Telescopic Spray Booths for Steel Structure Fabrication: Beams, Columns and Trusses

Provided by Lin Cong, Technical Director, MUSI Technology · Published October 1, 2026 · Last reviewed September 30, 2026

Quick answer: In a structural steel shop the crane already moves every beam and column, so a telescopic booth on rails in the painting bay lets the crane set members on stands, the booth close over them, and the painters apply primer and topcoat with airless guns while the exhaust fan draws overspray into a dry filter wall. A 20 x 10 x 4 m booth covers a batch of 12-15 m members; a 12 x 5 m booth suits smaller sections and connection plates.

Telescopic spray booth on ground rails outside a workshop under a gantry crane, with steel structures laid out for painting
Rail-mounted booth outside a fabrication shop under a gantry crane, with steel members laid out for painting.

What does the workflow look like?

Members come from blasting on rollers or by crane and are set on stands inside the booth footprint, spaced so painters can reach all faces. The booth is driven closed, the fan and lights are started, and primer is applied by airless spray. After flash-off the topcoat follows, or the members are moved to a drying area and the next batch loaded. Because the booth retracts to about 3 m, the same bay is used for fit-up when painting stops.

Indoor or outdoor?

Where the shop has no spare bay, the booth is laid on rails outside under the gantry crane. The fixed end with the filter wall, fan and stack stays in one place; the fabric is UV-stabilised. Members are laid across the rail centreline on stands so the retracted booth clears them.

How is the booth sized for steel?

Length follows the longest member plus 2 m; width follows the number of members painted at once (a 10 m wide booth takes four or five beams on stands with walking space); height follows the tallest column laid flat plus 1.5 m. At 0.3 m/s cross-draft a 10 x 4 m section needs about 43,000 m3/h, typically a 75 kW fan. Zinc-rich primers and high-build epoxies are heavy on overspray, so the labyrinth paper filter stage is essential ahead of the glass-fibre bags and the carbon or RCO unit.

Item Typical
Primer zinc-rich epoxy, 60-80 microns
Intermediate epoxy MIO where specified
Topcoat polyurethane or polysiloxane
Total DFT 200-320 microns for ISO 12944 C4-C5
Application airless spray, 1-4 painters
Booth 12-20 m long, dry filter, carbon or RCO

What about drying?

Structural coatings are normally air-dried on stands or in a warm drying area; where the schedule needs forced drying, a separate drying room is laid out next to the booth and members are moved by crane after flash-off. The booth itself is used for painting only, which keeps its fabric enclosure simple.

FAQ

Can the booth handle 15 m members? Yes, length is built in 1 m modules; 20 m booths are standard.

How many painters work at once? One to four, each with an airless unit; the airflow is sized for the section, not the painter count.

Is blasting done in the same booth? No; blasting needs an abrasive recovery floor. Use a shot blasting machine or blast room first.

What emission treatment is usual for steel shops? Carbon boxes for intermittent work; RCO where the shop paints every day.

Where MUSI Technology fits

MUSI supplies telescopic booths for steel fabricators together with roller-conveyor shot blasting and drying rooms where a full line is required. Product details, typical sizes and the quotation checklist are on the telescopic mobile spray booth page.

Provided by Lin Cong, Technical Director, MUSI Technology

Need a quotation for your line?
Send us your part size, throughput and coating type — our engineers reply within 24 hours, and a layout and budget follow once your part data is complete. Contact MUSI Technology or browse our equipment range.

Related technical guides

Q

Questions buyers ask before ordering

quotation · price · lead time · installation · warranty

What information do you need to prepare a quotation?

Send part drawings or photos, the largest part size and weight, the material, the required output per shift, the paint or powder type and number of colours, and the available floor space, ceiling height and power or gas supply. MUSI engineers reply within 24 hours; a recommended configuration and quotation follow once your part data is complete.

How much does this equipment cost?

Budget depends on part size, throughput and the level of automation. Indicative ex-works ranges are published in our liquid spray line cost guide; a configured quotation is prepared from your part data. Published indicative ranges: compact manual liquid spray booths from around USD 15,000–40,000, semi-automatic lines with conveyor and flash-off/curing ovens roughly USD 80,000–400,000, and fully automatic multi-colour electrostatic lines from USD 400,000 to several million dollars.

What is the lead time?

Standard configurations ship in 30–60 days from contract signing and down payment; custom configurations take longer. The delivery date is fixed in the contract.

Do you install and train operators overseas?

Yes. MUSI engineers carry out on-site installation and commissioning and give 3–5 days of operator and maintenance training. MUSI has delivered 800+ coating lines to customers in 36 countries.

What warranty and after-sales support are included?

12 months full-machine warranty, 36 months on critical components and up to 60 months on structural parts. International customers get 24-hour phone response and 72-hour on-site arrival; spare parts ship from the Changzhou headquarters.

Can the environmental equipment be supplied with the line?

Yes. VOC treatment (RTO, RCO, activated carbon, zeolite rotor), dust collection and paint wastewater treatment are supplied with the coating line under one contract; MUSI has equipped 50+ coating facilities whose projects all passed local environmental compliance reviews.

Request a configured quotationWhatsApp +86 181 5173 1332 · lin@coating-spray.com