Spray coating line videos from MUSI Technology

This page shows the videos published on the MUSI Technology YouTube channel: spray coating lines in operation, overhead conveyors carrying parts through a coating workshop, coated automotive, panel and profile parts, and manual spraying inside a spray booth. The list is synced with the channel.

Robotic Spray Painting for Generator Engine Components

Robotic Spray Painting for Generator Engine Components

Robotic spray painting in action.

2026-10-27 · YouTube
Overhead Conveyor for Frame Components

Overhead Conveyor for Frame Components

Watch frame components moving along an overhead conveyor.

2026-10-27 · YouTube
Panel Powder Coating Inside a Spray Booth

Panel Powder Coating Inside a Spray Booth

See panel components inside a spray booth.

2026-10-27 · YouTube
Powder Coating Booth: A Short Process View

Powder Coating Booth: A Short Process View

A short view inside a coating booth.

2026-10-27 · YouTube
Coating Line Layout and Workshop View

Coating Line Layout and Workshop View

Take a closer look at the coating workshop, conveyor route and process area.

2026-10-26 · 0:12 · YouTube
Manual Spray Coating for Metal Components

Manual Spray Coating for Metal Components

Watch manual spray coating for metal components inside a spray booth.

2026-10-26 · 0:29 · YouTube
Metal Profile Coating Line in Action

Metal Profile Coating Line in Action

See metal profiles along a coating line, with close-up views of workpieces and the spray area.

2026-10-26 · 0:17 · YouTube
Spray Coating Line in Operation

Spray Coating Line in Operation

Watch workpieces move through an industrial spray coating line.

2026-10-26 · 0:11 · YouTube
Automotive Parts Coating Line and Surface Details

Automotive Parts Coating Line and Surface Details

Explore coated automotive components, conveyor handling and surface details.

2026-10-26 · 0:13 · YouTube
Metal Panel Coating Line and Overhead Handling

Metal Panel Coating Line and Overhead Handling

See panel components and overhead handling inside a coating workshop.

2026-10-26 · 0:15 · YouTube
Powder Coating Conveyor for Industrial Components

Powder Coating Conveyor for Industrial Components

A closer look at coated components moving along an overhead conveyor.

2026-10-26 · 0:14 · YouTube
Overhead Conveyor Coating Line

Overhead Conveyor Coating Line

Follow workpieces along an overhead conveyor in a coating workshop.

2026-10-26 · 0:17 · YouTube
Industrial Component Coating Process

Industrial Component Coating Process

See industrial components move through a coating process, from workpiece handling to coated parts.

2026-10-26 · 0:14 · YouTube
Automated Spray Coating Line in Action

Automated Spray Coating Line in Action

Watch an automated spray coating line in operation, with workpieces moving through the spray area.

2026-10-26 · 0:10 · YouTube
Overhead Conveyor Coating Line for Electric Tricycles & EVs

Overhead Conveyor Coating Line for Electric Tricycles & EVs

See how an overhead conveyor coating line moves electric tricycle and EV parts through the treatment bath and coating process automatically, for consistent quality and less rework.

2026-10-07 · YouTube

Subscribe on YouTube

Questions about these videos

Can MUSI build a line like the ones in these videos for my parts?

Yes. Send your workpiece size, material, coating type (powder or liquid) and required output, and MUSI engineers reply with a line proposal and a preliminary quotation within 24 hours.

Request a Quote

Which MUSI equipment pages match these videos?

The videos show conveyor coating lines, spray booths and coated parts. Specifications and layouts are on these equipment pages:

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com