Overhead Chain Spray Line
Suspended overhead conveyor system that transports workpieces through pretreatment, spraying, curing, and cooling stages — ideal for high-volume small-part coating.
Workpiece weight ≤25 kg, length ≤2.5 m, cycle time 3-8 sec/piece
Technical Specifications
The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.
| Industries | Hardware, automotive small parts, lighting, appliance shells |
|---|---|
| Workpiece size | L ≤2500 × W ≤800 × H ≤1500 mm |
| Chain speed | 0.5 - 5 m/min, infinitely adjustable |
| Cycle time | 3-8 sec/piece (adjustable) |
| Heating | Natural gas / Electric (selectable) |
| Control system | Siemens PLC + HMI touchscreen |
| Total length | 60-150 m (custom-engineered) |
Product Features
- Application-Specific Design — optimized for Workpiece weight ≤25 kg, avoiding mismatched capacity or wrong sizing.
- Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment.
- Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
- Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
- Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.
Application References
This product has performed excellently in MUSI's customer installations. Selected references include:
- Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
- UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
- Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate
More references in our Case Studies section.
Service & Warranty
- Solution Design — free CAD line layout, process flow, and equipment list
- Warranty — 12 months full machine, 36 months on critical components
- Installation & Commissioning — engineers travel to your site for installation through production launch
- Operator Training — 3-5 days of free training for operators and maintenance technicians
- Response Time — 24-hour phone response, 72-hour on-site arrival (international)