Industry Overview

Steel structures and oversized workpieces are painted where the crane sets them down: a telescopic spray booth extends over the part, with blasting, airless application and VOC treatment sized to the largest piece.

Structural steel, bridge girders, pressure vessels, hull blocks, crane girders and heavy machine frames share one problem: the workpiece is too long, too heavy or too irregular to travel through a conveyorised coating line. It is moved by overhead crane or transfer cart, coated with a few layers of high-build liquid paint, and stays in one place while each coat dries.

A fixed spray booth large enough for a 20 m girder blocks the crane bay permanently, and spraying in the open workshop leaves overspray and solvent vapour in the air. The paint shop for this industry is therefore built around an enclosure that opens for the crane and closes for painting, with extraction and exhaust treatment connected at the fixed end.

Telescopic mobile spray booth fully extended over long steel beams inside a fabrication workshop, with lighting rows and white fabric walls

Typical Workpieces

  • H-beams, box columns and trusses for steel buildings
  • Bridge plate girders and crane girders up to 20 m long
  • Pressure vessels, storage tank shell plates and pipe spools
  • Oil and gas process skids
  • Hull blocks and ship sub-assemblies
  • Excavator buckets, booms and other construction machinery attachments
  • Mining truck bodies and mill shells in rebuild shops
  • Trailer chassis and agricultural equipment frames

Industry Coating Challenges

Each industry faces unique coating challenges. MUSI's solutions are designed to address these pain points directly:

The workpiece cannot come to the booth

Large fabrications are set down by overhead crane, so the painting area has to be open from above until the part is in place. A telescopic booth folds back to about 15% of its extended length — roughly 3 m for a 20 m booth — and travels on floor rails to cover the workpiece once the crane has left.

High-build coatings mean heavy overspray

Zinc-rich primers and high-build epoxy coats are applied by airless spray in thick films, and a large share of the overspray has to be caught before it reaches the fan. Paint mist is captured either by a dry filter (labyrinth paper plus glass-fibre bags) or by an oil-film purifier, each removing 98% or more of the mist.

Intermittent painting changes the VOC equation

A fabrication shop paints in batches, not around the clock, so the exhaust system is sized for the solvent load of a paint day rather than for continuous production. Activated carbon, UV photo-oxidation or carbon adsorption-desorption with catalytic oxidation (RCO) is selected for exhaust volumes of 30,000-80,000 m3/h, and two booths can share one RCO unit.

Surface preparation decides coating life

Mill scale and weld spatter have to be removed before the primer goes on. Blasting to Sa 2½ (ISO 8501-1) in a sandblasting room, with abrasive recovery and dust collection, is the step the whole coating system rests on.

Solvent atmosphere inside a fabric enclosure

The booth works with solvent-based paint inside flame-retardant PVC fabric, so the drive motors and LED lighting are explosion-proof, the cross-draft is kept at 0.3 m/s or more, and travel uses jog control with double limit switches at both ends.

Reference Booth Configurations

These are the configurations used in MUSI telescopic spray booth project designs. Each booth is sized to the largest workpiece the shop has to paint.

ApplicationInternal size (L x W x H)Paint mist captureExhaust treatment
Structural steel, bridge girders, crane girders, hull blocks20 x 10 x 4 mDry filterActivated carbon plus UV photo-oxidation
Pressure vessels, mining equipment bodies12 x 7 x 4.5 mOil-film purifierCarbon adsorption-desorption with RCO, 30,000 m3/h
Machinery attachments, trailer chassis12 x 5 x 4.1 mDry filterActivated carbon, or one RCO shared by two booths
Process skids, tank shell plates, pipe spools13 x 5 x 3 mOil-film purifierActivated carbon
Custom-engineered buildsUp to 100 x 35 x 9 mSelected per projectSelected per project

MUSI's Targeted Solutions

MUSI supplies the paint shop for large fabrications as one system — enclosure, paint mist capture, exhaust treatment and controls sized against the same workpiece envelope and the same paint schedule.

Key components are available from international brands such as SEW-EURODRIVE, Siemens, Schneider Electric and Graco, configurable per customer specification.

Recommended Equipment

Typical projects in this industry use the following MUSI products in combination — exact selection depends on workpiece specifics:

Featured Case Studies

Selected projects MUSI has delivered for clients in this industry. More projects in our Case Studies section:

Schedule a Consultation

Tell us the largest workpiece, the paint system and how many paint days you run each week, and we will come back with a booth layout rather than a price list. Talk to a MUSI engineer.

The optimal solution depends on your specific workpieces, capacity, facility, and budget. MUSI provides a free consultation service including:

  • 1-on-1 process consultation with our engineers
  • Preliminary CAD line layout
  • Equipment list and preliminary quotation
  • Reference cases from similar industries
  • Welcome to visit MUSI's factory in Changzhou

Schedule Consultation