Telescopic Spray Booths for Steel Structure Fabrication: Beams, Columns and Trusses

Provided by Lin Cong, Technical Director, MUSI Technology · Published October 1, 2026 · Last reviewed October 1, 2026

Quick answer: In a structural steel shop the crane already moves every beam and column, so a telescopic booth on rails in the painting bay lets the crane set members on stands, the booth close over them, and the painters apply primer and topcoat with airless guns while the exhaust fan draws overspray into a dry filter wall. A 20 x 10 x 4 m booth covers a batch of 12-15 m members; a 12 x 5 m booth suits smaller sections and connection plates.

Telescopic spray booth on ground rails outside a workshop under a gantry crane, with steel structures laid out for painting
Rail-mounted booth outside a fabrication shop under a gantry crane, with steel members laid out for painting.

What does the workflow look like?

Members come from blasting on rollers or by crane and are set on stands inside the booth footprint, spaced so painters can reach all faces. The booth is driven closed, the fan and lights are started, and primer is applied by airless spray. After flash-off the topcoat follows, or the members are moved to a drying area and the next batch loaded. Because the booth retracts to about 3 m, the same bay is used for fit-up when painting stops.

Indoor or outdoor?

Where the shop has no spare bay, the booth is laid on rails outside under the gantry crane. The fixed end with the filter wall, fan and stack stays in one place; the fabric is UV-stabilised. Members are laid across the rail centreline on stands so the retracted booth clears them.

How is the booth sized for steel?

Length follows the longest member plus 2 m; width follows the number of members painted at once (a 10 m wide booth takes four or five beams on stands with walking space); height follows the tallest column laid flat plus 1.5 m. At 0.3 m/s cross-draft a 10 x 4 m section needs about 43,000 m3/h, typically a 75 kW fan. Zinc-rich primers and high-build epoxies are heavy on overspray, so the labyrinth paper filter stage is essential ahead of the glass-fibre bags and the carbon or RCO unit.

Item Typical
Primer zinc-rich epoxy, 60-80 microns
Intermediate epoxy MIO where specified
Topcoat polyurethane or polysiloxane
Total DFT 200-320 microns for ISO 12944 C4-C5
Application airless spray, 1-4 painters
Booth 12-20 m long, dry filter, carbon or RCO

What about drying?

Structural coatings are normally air-dried on stands or in a warm drying area; where the schedule needs forced drying, a separate drying room is laid out next to the booth and members are moved by crane after flash-off. The booth itself is used for painting only, which keeps its fabric enclosure simple.

FAQ

Can the booth handle 15 m members? Yes, length is built in 1 m modules; 20 m booths are standard.

How many painters work at once? One to four, each with an airless unit; the airflow is sized for the section, not the painter count.

Is blasting done in the same booth? No; blasting needs an abrasive recovery floor. Use a shot blasting machine or blast room first.

What emission treatment is usual for steel shops? Carbon boxes for intermittent work; RCO where the shop paints every day.

Where MUSI Technology fits

MUSI supplies telescopic booths for steel fabricators together with roller-conveyor shot blasting and drying rooms where a full line is required. Product details, typical sizes and the quotation checklist are on the telescopic mobile spray booth page.

Provided by Lin Cong, Technical Director, MUSI Technology