EN
GET IN TOUCH

Contact Us

Tell us about your project — we respond within 24 hours

Online Inquiry

GET IN TOUCH

Connect With MUSI

Whether you need a custom solution, want to schedule a factory visit, or require technical support — reach out through any of the channels below.

Contact Information

Our engineering team is ready to assist you

Phone

+86 181 5173 1332
Office hours: Mon-Sat 8:30-18:00 (Beijing Time)

WhatsApp / Mobile

+86 181 5173 1332
For instant messaging and quick replies

Email

Export Sales: lin@coating-spray.com

Working Hours

Mon-Sat 8:30-18:00 (Beijing Time)
Emergency support: 7×24 hotline available

Social Media

LinkedIn / YouTube / Facebook
Follow us for product updates and case studies

Online Inquiry

Fill out the form below — our engineers will respond within 24 hours.

Where is your project now? Pick one to see what to include.

  • Photos or a sketch of the part, and its material
  • Largest part size (L × W × H) and weight
  • Output you need, per hour or per shift
  • Country where the line will run

Our reply: a suitable line type and the questions to settle next.

  • The options you are weighing, such as manual vs automatic or powder vs liquid
  • Quotations or layouts you already have
  • Coating requirement: film thickness, corrosion class or salt-spray hours
  • Target budget and start date

Our reply: a line-by-line comparison of what each option includes and leaves out.

  • Part drawings and the part list with weights
  • Output, shifts per day and any fixed conveyor speed
  • Pretreatment, coating, curing and acceptance standards
  • Workshop layout, power, gas and compressed-air supply, and local emission limits

Our reply: a configuration, layout proposal and quotation.

Privacy Policy

Have drawings or photos of your workpiece? Email them to lin@coating-spray.com or send them on WhatsApp (+86 181 5173 1332), and mention your name and company so we can match them to this inquiry.

Your inquiry is sent directly to our engineering team. After you click Submit, this page reloads with a confirmation message, and we reply by email within 24 hours.

MUSI Technology — Changzhou, China

Industrial Park, Hutang Town, Wujin District, Changzhou City, Jiangsu Province, China

40 minutes from Changzhou Benniu Airport (CZX). 30 minutes from Changzhou Railway Station. Free pick-up available with prior arrangement.

VISIT US

How to Reach MUSI

We warmly welcome international visitors. Here's how to plan your trip.

By Air

Fly into Shanghai Pudong (PVG) or Shanghai Hongqiao (SHA) — 2 hours by car, or directly to Changzhou Benniu Airport (CZX) — 40 minutes by car.

By High-Speed Rail

From Shanghai or Beijing to Changzhou North Station via the Shanghai-Nanjing line. About 25 minutes from station to our facility.

By Car

Take the Shanghai-Nanjing Expressway (G42), exit at Changzhou. Parking available on-site.

VIP Reception

Book at least 1 day in advance. We arrange airport pick-up, hotel recommendations, and a tailored factory tour with engineer briefing.

Need a custom coating line for your factory?

Tell us about your workpieces and capacity requirements. Our engineers reply within 24 hours; a tailored configuration and quotation follow once your part data is complete.

Request a Quote