Modular Combined Spray Line
MODULAR SPRAY LINE

Modular Combined Spray Line

Standardized modular design — pretreatment, spraying, curing, and cooling modules combine flexibly, enabling capacity expansion and process upgrades over time.

Best for SMEs starting up — install small line first, expand later as needed

Request Quote Call Us

Technical Specifications

The table below shows standard specifications. For custom requirements (non-standard size, specific heating method, robot integration, etc.), please contact MUSI engineers to confirm.

Capacity flexibility5,000 - 50,000 pcs/shift adjustable
Module mixPretreatment + spray + cure + cooling + unload
ExpansionStandard interfaces, 30-day add-on possible
Footprint200 - 800 m²
Initial investment$80K - $400K USD (configuration-dependent)
Lead timeStandard 45 days
Operators1-3 personnel

Product Features

  • Application-Specific Design — optimized for Best for SMEs starting up — install small line first, avoiding mismatched capacity or wrong sizing.
  • Stable Operation — core components from imported or top-tier domestic brands (Siemens PLC, ABB drives, SEW motors). 100% factory testing pre-shipment.
  • Energy & Environment — heat recovery, VFD drives, and intelligent shutdown deliver 20%-30% energy savings versus conventional equipment.
  • Easy to Operate & Maintain — user-friendly HMI, standardized fault codes, and routine maintenance manageable by your in-house technicians.
  • Line Integration — seamlessly integrates with MUSI's pretreatment, curing, and environmental equipment for a complete production line.

Application References

This product has performed excellently in MUSI's customer installations. Selected references include:

  • Vietnam — Tier-1 automotive parts supplier: 600,000 pcs/year coating line, 4+ years stable operation with no major faults
  • UAE — Aluminum profile manufacturer: Replaced imported equipment, reduced energy use by 28%, saving ~$85K USD per year
  • Mexico — Hardware exporter: Two-shift operation, daily output up from 5,000 to 12,000 pcs, 99.5%+ film quality pass rate

More references in our Case Studies section.

Service & Warranty

  • Solution Design — free CAD line layout, process flow, and equipment list
  • Warranty — 12 months full machine, 36 months on critical components
  • Installation & Commissioning — engineers travel to your site for installation through production launch
  • Operator Training — 3-5 days of free training for operators and maintenance technicians
  • Response Time — 24-hour phone response, 72-hour on-site arrival (international)

Frequently Asked Questions

QWhat is the standard delivery lead time?
Standard models ship within 45 days from contract signing and down payment. Custom projects 60-75 days. Specifics confirmed in contract.
QHow do I choose between gas and electric heating?
Where natural gas is reliably available at competitive cost, gas heating typically reduces operating costs by 35%-50% compared to electric heating for continuous operation. Electric heating's advantages: zero local emissions, easy maintenance, lower upfront cost. The choice depends on your local energy prices and emission requirements.
QCan I visit MUSI's factory to see this equipment?
Absolutely. International visitors are warmly welcome at our Changzhou factory. We can show in-process equipment and videos of running customer installations. Book at least 1 day in advance — we provide pickup and engineer-led tours.