Industry Overview

Premium coating solutions for refrigerators, washing machines, air conditioners, and kitchen appliances — meeting strict appearance and durability standards.

Home Appliance Coating

Typical Workpieces

MUSI has served the Home Appliances industry with workpieces including:

  • Refrigerator panels
  • Washing machine shells
  • AC panels
  • Kitchen appliance doors
  • Microwave cavities
  • Water heater shells
  • Range hood housings
  • Rice cooker shells

Industry Coating Challenges

Each industry faces unique coating challenges. MUSI's solutions are designed to address these pain points directly:

High Visual Standards

Appliance exteriors are highly visible — strict requirements on color, smoothness, anti-fingerprint, etc.

Salt Spray Tests

Kitchen and laundry appliances used in humid environments must pass 480-1,000 hour salt spray tests.

Large & Complex Shapes

Refrigerator side panels and washing machine shells are large with deep-drawn and recessed structures.

Tight Supply Chain

Appliance OEMs enforce strict QC — suppliers must hold IATF/ISO and other certifications.

MUSI's Targeted Solutions

To address these challenges, MUSI provides industry-specific coating solutions:

1. Floor Belt Conveyor Spray Lines

Optimal for high-quality coating of large flat parts — belt widths up to 2,500 mm, load capacity up to 500 kg per station.

2. Electrostatic Powder Coating

Coating hardness 2H-3H with excellent mechanical properties — passes 1,000+ hours of salt spray.

3. Auto Inspection & Unload

Inline color and film thickness measurement; automatic rejection of non-conforming parts.

4. Standardized QC Documentation

Complete SOPs from pretreatment to finished part inspection — supports your appliance OEM audits.

Recommended Equipment

Typical projects in this industry use the following MUSI products in combination — exact selection depends on workpiece specifics:

Which home appliance projects has MUSI delivered?

MUSI Technology, a coating line manufacturer in Changzhou, China, builds powder and liquid coating lines for appliance sheet-metal parts, with pretreatment and exhaust treatment in the same scope.

ProjectLinePublished figures
Mexico, range hood housings and sterilizer doors (2024)Floor-belt powder coating line, 6-stage pretreatment, 8 guns; installed on site by MUSI engineersParts up to 1,500 × 800 × 600 mm and 30 kg; 80 parts per hour
Indonesia, kitchen appliancesExhaust treatment, not a coating line: zeolite rotor + three-chamber RTO for the exhaust of five spray lines30,000 m³/h

Featured Case Studies

Selected projects MUSI has delivered for clients in this industry. More projects in our Case Studies section:

Project References

Schedule a Consultation

The optimal solution depends on your specific workpieces, capacity, facility, and budget. MUSI provides a free consultation service including:

  • 1-on-1 process consultation with our engineers
  • Preliminary CAD line layout
  • Equipment list and preliminary quotation
  • Reference cases from similar industries
  • Welcome to visit MUSI's factory in Changzhou

Schedule Consultation