Cartridge Dust Collector
Compact cartridge filter unit with HEPA-grade media — ideal for fine particulate capture in tight floor space with low maintenance.
Best for fine powder, pharmaceutical and welding applications requiring high filtration efficiency.
Technical Specifications
The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.
| Air volume | 3,000-100,000 m³/h |
|---|---|
| Filter material | PTFE-coated polyester / nanofiber cartridge |
| Cartridge area | 10-25 m² per cartridge |
| Cleaning method | Pulse-jet online cleaning |
| Filtration efficiency | ≥99.99% (≥0.3µm particles) |
| Outlet emission | ≤5 mg/m³ |
| Cartridge service life | 2-3 years (typical) |
Product Features
- Application-Specific Design — optimized for compact dust collection for powder coating, welding, and laser cutting fumes, avoiding mismatched capacity or wrong sizing.
- Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment.
- Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
- Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
- Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.
Application References
This product has performed excellently in MUSI's customer installations. Selected references include:
- Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
- UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
- Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate
More references in our Case Studies section.
Service & Warranty
- Solution Design — free CAD line layout, process flow, and equipment list
- Warranty — 12 months full machine, 36 months on critical components
- Installation & Commissioning — engineers travel to your site for installation through production launch
- Operator Training — 3-5 days of free training for operators and maintenance technicians
- Response Time — 24-hour phone response, 72-hour on-site arrival (international)