Catalytic Oxidizer (RCO)
Noble metal catalysts oxidize VOCs to CO₂ and H₂O at 250-400 °C — significantly lower temperature and energy use compared to RTO incineration.
Best for medium airflow and medium concentration exhaust
Technical Specifications
The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.
| Air flow | 3,000 - 30,000 m³/h |
|---|---|
| VOCs DRE | ≥97% |
| Catalyst temperature | 250-400 °C |
| Catalyst type | Pt / Pd noble metal |
| Catalyst lifespan | 3-5 years |
| Heat recovery | ≥85% |
| Inlet concentration | 200-3,000 mg/m³ |
Product Features
- Application-Specific Design — optimized for Best for medium airflow and medium concentration exhaust, avoiding mismatched capacity or wrong sizing.
- Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment.
- Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
- Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
- Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.
Application References
This product has performed excellently in MUSI's customer installations. Selected references include:
- Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
- UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
- Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate
More references in our Case Studies section.
Service & Warranty
- Solution Design — free CAD line layout, process flow, and equipment list
- Warranty — 12 months full machine, 36 months on critical components
- Installation & Commissioning — engineers travel to your site for installation through production launch
- Operator Training — 3-5 days of free training for operators and maintenance technicians
- Response Time — 24-hour phone response, 72-hour on-site arrival (international)