Electroplating Wastewater: Chromium, Cyanide, Nickel (2026)

Provided by Lin Cong, Technical Director, MUSI Technology · Published November 28, 2026 · Last reviewed November 27, 2026

Quick answer: Electroplating wastewater is treated in three moves. First the streams are kept separate at source: chromium rinses, cyanide rinses, and general acid and alkaline rinses. Then each special stream gets its own reaction: hexavalent chromium is reduced to trivalent chromium at a pH below 2.5, and cyanide is oxidised in two alkaline chlorination stages. Finally all streams are combined, the metals are precipitated as hydroxides at a pH of about 8.5 to 11 depending on the metals, and the sludge is dewatered in a filter press. The limits the plant must meet are set by the local permit.

Why must plating wastewater streams be kept separate?

Because the first treatment step for each stream needs opposite conditions, and mixing them makes treatment fail or become dangerous. Chromium reduction needs acid; cyanide oxidation needs alkali; cyanide in contact with acid can release hydrogen cyanide gas; and complexing agents hold metals in solution. The European reference document for the sector lists the flows to separate: oils and greases, cyanide, nitrite, chromates, complexing agents and cadmium.

Stream Where it comes from First treatment step Then
Chromium rinses Chromium plating, chromic acid etching, chromate passivation Reduction of hexavalent to trivalent chromium in acid Joins the metals precipitation
Cyanide rinses Cyanide zinc, copper, silver and similar baths Two-stage alkaline chlorination Joins the metals precipitation
Acid and alkaline rinses Cleaning, pickling, acid zinc, nickel, acid copper, anodizing Neutralisation Hydroxide precipitation, settling, filtration
Complexed streams Electroless nickel and copper, some cleaners, baths with strong complexing agents Separate breaking or special precipitation Separate sludge or polishing

Segregation is built into the line: each rinse tank drains to the collection pipe for its stream, and the floor containment is divided the same way. The line itself is described on the electroplating line page.

How is hexavalent chromium treated?

Hexavalent chromium does not precipitate with a simple pH change, so it is first reduced to trivalent chromium and then precipitated as chromium hydroxide when the stream is neutralised. The reference document states that the reduction is made at pH values under 2.5 and that the most common reducing agent is sodium hydrogen sulphite (bisulphite).

The US EPA development document for the metal finishing rule describes a typical continuous system and the result it achieves.

Parameter Typical continuous system (US EPA development document)
pH, held with sulphuric acid 1.8 to 2.0
Oxidation-reduction potential (ORP), held by metering in gaseous sulphur dioxide 250 to 300 millivolts
Reaction tanks Two stirred tanks in series, 45 minutes retention each
Final hexavalent chromium concentration 0.05 mg/l, readily attained

Bisulphite in acid gives off sulphur dioxide, so the tank is ventilated.

How is cyanide destroyed?

Cyanide is oxidised with chlorine or sodium hypochlorite in two stages: first to cyanate at high pH, then from cyanate to carbon dioxide and nitrogen at a lower pH. Each stage of this alkaline chlorination has its own stirred tank with pH and ORP control.

Stage Reaction pH (EPA development document) ORP set point (EPA development document)
First stage Cyanide oxidised to cyanate 9.5 to 10, held with caustic soda 350 to 400 millivolts
Second stage Cyanate oxidised to carbon dioxide and nitrogen 8.0 600 millivolts

The European reference document gives a similar two-step sequence, with the second step after pH neutralisation at about pH 8.5; it names ammonium and carbonate as the end products. The first stage must stay strongly alkaline, because toxic gases can form if the pH falls during chlorination. Hypochlorite can form chlorinated organic compounds, measured as AOX, and cyanide bound to iron or nickel is harder to oxidise than free cyanide.

At what pH do nickel and mixed metals precipitate?

Most plating metals are removed by raising the pH so that they form insoluble hydroxides, then adding a flocculant and settling, within the published pH ranges below.

Document pH range Applies to
Reference document pH 9-11 Removal of transition metals by neutralisation and precipitation; the optimum pH is different for each metal
US EPA development document pH 8.5 to 9.5 Generally most effective for mixed metal finishing wastes

Two effects make the choice of pH a compromise. Cadmium, lead and nickel need a high pH to precipitate. Zinc, chromium, tin and aluminium are amphoteric, which means their hydroxides dissolve again if the pH goes too high. A plant with both nickel and zinc therefore either works at a controlled middle value and relies on co-precipitation, in which well-precipitating hydroxides carry down the others, or precipitates the two groups separately. Where limits are strict, fine filtration and a selective ion exchange polishing step follow the settler.

What happens to complexed metals?

Complexing agents such as cyanide, ammonia, citric and tartaric acid, EDTA and NTA keep metals dissolved at a pH where they would normally precipitate. These streams are kept away from the general stream and treated on their own. Options named in the reference document are reduction of the metal, precipitation as sulphide for hard complexes and weak-acid cation exchange resins for ammonia and amine complexes. Ion exchange does not work in solutions containing citrate, EDTA or NTA. The simplest measure is to choose process chemistry without strong complexing agents where the coating allows it.

How is the sludge dewatered and disposed of?

The settled hydroxide sludge is mostly water and is pumped to a filter press, which squeezes it into a solid cake; the reference document gives the cake solids below.

Sludge (according to the reference document) Cake solids
Metal hydroxide sludge, filter press working above 15 bar 15-35% solids
Sludge from anodizing Rarely rises above 25% solids

Plating sludge contains heavy metals and is classed as hazardous waste in most countries, so it goes to a licensed contractor for landfill or metal recovery. Lower drag-out and a drier cake both reduce the weight to be disposed of.

How much can rinse-water reduction cut the flow?

Counter-flow rinsing cuts the flow by a factor of about 14 to 1,000 against a single rinse at the same rinsing quality, depending on the rinsing ratio and the number of stages. In counter-flow (cascade) rinsing, fresh water enters the last rinse tank and flows towards the first, against the direction of the parts. The reference document gives the water needed per litre of solution dragged out:

Rinsing ratio required Single rinse Two stages Three stages Four stages
200 to 1 200 litres 14 litres 6 litres 4 litres
1,000 to 1 1,000 litres 32 litres 10 litres 6 litres
5,000 to 1 5,000 litres 71 litres 17 litres 8 litres
10,000 to 1 10,000 litres 100 litres 22 litres 10 litres

A worked example with assumed inputs shows how far counter-flow rinsing cuts the flow on a rack line.

Step Input / calculation Result
1 Treated area (assumed): rack line, contoured parts 19.2 m² per hour
2 Drag-out at the typical published 0.2 litres per m²: 19.2 x 0.2 3.84 litres per hour carried out
3 Rinsing ratio recommended by the reference document after electrolytic nickel 5,000 to 1
4 Single rinse: 3.84 x 5,000 19,200 litres per hour
5 Two counter-flow stages: 3.84 x 71 About 273 litres per hour
6 Three stages: 3.84 x 17 About 65 litres per hour

A static drag-out rinse before the flowing rinses collects concentrated solution that can be returned to a heated bath to replace evaporation losses. Longer drain times and spray rinsing over the tank reduce the drag-out itself. How the rinse flow feeds into plant size is covered in the guide to what drives the budget of an electroplating line, and the difference in drag-out between line types in rack vs barrel plating line.

When are ion exchange, reverse osmosis and evaporators used?

They are used when water is to be reused, when a valuable or strictly limited metal is to be recovered, or when the permit allows little or no discharge.

Technique What it does Where it is used Limits
Ion exchange Resins take metal ions from rinse water and release them as a concentrate on regeneration Recirculating rinse water, polishing treated effluent, recovering precious metals Regeneration chemicals and eluates to treat; not suitable with strong complexing agents
Reverse osmosis A membrane at high pressure separates clean water from a concentrate Rinse-water reuse, concentrating drag-out for return to the bath Solids and organics must be removed first; energy for pressure
Evaporator Removes water from a bath or concentrate, atmospheric or under vacuum Closing the loop on a heated bath, final concentration for zero liquid discharge High energy demand; impurities concentrate with the product

The reference document is cautious about zero liquid discharge for a whole installation: it generally involves high power consumption, can produce wastes that are difficult to dispose of, and is used in isolated cases.

What discharge limits apply to electroplating wastewater?

The local permit decides. The table quotes two published references: the US federal pretreatment standards for existing metal finishing sources discharging to a public sewer, and the emission ranges reported in the European reference document for plants using best available techniques.

Parameter US 40 CFR 433.15, maximum for any one day (mg/l) US 40 CFR 433.15, monthly average (mg/l) EU STM BREF Table 5.2, range (mg/l)
Chromium, total 2.77 1.71 0.1-2.0
Chromium, hexavalent Not listed separately Not listed separately 0.1-0.2
Nickel 3.98 2.38 0.2-2.0
Copper 3.38 2.07 0.2-2.0
Zinc 2.61 1.48 0.2-2.0
Cadmium 0.69 0.26 0.1-0.2
Lead 0.69 0.43 0.05-0.5
Silver 0.43 0.24 0.1-0.5
Cyanide 1.20 total 0.65 total 0.01-0.2 free

The two columns are not directly comparable, and national and local limits can be stricter than either.

Point Detail
US figures Legal limits in a federal rule
Excluded from this table Existing job shops and independent printed circuit board manufacturers, which fall under 40 CFR Part 413
Lower cadmium limit for new sources (US) 0.11 mg/l daily and 0.07 mg/l monthly
European figures Ranges achieved by a group of installations, for daily composites taken before any dilution; the lowest values may not all be met at the same time

How are acid fumes from the plating line treated?

Tanks that give off acid mist, chromic acid aerosol, cyanide or nitrous fumes are fitted with edge extraction, and the extracted air passes through a droplet separator or a wet scrubber before the stack. In a packed-bed scrubber the air rises through packing while water or an alkaline solution is sprayed from above. Chromium and cyanide air streams are ducted and scrubbed separately, and the scrubber water goes to the matching wastewater stream. A scrubber for plating duty is built in acid-resistant plastics and is described on the acid fume scrubber page.

What does MUSI need to size the treatment plant?

MUSI Technology, in Changzhou, China, supplies the wastewater treatment and acid-fume scrubbing together with its rack, barrel and anodizing lines. Sizing needs the list of baths, the treated area or weight per hour, the number of rinse stages, the discharge permit and whether water is to be reused. The treatment equipment is described on the electroplating wastewater treatment system page.

Which line type, coating standard and environmental equipment fit each part family is set out on the Electroplating & Anodizing Plants page.

To have a treatment scheme prepared for your line, send your part data, process list and discharge limits.

Frequently asked questions

Why can chromium and cyanide wastewater not be mixed?

Chromium reduction needs acid conditions, at a pH below 2.5, while cyanide oxidation needs alkaline conditions. Cyanide that meets acid can release hydrogen cyanide gas. The two streams are therefore collected in separate pipes and treated separately before they join the general metals precipitation.

How is hexavalent chromium removed from plating wastewater?

It is reduced to trivalent chromium, most commonly with sodium bisulphite at a pH below 2.5, and then precipitated as chromium hydroxide when the water is neutralised. A typical system described by the US EPA holds pH 1.8 to 2.0 and an ORP of 250 to 300 millivolts in two reaction tanks.

What is two-stage alkaline chlorination?

It is the usual method of destroying cyanide. In the first stage chlorine or hypochlorite oxidises cyanide to cyanate at pH 9.5 to 10. In the second stage cyanate is oxidised to carbon dioxide and nitrogen at about pH 8.0 to 8.5. Each stage is controlled by pH and ORP.

At what pH does nickel precipitate?

Nickel needs a high pH to precipitate as hydroxide. The European reference document gives pH 9-11 for hydroxide precipitation of transition metals and notes that the optimum is different for each metal. Zinc and chromium can redissolve at high pH, so mixed streams are run at a compromise value or precipitated separately.

What discharge limits apply to an electroplating plant?

The local permit decides. As published references, the US federal standard 40 CFR 433.15 sets daily maximums of 2.77 mg/l total chromium, 3.98 mg/l nickel and 1.20 mg/l total cyanide for existing sources, and the European reference document reports ranges of 0.1-2.0 mg/l total chromium and 0.2-2.0 mg/l nickel.

About the figures in this guide. Treatment conditions, rinsing tables, drag-out values, sludge solids and European emission ranges are taken from the European Commission reference document on best available techniques for the surface treatment of metals and plastics (2006). US limits are quoted from 40 CFR Part 433 as published in the electronic Code of Federal Regulations, and the pH and ORP set points from the US EPA development document for the metal finishing category (1983). They are published reference values, not guarantees and not a statement of the limits that apply to any particular site. The rinse example uses assumed inputs to show the calculation. Final values are set for each project from the part, the specified coating and the local discharge limits.

Need a quotation for your line?
Send us your part size, throughput and coating type — our engineers reply within 24 hours, and a layout and budget follow once your part data is complete. Contact MUSI Technology or browse our equipment range.

Related technical guides

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our paint wastewater treatment cost guide; a configured quotation is prepared from your part data.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com