Automatic spray painting line
CASE STUDY · 2026

Case Study: 1,320 mm Panel Spray Coating Line, India

  • ClientWoodworking machinery integrator
  • IndustryFurniture
  • Year2026
  • LocationIndia
  • Scale1,320 mm working width
PanelsFurnitureExport
Request Similar Solution Back to Cases

Summary

A 1,320 mm working-width spray coating line with standard accessories for a Bengaluru integrator of woodworking machinery that supplies furniture and panel manufacturers with solid-wood and panel lines, sanding machines and CNC routers. Panels up to 1,320 mm wide pass through automatic spraying and on to drying in one flow, ready to be combined with the integrator's sanding and processing equipment. The line was shipped from China in February 2026.

Project Background

The client, based in Bengaluru, supplies and integrates woodworking machinery for furniture and panel manufacturers — solid-wood and panel lines, sanding machines and CNC routers — with installation and after-sales support. MUSI supplied a 1,320 mm spray coating production line with standard accessories, shipped from China in February 2026.

The Challenge

Furniture panels need an even, smooth finish across their full width, and panel makers expect a line that is easy to run and maintain. The equipment also has to fit into a complete panel-processing line supplied by the integrator.

MUSI's Solution

MUSI supplied a spray coating line with a 1,320 mm working width, so panels up to that width pass through automatic spraying and on to drying in one flow, ready to be combined with the integrator’s sanding and processing equipment.

Paint booth exterior with viewing windows
Paint booth exterior with viewing windows

Equipment Scope

  • Automatic spray section, 1,320 mm working width
  • Panel conveying
  • Drying section
  • Standard accessories

Video: a similar panel coating line

Metal panel hanging from an overhead conveyor in a coating workshop
Metal Panel Coating Line and Overhead HandlingWatch on YouTube

This short video, filmed on a similar line, shows a metal panel hanging from an overhead conveyor in a coating workshop. Watch it here or on the MUSI Technology YouTube channel.

VideoLengthWhat it shows
Metal Panel Coating Line and Overhead Handling15 sPanel components and overhead handling inside a coating workshop.

Send your part sizes and output for a line proposal

Results

The line was shipped in February 2026 for the integrator’s furniture and panel customers in India.

Selection logic: why this configuration

A flat-line panel sprayer with a fixed 1,320 mm working width was chosen over a hanging line because furniture panels are flat and must be coated on one face at a time with a smooth, even film across the full width. The line was supplied with standard accessories so the integrator can combine it with its own sanding and handling equipment.

Scope of supply and key components

ItemSpecificationNotes
Automatic spray section1,320 mm working width
Panel conveying
Drying section
Standard accessories

Key components

Key components are available from international brands, configurable per customer specification, so that spare parts can be sourced locally over the life of the line. Brand names below are the usual options for this type of equipment; the brands actually fitted are fixed in the contract specification.

ComponentBrands available on request
Automatic liquid guns, pumps and 2K proportionersInternational tier-one spray gun, pump and 2K proportioner brands
PLC and HMISiemens SIMATIC S7-1500, Mitsubishi Electric MELSEC iQ-R, Schneider Electric Modicon, OMRON NX, Rockwell Automation Allen-Bradley
Variable-frequency drivesABB ACS580, Siemens SINAMICS G120, Danfoss VLT, Schneider Electric Altivar, Yaskawa, Mitsubishi Electric
Conveyor gear motorsSEW-EURODRIVE, NORD DRIVESYSTEMS, Bonfiglioli, Siemens, Sumitomo Drive Technologies
Booth ceiling and intake filter mediaFreudenberg Viledon, AAF SureStop, Camfil, MANN+HUMMEL
Sensors and temperature controllersSICK, Pepperl+Fuchs, OMRON E5CC, Honeywell UDC, Yokogawa UT, ifm, KEYENCE
Compressed air for powder feed and instrumentsAtlas Copco GA, Ingersoll Rand RS, KAESER ASD, Sullair

Not included in the scope of supply

  • Civil works, foundations and pits
  • Building services up to the battery limit: power supply, gas, compressed air, water and drainage
  • Local permits, emission approvals and third-party inspections
  • Paint or powder supply, unless stated in the contract
  • Installation labour and site utilities at the end customer's plant

Services included with every line: engineering design, manufacturing, shipping documentation, installation supervision, commissioning, operator training, warranty and spare parts.

Typical programme

The durations below are typical for equipment of this class and are given for planning; they are not the recorded schedule of this project. A complete line usually runs 90–180 days from contract to acceptance, a single unit 30–60 days.

StageTypical durationWhat happens
Site survey and workpiece review5–10 daysRemote review of drawings and photos, or an engineer visit
Layout and detail design15–30 daysLayout drawing, utilities list and specification sign-off
Manufacturing45–90 daysBooths, ovens, conveyor, pretreatment and controls built and pre-assembled at the works
Shipping20–45 daysSea freight; equipment shipped in sections for on-site assembly
Installation15–40 daysMUSI supervision with the client's installation crew or MUSI crew
Commissioning, training and acceptance7–15 daysTrial runs on the client's parts, operator training, acceptance record

Applicability and limits

The line coats flat panels up to 1,320 mm wide; wider panels or three-dimensional furniture parts need a different machine. Shipment date is from the shipping records; production figures have not been published.

Results shown in this case study reflect the stated operating conditions and should not be interpreted as guaranteed performance under different feed, production, environmental, or site conditions.

After-sales and spare parts

Warranty on a MUSI coating line runs from acceptance: 12 months on the complete line excluding consumables, 36 months on critical components such as motors, drives and the PLC, and 60 months on structural parts such as steel structure, ducting and oven bodies. Failures within warranty, excluding misuse, are repaired free of charge.

Support starts remotely: the service line is staffed around the clock, a preliminary diagnosis with recommendations is given within 2 hours, and where a site visit is needed an engineer reaches any major city within 72 hours. A spare-parts inventory is held at the Changzhou headquarters with same-day shipping, and customers can keep a dedicated parts stock at MUSI for emergencies. Details are on the after-sales service page.

FAQ

What panel width does the line take? Up to 1,320 mm working width, with the panel passing under automatic spraying and on to drying in one flow.

Can it be combined with sanding equipment? Yes; the line was supplied to a woodworking machinery integrator to combine with its sanding and processing lines.

What coatings can be applied? Liquid furniture coatings suited to flat-line spraying; the drying section is set to the coating supplier's data.

What was delivered? The 1,320 mm spray coating line with standard accessories, shipped in February 2026.

Who is the end user? Furniture and panel manufacturers in India served by the integrator.

Next step: a configuration proposal for a similar line

If your parts, volumes or plant conditions are close to this project, MUSI can return a line configuration and layout proposal. To prepare it we need four things:

  • Photos and dimensions of the workpieces, with weight and material
  • Required output (pieces per hour or per day, and shifts)
  • Number of colours and how often colour changes are needed
  • Available floor space and ceiling height, with the utilities on site

Message us on WhatsApp with these details, or use the quotation form.

Published 2026-09-26 · Updated 2026-09-30 · Last technical review: 2026-09-30

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our complete coating line cost guide; a configured quotation is prepared from your part data. Published indicative ex-works ranges: a complete powder coating line is roughly USD 75,000–230,000 semi-automatic, USD 200,000–600,000 for a standard automatic line and USD 600,000–2,000,000 for a high-throughput automated plant.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com

Get a Similar Solution

If your industry and requirements match this case, contact MUSI to schedule a free consultation. We'll design an optimal solution based on your specific workpieces, capacity, and facility.

Provided by Lin Cong, Technical Director, MUSI Technology