Changzhou MUSI Environmental Technology Co., Ltd. (MUSI Technology) is a leading manufacturer of industrial spray coating lines based in Changzhou — the manufacturing heartland of China's Yangtze River Delta region.
Who We Are
MUSI Technology has spent many years dedicated exclusively to coating line equipment — designing, manufacturing, installing and servicing complete spray coating solutions for global clients. Our customer base spans automotive parts, home appliances, metal hardware, furniture, heavy machinery, and aluminum profile industries.
To date, we have delivered 800+ coating production lines to 500+ clients across 36 countries in Southeast Asia, the Middle East, Europe, Latin America, and Africa. Our facility covers 28,000 m² (approx. 300,000 sq.ft.) with 3 modern production halls, 1 R&D center, 32 engineering staff, and 86 patents and software copyrights.
Our Capabilities
MUSI delivers full-process coating solutions covering pretreatment, spraying, curing, and environmental treatment. Our product portfolio includes:
- Automatic Spray Coating Lines — overhead chain, floor belt, and robotic flexible lines
- Powder Coating Systems — electrostatic powder booths, vertical lines for profiles, quick color-change systems, powder recovery units
- Liquid Spray Lines — water-based, solvent-based, electrostatic and 2K mixing systems
- Sandblasting & Shot Peening Systems — LED cold-light, mercury UV, roller UV coating lines
- Dust Collection Systems — gas, electric, and infrared heating with energy recovery
- Environmental Equipment — RTO/RCO incinerators, activated carbon adsorption, zeolite rotor concentrators, wastewater treatment
Why Global Clients Choose MUSI
Our competitive advantage rests on three foundations: strong R&D, stable manufacturing, and responsive global service.
On the R&D side, MUSI partners with Jiangsu University and Changzhou Institute of Technology on joint research projects, with a technical committee led by 3 senior engineers. We invest 6%+ of annual revenue back into R&D each year.
On the manufacturing side, we are certified to ISO 9001:2015, ISO 14001:2015, and ISO 45001:2018. Critical components are sourced from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors, Eurotek burners). Every machine undergoes 100% factory testing across 7 major checkpoints before shipment.
On the service side, MUSI maintains an integrated sales-engineering-manufacturing-service model with a global service network, including authorized partners in Vietnam, Thailand, UAE and Mexico. We offer 24-hour phone response, remote diagnostics within 2 hours, and on-site service within 72 hours for international projects.
Our Mission & Vision
Vision To become the most trusted brand in the global coating equipment industry — making Chinese-engineered spray coating lines the standard of choice for manufacturers worldwide.
Mission To deliver professional coating technology that helps every client achieve high-quality, cost-effective, and eco-friendly production.
Learn more in our company history, culture & values, certifications, and team profiles sections — or contact us to schedule a factory visit.