Power Tool Housing Coating Solution
CASE STUDY · 2024

Power Tool Housing Coating Solution

  • IndustryHome Appliances
  • Year2024
  • LocationSouth Africa
  • Scale60 m line, 3 million pcs/year
Power ToolsPlastic PartsHigh-Speed
Request Similar Solution Back to Cases

Project Background

The client is an OEM supplier for known power tool brands in South Africa, producing drill and grinder housings. Their existing manual coating lacked capacity and consistency.

The Challenge

Power tool housings are plastic parts that don't tolerate high heat (≤80 °C). Annual capacity 3 million means very fast cycle time (6 sec/piece in 2 shifts).

MUSI's Solution

MUSI designed a UV coating solution: reciprocator UV paint spray → IR pre-heat (only 50 °C) → UV lamp combination cure (10-second cure). 6-sec cycle without damaging plastic parts.

Equipment Configuration

Line typeOverhead chain UV coating line
SprayVertical reciprocator
CuringUV LED + mercury combination
Curing time10 seconds
Cycle time6 sec/piece
Substrate temperature≤50 °C (no plastic damage)
Film glossHigh gloss (≥85 GU)
Annual capacity3 million pcs (2 shifts)

Implementation

80-day delivery. UV paint compatibility with plastic substrates was a new challenge — MUSI worked with paint suppliers on 30+ UV paint trials before settling on the optimal formula.

Results

New line achieved expected 3.2 million pcs/year capacity. Visual pass rate 99.2%. The client won global orders for Bosch, Stanley, and other brands.

Client Feedback

"UV coating was a new attempt for the power tool industry. MUSI's solution combines speed and quality — putting us at the industry forefront."
— Project Manager, Client Side

Get a Similar Solution

If your industry and requirements match this case, contact MUSI to schedule a free consultation. We'll design an optimal solution based on your specific workpieces, capacity, and facility.