Case Study: Container & Energy-Storage Box Painting Line, Taicang

Container PlantContainer PaintingEnergy Storage
Request Similar Solution Back to Cases

Summary

A spray painting line for the Taicang base of a major container group in Suzhou, painting standard ISO containers, special containers and energy-storage enclosures on the same equipment. Booths are sized for full container bodies with automatic spraying of the large flat faces and drying after each coat, laid out in the production hall so boxes move straight from fabrication into painting; exhaust ducting and VOC treatment are included. The page's reference configuration shows a current 20-ft energy-storage box line design. The line is in production at Taicang in 2026.

Project Background

The client’s Taicang base in Suzhou, part of a major container group, builds standard ISO containers, special containers and energy-storage systems. MUSI supplied a container spray painting line to the Taicang operation.

The group supplies ocean carriers and container leasing companies, Evergreen Marine among them, and its plants also build energy-storage systems for battery makers and integrators.

The Challenge

The plant builds more than one kind of box. The line had to paint standard containers and energy-storage enclosures on the same equipment, with a finish that holds up outdoors for the service life of the box.

MUSI's Solution

MUSI supplied a spray painting line with booths sized for full container bodies, automatic spraying for the large flat faces and drying after each coat, laid out in the production hall so boxes move straight from fabrication into painting.

Finished coated container bodies
Finished coated container bodies

Equipment Scope

  • Container-scale spray booths
  • Automatic spraying for large faces
  • Drying and forced cooling
  • Transfer system between stations
  • Exhaust ducting and VOC treatment

Reference Configuration: 20-ft Energy-Storage Box Line

The figures below come from a current 20-ft energy-storage box line design. They show how a line of this type is typically configured; each plant’s line is sized to its own product mix and output.

Workpiece20-ft box, 6,058 × 2,438 × 2,591 mm, up to 2,500 kg
ConveyorBox-pulling chain (32A roller chain), approx. 280 m
Surface preparationAutomatic shot blasting room (10 × 6.6 × 5 m) with servo reciprocators on both sides and top; cleaning room with automatic blow-off; abrasive recovery and cartridge dust collector
Liquid paint boothsPrimer, intermediate and topcoat booths, 10 × 6.6 × 5.2 m, reciprocators on both sides, top and bottom; interior-cavity primer applied by robot
RobotsYaskawa 7-axis explosion-proof, 15 kg payload, 2,700 mm reach, on travel rails
Paint supplyGraco high-pressure airless automatic guns; 2K automatic mixing for primer, intermediate and topcoat
Powder boothAutomatic, 9.8 × 4.9 × 4.2 m; cyclone and cartridge recovery; explosion isolation valves and flameless venting
OvensPaint drying 80–120 °C; powder curing 200–220 °C; direct natural-gas heating (280,000 and 440,000 kcal/h burners); forced cooling after each oven
Quality checkRain test chamber, 10 × 6 × 5 m
VOC treatment160,000 m³/h dry filtration + activated carbon adsorption + catalytic combustion
OutputReference layout: 20 boxes per 12 hours. MUSI’s fastest energy-storage box lines release one finished box per minute.

Results

The line is in production at the Taicang plant, painting container and energy-storage box bodies.

Selection logic: why this configuration

One line for both standard containers and energy-storage enclosures was chosen over two lines because both are 20-ft or 40-ft steel boxes that share pretreatment, primer and drying, and the enclosure's extra coats and openings are handled by recipe rather than by separate equipment. The layout follows the fabrication flow so boxes are not transported across the hall between welding and painting.

Scope of supply and key components

ItemSpecificationNotes
Spray boothsContainer-scale, automatic spraying for large faces
DryingDrying rooms with forced cooling
Transfer systemBetween stations
Exhaust and VOC treatmentDucting and treatment

Key components

Key components are available from international brands, configurable per customer specification, so that spare parts can be sourced locally over the life of the line. Brand names below are the usual options for this type of equipment; the brands actually fitted are fixed in the contract specification.

ComponentBrands available on request
Automatic liquid guns, pumps and 2K proportionersGraco ProMix 2KS, Sames Airmix, WAGNER AirCoat, Nordson, Binks (Carlisle Fluid Technologies)
Painting robotsABB IRB 5500, FANUC P-350iA, Yaskawa MOTOMAN MPX series, KUKA, Kawasaki
Oven and dryer gas burnersRiello RS series, Weishaupt monarch WM-G, Baltur TBG, Honeywell Maxon OVENPAK, Eclipse
PLC and HMISiemens SIMATIC S7-1500, Mitsubishi Electric MELSEC iQ-R, Schneider Electric Modicon, OMRON NX, Rockwell Automation Allen-Bradley
Variable-frequency drivesABB ACS580, Siemens SINAMICS G120, Danfoss VLT, Schneider Electric Altivar, Yaskawa, Mitsubishi Electric
Booth ceiling and intake filter mediaFreudenberg Viledon, AAF SureStop, Camfil, MANN+HUMMEL
RTO ceramic media and burnersLantec MLM, Honeywell Maxon line burners, Riello RS, Eclipse
Conveyor gear motorsSEW-EURODRIVE, NORD DRIVESYSTEMS, Bonfiglioli, Siemens, Sumitomo Drive Technologies

Not included in the scope of supply

  • Civil works, foundations and pits
  • Building services up to the battery limit: power supply, gas, compressed air, water and drainage
  • Local permits, emission approvals and third-party inspections
  • Paint or powder supply, unless stated in the contract

Services included with every line: engineering design, manufacturing, shipping documentation, installation supervision, commissioning, operator training, warranty and spare parts.

Typical programme

The durations below are typical for equipment of this class and are given for planning; they are not the recorded schedule of this project. A complete line usually runs 90–180 days from contract to acceptance, a single unit 30–60 days.

StageTypical durationWhat happens
Site survey and workpiece review5–10 daysRemote review of drawings and photos, or an engineer visit
Layout and detail design15–30 daysLayout drawing, utilities list and specification sign-off
Manufacturing45–90 daysBooths, ovens, conveyor, pretreatment and controls built and pre-assembled at the works
Shipping20–45 daysSea freight; equipment shipped in sections for on-site assembly
Installation15–40 daysMUSI supervision with the client's installation crew or MUSI crew
Commissioning, training and acceptance7–15 daysTrial runs on the client's parts, operator training, acceptance record

Applicability and limits

Running containers and energy-storage boxes on one line assumes both use compatible paint systems and the same box dimensions; enclosures with an aluminium skin or a powder topcoat need their own stations. Output figures in the reference configuration are design values for a 20-ft box line, not measurements from this plant.

Results shown in this case study reflect the stated operating conditions and should not be interpreted as guaranteed performance under different feed, production, environmental, or site conditions.

After-sales and spare parts

Warranty on a MUSI coating line runs from acceptance: 12 months on the complete line excluding consumables, 36 months on critical components such as motors, drives and the PLC, and 60 months on structural parts such as steel structure, ducting and oven bodies. Failures within warranty, excluding misuse, are repaired free of charge.

Support starts remotely: the service line is staffed around the clock, a preliminary diagnosis with recommendations is given within 2 hours, and where a site visit is needed an engineer reaches any major city within 72 hours. A spare-parts inventory is held at the Changzhou headquarters with same-day shipping, and customers can keep a dedicated parts stock at MUSI for emergencies. Details are on the after-sales service page.

FAQ

Can standard containers and energy-storage boxes share a painting line? Yes, when they share dimensions and a compatible paint system; the enclosure recipe adds coats and masking without separate equipment, as at this plant.

What is different about painting an energy-storage box? More openings, doors and seals to cover, a longer-life exterior system and usually a rain test at the end, as shown in the reference configuration.

How fast can an energy-storage box line run? The reference layout on this page is designed for 20 boxes per 12 hours; MUSI's fastest energy-storage box lines release one finished box per minute.

How is the line laid out in the hall? Along the fabrication flow, so boxes leave welding and enter pretreatment and painting without crossing the hall.

Is the line in production? Yes, at the Taicang plant, painting container and energy-storage box bodies.

Next step: a configuration proposal for a similar line

If your parts, volumes or plant conditions are close to this project, MUSI can return a line configuration and layout proposal. To prepare it we need four things:

  • Photos and dimensions of the workpieces, with weight and material
  • Required output (pieces per hour or per day, and shifts)
  • Number of colours and how often colour changes are needed
  • Available floor space and ceiling height, with the utilities on site

Message us on WhatsApp with these details, or use the quotation form.

Published 2026-09-26 · Updated 2026-09-30 · Last technical review: 2026-09-30

Get a Similar Solution

If your industry and requirements match this case, contact MUSI to schedule a free consultation. We'll design an optimal solution based on your specific workpieces, capacity, and facility.

Provided by Lin Cong, Technical Director, MUSI Technology