSI customers and require contract verification. All other documents are public. For documents not listed, contact us.

Product Brochures

MUSI Company Brochure (English)
PDF · 12.5 MB
Download
MUSI Company Brochure (Spanish)
PDF · 11.8 MB
Download
Automatic Spray Lines Brochure
PDF · 8.6 MB
Download
Powder Coating Equipment Brochure
PDF · 9.2 MB
Download
Liquid Spray Equipment Brochure
PDF · 7.8 MB
Download
Sandblasting & Shot Peening Systems Equipment Brochure
PDF · 6.4 MB
Download
Dust Collection Systems Brochure
PDF · 5.9 MB
Download
VOCs Treatment Brochure
PDF · 10.3 MB
Download

Technical Specifications

Overhead Chain Auto Spray Line — TDS
PDF · 3.2 MB
Download
Robotic Flexible Coating Line — TDS
PDF · 4.1 MB
Download
Vertical Powder Coating System — TDS
PDF · 2.8 MB
Download
RTO Regenerative Thermal Oxidizer — TDS
PDF · 3.5 MB
Download
Zeolite Rotor Concentrator — TDS
PDF · 3.0 MB
Download
Water-Based Paint Spray Line — TDS
PDF · 2.6 MB
Download

Application Case Studies

Automotive Parts Coating Cases (2024)
PDF · 15.6 MB
Download
Home Appliance Coating Cases (2024)
PDF · 13.2 MB
Download
Metal Hardware Coating Cases (2024)
PDF · 11.8 MB
Download
Furniture Coating Cases (2024)
PDF · 12.4 MB
Download
Heavy Machinery Coating Cases (2024)
PDF · 14.0 MB
Download
Aluminum Profile Coating Cases (2024)
PDF · 10.6 MB
Download

Operation Manuals (Customers Only)

MUSI PLC Control System Manual
PDF · 5.3 MB
Download
HMI Touchscreen User Guide
PDF · 4.2 MB
Download
Dust Collection Systems Daily Maintenance
PDF · 2.8 MB
Download
RTO Equipment O&M Manual
PDF · 3.6 MB
Download
Environmental CEMS Setup Guide
PDF · 2.4 MB
Download

Industry White Papers

2024 Global Coating Equipment Industry Report
PDF · 8.6 MB
Download
VOCs Treatment Technology & Solution Guide
PDF · 6.2 MB
Download
Powder Coating Energy Retrofit Guide
PDF · 5.8 MB
Download
Smart Coating Line Construction Guide
PDF · 7.4 MB
Download

Download Notes

  • All documents are PDF format — requires Adobe Reader or compatible
  • Files are large — Wi-Fi recommended
  • If a download link fails, contact your sales representative for resending
  • All documents are MUSI's intellectual property — for reference only, not for commercial redistribution
  • For latest quotations or customized documents, please contact us