Liquid Spray Lines Overview
Liquid spray lines are one of MUSI's traditional strengths. We have deep expertise in water-based paint coating, 2K mixing systems, and electrostatic liquid spraying — offering everything from single-color manual to multi-color automatic configurations.
Liquid coatings (water-based, solvent-based, 2K paints) still dominate in automotive, furniture, and appliance exterior finishes. MUSI provides differentiated solutions tailored to each paint type's characteristics.
Models in This Category

Water-Based Paint Spray Line
Engineered for water-based paint's slow evaporation and strict temperature/humidity requirements — including climate-controlled paint mixing rooms, flash-off zones, and dust collection systems.

Solvent-Based Liquid Spray Line
Mature solvent-based paint coating solution — equipped with explosion-proof electrical, forced extraction, and waste gas treatment for safety and compliance.

Airless High-Pressure Spray
High-pressure pumps (piston or diaphragm) pressurize paint to 100-300 bar for atomization through the nozzle — high efficiency, thick film build.

Electrostatic Liquid Spray
Electrostatic charging of paint particles directs them onto the workpiece — improves transfer efficiency by 30%-50% compared to conventional air spray.

2K Mixing Spray Machine
Precise ratio mixing system for two-component paints (polyurethane, epoxy) — mixed and sprayed immediately to avoid premature curing waste.
Selection Considerations
Different models target different applications and capacities. Before purchasing, please consider:
- Workpiece characteristics — size, weight, geometry (flat / 3D), material (metal / plastic / wood)
- Coating type — powder / liquid / UV / 2K, etc.
- Capacity needs — shift output, cycle time, multi-color requirements
- Facility conditions — available area, ceiling height, electrical/gas supply, emission requirements
- Budget — balance of upfront investment and long-term running cost
MUSI engineers can run process simulations and ROI calculations based on your specifics. Contact us for a free proposal.