Sandblasting & Shot Peening Systems Overview
Sandblasting and shot peening are essential pretreatment processes for workpieces requiring superior coating adhesion. MUSI offers a complete range of blast cleaning equipment — from compact manual cabinets for small batches to large continuous shot blast lines for structural steel and heavy castings.
Our blast equipment features automatic media recovery and recycling, achieving 95%+ media reuse efficiency. Integrated dust collection ensures clean working environments and compliance with workplace air quality standards.
Models in This Category

Rotary Table Automatic Sandblasting Machine
Automated turntable sandblasting — workpieces rotate 360° for uniform media coverage on medium-sized castings, gear blanks and valve bodies.

Hook Type Shot Blast Machine
Workpieces hang from an overhead hook and rotate inside the blast chamber — ideal for fragile, hollow or odd-shaped components.

Tumble Belt Shot Blast Machine
Continuous tumbling belt for batch processing of small parts such as fasteners, springs, castings — high throughput with all-around exposure.

Roller Conveyor Shot Blast Line
Inline pass-through blast machine with roller conveyor — designed for steel plates, structural beams, and pipes in continuous production.

Manual Sandblasting Cabinet
Operator-controlled blast cabinet with viewing window and gloves — flexible solution for spot finishing, custom parts, and small batches.
Selection Considerations
Different models target different applications and capacities. Before purchasing, please consider:
- Workpiece characteristics — size, weight, geometry (flat / 3D), material (metal / plastic / wood)
- Coating type — powder / liquid / UV / 2K, etc.
- Capacity needs — shift output, cycle time, multi-color requirements
- Facility conditions — available area, ceiling height, electrical/gas supply, emission requirements
- Budget — balance of upfront investment and long-term running cost
MUSI engineers can run process simulations and ROI calculations based on your specifics. Contact us for a free proposal.