Automatic Spray Coating Lines Overview
Automatic spray coating lines are MUSI's flagship product line, with 300+ installations running stably worldwide. We provide end-to-end services from workpiece analysis, line layout design, equipment manufacturing, installation, commissioning, to operator training.
Overhead chain, floor belt, and robotic flexible spray coating lines for high-volume automotive parts, appliance, and hardware production. Capacity ranges from 8,000 to 30,000 pieces per shift.
Models in This Category

Overhead Chain Spray Line
Suspended overhead conveyor system that transports workpieces through pretreatment, spraying, curing, and cooling stages — ideal for high-volume small-part coating.

Floor Belt Conveyor Spray Line
Workpieces placed flat on a powered belt conveyor — high load capacity, ideal for furniture panels, large castings, and flat metal sheets.

Reciprocator Spray Line
Vertical or horizontal reciprocator carriages with spray guns moving in regular patterns — paired with workpiece conveyance for uniform coating coverage.

Robotic Flexible Coating Line
Equipped with ABB / KUKA / FANUC 6-axis industrial robots with vision recognition and offline programming — high-precision automatic coating for complex workpieces.

Modular Combined Spray Line
Standardized modular design — pretreatment, spraying, curing, and cooling modules combine flexibly, enabling capacity expansion and process upgrades over time.
Selection Considerations
Different models target different applications and capacities. Before purchasing, please consider:
- Workpiece characteristics — size, weight, geometry (flat / 3D), material (metal / plastic / wood)
- Coating type — powder / liquid / UV / 2K, etc.
- Capacity needs — shift output, cycle time, multi-color requirements
- Facility conditions — available area, ceiling height, electrical/gas supply, emission requirements
- Budget — balance of upfront investment and long-term running cost
MUSI engineers can run process simulations and ROI calculations based on your specifics. Contact us for a free proposal.