Fisheyes and Craters in Powder Coating: Causes and Fixes
Quick answer: Craters and fish eyes in powder coating are round depressions formed when the molten film retreats from a low surface tension contaminant; a fisheye is a crater open to bare metal. Silicone is the classic cause and acts at concentrations as low as 0.001 %, while an incompatible powder such as acrylic can crater a batch at about 0.1 %. Oil carried over in compressed air is the most common source. Spray gun makers publish limits such as 0.1 mg/m³ oil vapour and a dew point below 10 °C. The cure is to isolate the source step by step, then clean and segregate.
MUSI Technology, a powder and liquid spray coating line manufacturer in Changzhou, China, designs powder lines with compressed air treatment specified to the gun maker’s limits, booths and recovery systems that open fully for clean-down, conveyor lubrication kept away from open product and pretreatment stages with controlled final rinse quality.

What do fisheyes and craters look like in powder coating?
Craters in powder coating are round depressions where the molten film has pulled away from a point, and fish eyes in powder coating are the severe form in which the film withdraws completely and leaves bare metal at the centre. Both are wetting failures. They differ from pinholes, which are gas pores tied to porous substrates and thick film, and are covered in the powder coating defects overview.
| Feature | Craters | Fisheyes | Pinholes |
|---|---|---|---|
| Shape | Circular depression | Circular depression open to the substrate | Very small pore |
| Film at the centre | Thin film remains | None, bare metal visible | Open channel through the film |
| Distribution | Random, often denser on horizontal faces | Random, follows the contaminant | Follows castings, galvanized faces, thick film |
| Mechanism | Low surface tension contaminant | Same, heavier contamination | Gas or vapour leaving the part during cure |
What causes craters and fish eyes in powder coating?
Powder coating craters are caused by a contaminant whose surface tension is far lower than that of the molten powder. Silicone-based materials measure about 15-20 dynes/cm against about 40-50 dynes/cm for powder coatings, so the melt retreats from every contaminated spot. Silicone contamination in powder coating is damaging at concentrations as low as 0.001 %, and an incompatible powder can crater a batch at about 0.1 %. The Powder Coating Institute names unclean compressed air as the most prominent cause.
| Source of contamination | How to confirm | Fix |
|---|---|---|
| Oil or water in compressed air | Blow air through a clean white cloth at the gun; open filter drains | Service dryer, replace coalescing elements, drain receivers |
| Silicone sprays, sealants, lubricants, mould release | Audit maintenance stores and nearby processes; defect appears plant-wide | Remove silicone products from the building; clean air handling, booth and guns |
| Hand creams, antiperspirants, cosmetics | Defect follows one operator or manual touch-up areas | Clean gloves, no personal care products at the booth |
| Forming oil, rust preventative or grease left by pretreatment | Water-break test after final rinse; craters follow part geometry | Correct cleaner concentration, temperature and rinse quality |
| Incompatible powder (acrylic or silicone high-heat grades in polyester, epoxy or hybrid; different suppliers) | Spray virgin powder from a clean box unit on a clean panel | Dedicated hoses, pumps and hoppers; full clean-down before changeover |
| Conveyor chain lubricant drip | Craters on top faces under the track | Drip trays, correct lubricant dose, clean chain |
| Contaminated reclaim powder | Defect stops with reclaim by-passed | Discard reclaim, clean cyclone, sieve and filters |
| Oven condensate | Defect appears only after cure, heaviest near exhaust or roof | Clean oven, increase exhaust air |
What compressed air quality does powder coating need?
Powder coating needs compressed air that is dry and practically oil-free at the point of use, and gun makers state this as limit values in their manuals, not as a single ISO 8573-1 class. A published gun-maker oil limit of 0.1 mg/m³ equals the ISO 8573-1 class 2 limit for total oil. A published powder-system dryer dew point range reaches up to about the class 4 level of +3 °C.
| Published requirement | Water | Oil | Particles |
|---|---|---|---|
| Manual powder gun unit, international tier-one brand | 1.3 g/m³ water vapour maximum | 0.1 mg/m³ oil vapour maximum | Not stated in the data used here |
| Manual powder system with dense-phase pump, international tier-one brand | Dew point below 10 °C | Not stated in the data used here | Below 5 µm |
| Compressed-air dryer for powder systems, international tier-one brand | Pressure dew point -6.7 to 3.4 °C or lower at 6.89 bar | 0.1 ppm oil vapour or aerosol maximum | 99 % removal above 0.3 µm |
| ISO 8573-1 class 2 | -40 °C pressure dew point | 0.1 mg/m³ total oil | Class table in the standard |
| ISO 8573-1 class 4 | +3 °C pressure dew point | 5 mg/m³ total oil | Class table in the standard |
The Powder Coating Institute describes the basic treatment train as an air cooler followed by two-stage filtration: a 5 µm filter and a coalescing filter. The limit that applies to a given line is the one in the manual of the installed guns and pumps.
How do you find the source of fisheyes step by step?
The source is found by removing one possible contaminant at a time and spraying a test panel after each change. Start with clean powder on a clean panel, then add the line back in stages.
| Step | Test | Result and meaning |
|---|---|---|
| 1 | Solvent-wipe a steel panel, spray virgin powder from a clean box unit, cure in a laboratory or separate oven | Craters: powder lot or compressed air. Clean: go on |
| 2 | Repeat step 1 using a different compressed air source or after new filter elements | Craters gone: compressed air was the source |
| 3 | Spray virgin powder through the production booth with reclaim by-passed | Craters return: booth, hoses or pumps hold contamination |
| 4 | Switch reclaim back on | Craters return: reclaim powder is contaminated |
| 5 | Run a pretreated production part instead of the wiped panel | Craters return: pretreatment is leaving oil or rinse residue |
| 6 | Hang panels on the conveyor through the full line, uncoated zones included | Craters on top faces: chain lubricant or airborne fallout |
| 7 | Cure identical panels in the production oven and a clean oven | Craters only from the production oven: oven condensate |
Powder compatibility can be tested in advance by spiking the production powder with 0.1 % of the suspect powder and curing a panel.
Which equipment and line settings prevent fisheyes in powder coat?
Fisheyes in powder coat are prevented by four equipment measures: compressed air treatment sized for the booth, a booth that can be cleaned completely, separate powder paths for incompatible chemistries, and pretreatment that delivers a water-break-free surface. Air treatment means an aftercooler, a refrigerant or desiccant dryer and coalescing filtration close to the booth. Recirculated deionised water in the final rinse with a fresh deionised mist reduces rinse residue. Key components are available from international brands such as Atlas Copco, Kaeser and Parker domnick hunter for dryers and coalescing filters, international tier-one spray gun brands for guns and powder pumps, and Henkel Bonderite and Chemetall (BASF) for pretreatment chemistry (configurable per customer specification). Booth design for clean-down is covered in the quick colour change booth article, and cleaner and conversion stages in the pretreatment comparison.
| Area | Prevention check |
|---|---|
| Compressed air | Dew point and filter differential pressure logged; drains tested; elements changed on schedule |
| Plant rules | No silicone sprays, sealants or polishes on site; maintenance lubricants approved before use |
| Operators | Clean lint-free gloves; no hand cream or aerosol products near the booth |
| Powder handling | Boxes kept closed; acrylic and high-heat silicone powders on dedicated equipment; hoses replaced after a contamination event |
| Reclaim | Cyclone, sieve and recovery filters cleaned at every chemistry change |
| Conveyor | Lubricant dosed away from the booth and oven entry; drip trays over open product |
| Pretreatment | Bath titrations on schedule; final rinse conductivity monitored |
| Oven | Walls, roof and ducts cleaned of condensate; exhaust flow verified |
FAQ
What is the difference between a crater and a fisheye in powder coating? A crater is a round depression in which a thin film still covers the substrate. A fisheye is the severe form: the molten powder has withdrawn completely and bare metal shows at the centre. Both come from low surface tension contamination.
How much silicone does it take to cause craters? Very little. PCI Magazine reports that silicone-based products at concentrations as low as 0.001 % can cause widespread cratering, because their surface tension of about 15-20 dynes/cm is far below the 40-50 dynes/cm typical of powder coatings.
Can mixing two powders cause fish eyes? Yes. Acrylic and high-heat silicone powders are the usual offenders when they contaminate polyester, epoxy or hybrid powders, and about 0.1 % can be enough. Powders from different suppliers can also be incompatible, so equipment is dedicated or fully cleaned between them.
How do I know whether compressed air is causing powder coating fish eyes? Spray virgin powder on a solvent-wiped panel using the production air, then repeat with a different air source or new filter elements. If the craters disappear, the air was the source. Check the dryer, coalescing filter elements and drains.
Where MUSI Technology fits
MUSI Technology supplies complete powder lines in which air treatment, booth, recovery, conveyor and pretreatment are specified together, so contamination paths are closed at the design stage. See the electrostatic powder coating booth and the powder coating line guide for the equipment scope.
Provided by Lin Cong, Technical Director, MUSI Technology
Related equipment: Powder Coating Systems
Send us your part size, throughput and coating type — our engineers reply within 24 hours, and a layout and budget follow once your part data is complete. Contact MUSI Technology or browse our equipment range.
Related technical guides
- Shot Blasting vs Sandblasting: Which to Choose
Shot blasting throws abrasive mechanically with wheels; sandblasting propels it with compressed air. Compared on throughput, energy cost per m2, surface. - Coating Line Layout: Floor Space You Need
A semi-automatic powder line needs 200-400 m2; a standard automatic line 600-1,200 m2. Layout rules, U-shape versus straight-through, ceiling height,. - Water-Based vs Solvent-Based Coating: Line Changes
Switching from solvent to water-based coating changes booth humidity control, flash-off length, material handling and VOC treatment. - Powder Coating Line: Types, Specs & Cost (2026)
A powder coating line pretreats, coats and cures metal parts on a conveyor. Full guide to line types, key specifications and 2026 price ranges. - Powder Coating Line Max Part Size: Booth, Oven, Conveyor
How big a part can a powder coating line handle? Hanger load, booth and oven openings, part length and heat-up of thick steel, with MUSI part sizes.
QQuestions buyers ask before ordering
quotation · price · lead time · installation · warranty
What information do you need to prepare a quotation?
Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.
How much does this equipment cost?
Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our powder coating line guide (indicative ex-works budgets from USD 75,000 to 2,000,000); a configured quotation is prepared from your part data.
What is the lead time?
Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.
Do you install and train operators overseas?
Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.
What warranty and after-sales support are included?
12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.
Can the environmental equipment be supplied with the line?
Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.